ML20080A349

From kanterella
Jump to navigation Jump to search
Final Significant Deficiency Rept 83-03 Re Potential for Misoperation of DS-416 Reactor Trip Switchgear Undervoltage Attachments.Four Replacement Undervoltage Attachments to Be Installed Prior to Initial Operation
ML20080A349
Person / Time
Site: Beaver Valley
Issue date: 01/05/1984
From: Woolever E
DUQUESNE LIGHT CO.
To: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
2NRC-3-106, 83-03, 83-3, NUDOCS 8402030467
Download: ML20080A349 (4)


Text

!

I e

jme, 7%

2NaC-3-iO6 4

(412) 787 - 5141 Telecopy

-o Nuclear Construction Division January 5, 1984 Robinson Plaza, Building 2, Suite 210 Pittsburgh, PA 15205 United States Nuclear Regulatory Commission Regica I 631 Park Avenue King of Prussia, PA 19406 ATTENTION:

Mr. Richard W. Starostecki Division of Project ard Res ident Programs

SUBJECT:

Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 Pot ent ial fo r Misope ra t io n of DS-416 Re act o r Trip Switchge ar Unde rvo it age At t achment s Significant Deficiency Report No. 83-03 Gentlemen:

Purs uant to the req ui rement s of 10 CFR50.5 5 (e), the " Final Report on the Potent ial for Misoperation of DS-416 Reactor Trip Switchgear Undervolt age A t t achme nt s" is at t ach ed fo r your review.

If there are any ques t ions con-cerning this report, please cont act the Beaver Valley Unit 2 Project Of fice.

DUQUESNE LIGHT COMPANY By

[

~E (fJ."Wooleve r JMM/wjs Vice President At t achment s cc:

Mr. R. DeYoung, Director Of fice of Inspect ion and Enforcement (3) (w/ attachment s)

Mr. G. Walton, NRC Resident Inspector (w/ attachments)

Ms. L. Lazo, Project Manager (w/ attachment s)

NRC Document Control Desk (w/ attachments)

INPO Records Center (w/ attachment s)

SUBSCRIBED AND WORN TO BEFORE ME THIS Sf/DAYOF Jgrunu 1984.

f

/&

iv Not ary Public ANIT A ELAINE fiEITER, NOTARY PUBLIC ROEIN3ON TOWNSMiP, ALLECHEMY CCUNTY MY COMMISSION EXFIRES CCTOBER 20,1986 o

n\\

b I 8402030467 840105 U

PDR ADOCK 05000412 S

PDR

,g

d ?.

o United Stcteo Nuclear Regulf. tory Commission 4

Dr. 'thonto E. Murley Page 2 e

COMMONWEALTH OF' PENNSYLVANIA )

) SS

,3 9

-COUNTY 0F ALLEGHENY

)

On this

[d day of 2/4/4//,

/M[ before me, a Not ary Pub lic in and for ~ said Commonbith and County, personally _ appeared E.

J.

Woolever, who being duly sworn deposed and said that (1) he is Vice -President

~

of Duquesne Light, -(2) he Lis drly authorized.to execute and file the fo re.

going Submittal on behalf of said Company, and (3) the statement s set fo rt h in the1 Submittal are true and correct to the best of his knowledge.

/

Not ary Pub lic ANITA ELAINE REITER, NOTARY PUBLIC ROBINSON TOWNSHIP, ALLEGHENY COUNTY MY COMMISSION EXPIRES OCTOBER 20,1986 1

4

.,,,-cr--

r-re w

~

e,-

,--e

--,aw,.

,e

-m e

,m-,.

e Y

BEAVER VALLEY POWER STATION Uf71T NO. 2 DUQUESNE LIGHT COMPANY Final Report on the Potential for Misoperation of DS-416 Reactor Trip Switchgear Undervo lt age At tachment s 1.

SUMMARY

On March 30, 1983, Wes t inghouse (W) advised af fect ed operating plants of the potent ial for misoperation of DS-416 reactor trip switchgear undervol-t age at t achme nt s based on repo rt ed mal funct io ns at one pla nt during testing.

W advised operating plants on April 15, 1983, of an addit ional misopera-t ion of anot he r DS-416 unde rvo lt age at t achme nt.

Inves t iga t ion of this event revealed a missing ret aining ring on one of the two unde rvo lt age attachment pivot sha f t s.

2.

IMMEDIATE ACTION TAKEN On April 20, 1983, W advised the Nuclear Regulatory Commission (NRC) of the potential for misoperation of DS-416 reactor trip switchgear undervol-t age at t achme nt s.

S.

D.

Hall, Duquesne Light Com pa ny, not ified E.

Brunner, Region I of fice, on April 26, 1983, that an evaluation of this problem for Beaver Valley Unit No. 2 (BVPS-2) was underway.

3.

DESCRIPTION OF DEFICIENCY W advised Based on report ed mal funct ions at one plant during testing, -

af fected operating plants on March 30, 1983, of the pot ent ial for misope r-ation of DS-416 reactor trip switchgear undervoltage at t achment s. W began an evalua t io n of the input fr om several af fect ed ope ra t ing plant s con-cerning dimensions of several clearances in the undervoltage att achment.

On April 15, 1983, W advised operating plant s of a'n additional misopera-t ion of anot he r DS-416 unde rvo lt age at t achment.

Inves t iga t io n of this evcat revealed a missing retaining ring on one of the two unde rvo lt age a t t achment pivot shafts.

This al iawed the pivot shaft to nove la t e ral ly such that one end came out of its guide 1. ole in the frame of the undervol-tage attachment, and did not permit the attachment to operate on demand.

4.

ANALYSIS OF SAFETY IMPLICATIONS W evaluated the input fr om several af fect ed operating pl ant s conce rni ng dimens io ns of several c le arances in the unde rvo lt age at t achme nt and c onc luded that devi at ions from the recommended c learances could inc reas e the pot ent ial fo r misope ra t ion of the at t achme nt, the reb y creating a condition wherein the reactor trip switchgear might not open on automatic demand from the reactor protection system.

The W evaluat ion of the ret aining ring issue reve aled a disc repancy in design.

The gr oove in the shaft receiving the ret a ini ng ri ng was not increased in width to be cons is t ent with an earlier (1972) retaining ring

.s:. S.

e design ch ange. - The - new ret aining ring ~is wider than the original design and ' does. not seat properly in the existing grooves.

This disc repancy increases' the - pot ent ial for micoperation - of the DS-416 unde rvo it age

- att achment, thereby creating a condition wherein the reactor trip switch-gear might not ope n on automatic demand from the reacto r prot ect ion s ys tem.'

5.

CORRECTIVE ACTION TO REMEDY DEFICIENCIE3 Four replacement ~ unde rvo lt age at t achment s will be installed on DS-416 reactor trip switchgear for BVPS-2 prior to initial plant ope ra t io n.

The new attachment s have modified (widened) grooves to ac comodat e the new

- retaining rings.

6.

ADDITIONAL REPORTS This is the final report - on this subject.

No additional reports will be issued.

I