Northem States Power Company 414 Nicollet Mall MinneapoUs, Minnesota 55401 1927 Telephone (612) 330-5500 Monticello Technical Specifications November 11, 1994 Section 6.7.A.3 US Nuclear Regulatory Commission Attnt Document Control Desk J
Washington, DC 20555 j
MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Monthly Operating Report October, 1994 for October, 1994, for the Monticello Attached is the Monthly Operating Report Nuclear Generating Plant.
O ' E 04 p
Roger O Anderson Director Licensing and Management Issues Director, Office of Resource Management c
Regional Administrator-III, NRC NRR Project Manager, NRC NRC Resident Inspector T
State of Minnesota - Kris Sanda
)
Attachment k
R UCK G5000263
/
1 PDR
OPERATING DATA REPORT DOCKET NO.
50-263 DATE 11-1-94 COMPLETED BY H.
H.
Paustian TELEPHONE 612/295-5151 OPERATING-STATUS
] Notes
]
1.
Unit Name :
Monticello
]
]
2.
Reporting period:
October
]
]
- 3. Licensed Thermal Power (MWt ) :
1670
)
]
4.
Nameplate Rating (Gross MWe) :
569
]
]
5.
Design Electrical Rating (Net MWe) :
545.4
]
]
- 6. Maximum Dependable Capacity (Gross MWe) : ~-564
]
]
7.
Maximum Dependable Capacity (Net MWe):
536
)
]
8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9.
Power Level To Which Restricted, If Any (Net MWe).
N/A
'10. Reasons For Restrictions, If Any: __N/A THIS MONTH YR.-TO-DATE CUMULATIVE
- 11. Hours In Reporting Period 745 7296 204577
- 12. Number.Of Hours Reactor Was Critical 223.4 6234.9 165610.6
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 940.7
- 14. Hours Generator On-Line 174.7 6148.0 162748.7
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 272496 9962158 251226938
- 17. Gross Electrical Energy Generated (MWH) 91571 3351334 84905997
- 18. Net Electrical Energy Generated (MWH) 85378 3206595 81225388
- 19. Unit Service Factor 23.5%.
84.3%
79.6%
- 20. Unit Availability Factor 23.5%
84.3%
79.6%
- 21. Unit Capacity Factor (Using MDC Net) 21.4%
82.0%
74.1%
- 22. Unit Capacity Factor (~Using DER Net) 21.0%
80.6%
72.8%
- 23. Unit Forced Outage Rate 0.0%
3.1%
3.6%
- 24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)
- Refueling Outage - None
- 25. If Shut Down At End Of Report Period, Estimated Date Of Startup:N/A 26.' Units In Test Status (Prior to Commercial Operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION w i-,
r
.a-e
~.. -.
. ~..
h AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-263 UNIT Monticello DATE 11-1-94 COMPLETED BY H.
H.
Paustian TELEPHONE 612/295-5151 i
-MONTH OF October DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1
-2, 17
-5.
2
-3, 18
-3, 3
- 2.
19
-4.
4
-3.
20
-9.
5
-4.
21
-5.
6
-3.
22
-8.
7
-3.
23
_-11 8
-3.
24 12, 9
-3.
25 296.
10
-3.
26 546.
11
- 2.
27 554.
12
-3.
28 557.
i 13
-3.
29 556.
14
-3.
30 556.
I 15
~7 31 554.
16
-5.
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
I f
,y.r 7
e.
. m
1 NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE J
)
DOCKET NO.
50-263 DATE 11-1-94 COMPLETED BY H. H.
Paustian TELEPHONE 612/295-5151 MONTH OCT 10-01-94 to Shutdown for 1994 Refueling Outage.
10-24-94 10-24-94 to Power operation.
10-31-94 C
Note: Power operation defined as essentially 100% of rated power except for weekend load drops for specified surveillance testing.
UNIT SHITTDOWS AND P0ilER REDUCTIONS DOCKET NO.
50-263 UNIT NAME Monticello DATE 71-01-94 COMPLETED BY ~11. H. Paustian REPORT MONTH _ 0ctober _
TEIIPHONE [612/295-5131 -
No.
Date Duration Reason Method LER S stem Comp.
Cause & Corrective Ty(pe (hours)
(2) of No.
e Code Action to 1) shutdown (4)
(5)
Prevent Recurrence (3) 6 10-01-94 S
570.3 C
1 N/A Plant shutdovn for 1994 (EOC16) refueling outage.
1 2
3 4
F: Forced Reason:
Method:
Draft IEEE Standard S: Scheduled A-Equipment Failure (Explain) 1-Manual 805-1984(P805-D5)
B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram 5
D-Regulator Restriction 4-Other (Explain)
IEEE Standard 803A-1983 E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
-