e FRIliql PAL STAFt' FRA L iri;:
c.
asa 4cs
%"3 VRA L j AO
@ COnSum6fS SFf<P i3 LO I
l1, l
Power o
-i
.s I
James W. CoeC =%una_J s
C0mpany nema-and ConstructiidL l
lF\\LG j J General o f fices: 1945 West Parnall Road, Jackson, MI 49201. (G17) 788-0453 July 12, 1983 So. 3s9 So 330 Mr J G Keppler, Regional Administrator US Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND E11ERGY CENTER DOJKET No 50-329 Ar0 50-330 - AENDED MIDLAND PROJECT FESPONSE TO NRC, REGION III LET'tER DATED MAY 23, 1983 File: 0485.16 UFI:
42*05*22*04 Serial: CSC-6761 0.4.2 70*01
REFERENCES:
(1) J W Coak letter to J G K<.ppler, dated June 24, 1983, Serial CS0-6764 (2) J C Keppler letter to J W Cook, dated May 23,1%3 This letter, including Attachment 1, and in addition to Reference 1, provides our amended response to Reference 2.
We appreciate your consideration in extending the due date for this response in order that our personnel could properly examine the vendor information available and hopefully provide a thorough and accurate response. This was discussed with your Mr. R. Cook.
NG Q
JWC/ BHP / Elm cc: RFWarnick, NRC Region III JJHartfson, NRC Region III RNGardner, NRC Region III RJCook, NRC Senior Resident Inspector, Midland Site RBLandsman, NRC Region III BLBurgess, NRC Resident Inspector, Midland Site O
m 2o 1983 -
OC0783-0004A-CN01 O
\\\\,
CONSUMERS POWER COMPANY Midland Units 1 and 2 Docket No 50-329/50-330 Letter Serial CSC-6781 Dated July 12, 1983 At the request of the Commission and pursuant to the Atomic Energy Act of 1954, and the Energy Reorganization Act of 1974, as amended and the Commission's Rules and Regulations thereunder, Consumers Power Company submits the amended response to J G Keppler letter to J W Cook dated May 23, 1983.
CONSUMERS POWER COMPANY By J A Cook,'Vice Presidert Pro /ets, Engineering and Construction Swornandsubscribedbeforemethis/
day of
/ M.
_$3ue d. /2/,6s Notary Public l'
My Ccmmission Expires 2 -Y-[d7 i
PATRICIA A. PUFFER 1
Notary Public, Bay County, Mt My Commission Expires Mar. L 1W 9
4
'l c
1 OC0783-0004A-CN01
_,..._m,
.---..m.___-
Amended Response to J-G Keppler letter to J W Cook dated May 23, 1983 The amended response to J G Keppler letter to J W Cook dated May 23, 1983 is submitted in the following format:
NOV Item B Identification Number A.
Statement of Original Violation (from J G Keppler letter to J D Selby dated February 8, 1983: Notice of Violation EA 83-3.)
B.
Request For Additional Information (from J G Keppler letter to J W Cook dated May 23, 1983.)
C.
Statement of Additional Information 1.
Adaission or denial of the alleged violation 2.
The reasons for the violation, if admitted 3.
The corrective steps which have been taken and the results achieved 4.
The corrective steps which will be teken to avoid futher violations 5.
The date when full compliance will be achieved-t h
\\8 t
h i
e k
1 i
OC0783-0004A-CN01
OL/0M SERVICE LIST Mr Charles Bechhoefer, Esq Mr Frank J Kelley, Esq Administrative Judge Attorney General of the Atomic Safety & Licensing Board Panel State of Michigan U S Nuclear Regulatory Commission Mr Stewart H Freeman, Esq Washington, DC 20555 Assistant Attorney General Environmental Protection Div 720 Law Building Lansing, MI 48913 Dr Frederick P Cowan Mr Myron M Cherry, Esq Administrative Judge Cherry & Flynn 6152 N Verde Trail 3 First National Plaza Apt B-125 Suite 3700 Bcca Raton, FL 33433 Chicago, IL 60602 Mr Michael Miller. Esq Mr Wendell h Marshall Isnam, Lirceln & Beala RFD 10 3 First National Plaza Midland, MI 48640 Suite 5200 Chicago, IL 60602 Mr 0 F Judd, Sr Project Manager Mr John DeFeester The Babcock & Wilcox Company Dow Chemical 3uilding P O Box 1260 Michigan Division Lynchburg, VA 24505 Midland, MI 48640 Atomic Safety & Licensing Board Panel Ms Mary Sinclair U S Nuclear Regulatory Commission 5711 Summerset Street Washington, DC 20555 Midland, MI 48640 Atomic Safety & Licensing Board Panel Mr Steve Gadler U S Nuclear Regulatory Commission 2120 Carter Avenue Washington, DC 20555 St Paul, MN 55108 Mr William D Paton, Esq Mr Lee L Bishop Counsel for NRC Staff Harmon & Weiss U S Nuclear Regulatory Commission 1725 I Street, NW #506 Washington, DC 20555 Washington, DC 20006 Ms Barbara Stamiris Mr C R Stephens 5795 North River Road Docketing and Service Station Route 3 Office of the Secretary Freeland, MI 48623 U S Nuclear Regulatory Washington, DC 20555 Dr Jerry Harbour Lynne Bernabei U S Nuclear Regulatory Commission Governmental Accountability Atomic Safety & Licensing Board Panel Proj ect (GAP)
Washington, DC 20555 1901 Q Street NW Washington, DC 20009 OC0783-0004A-CN01
NOV Item B - 2.a (82-22-08)
A.
Statement of Original Violation
" Measures were not established for the selection and review for suit-ability of application of "Q" materials associated with the diesel gener-ator exhaust muffler in that design drawings and specifications did not indicate the material identity of the installed muffler saddle supports and plates."
B.
Request For Additional Information "Regarding Item B.2.a we reiterate our position'that the lack of design documentation which specified the material requirements for the diesel generator exhaust mufflers constituted an item cf noncompliance. Please provide any additional information supplied by the vendor regarding the traceability of the exhaust muffler materials, and au appropriate, your corrective actions and the results achieved, corrective actions taken to avoid further noncompliance, and the date when full compliance will be achieved."
C.
Statement of Additional Information 1.
Thc violation is admitted.
2.
The violation occurred because the design intent was not implemented in the design, fabrication and inspection of the exhaust silencers by the diesel generator prime supplier, Transamerica Delavel, Inc.,
(TDI). This was not recognized or corrected by the design organiza-tion responsible for the procurement. The design intent was that the diesel generator exhaust silencers be subject to the appropriate elements of 10CFR50, Appendix B, and ANSI N45.2-1971.
The Bechtel procurement documents for the diesel generators specify the functional performance requirements of the diesel generators.
It is not the intent to specify all details of design and construction.
The expertise for the detailed design and construction of the diesel generator and accessories rests with TDI.
i The procurement documents (Specification 7220-M-18, Paragraph 12.2) specified; " Quality assurance requirements are applicable to all i
components and assemblies which affect the reliability and ability of the equipment furnished by the Seller to perform its design function."
Additionally, the specification provides a check of this requirement by requiring the vendor to submit a list of all items which he intends to supply as "Q" for review by Bechtel. When properly implemented, these requirements in Specification 7220-M-18 provide adequate direc-l tion to the vendor and control by Bechtel. Bechtel did not take l
action to correct the failure of TDI to fully comply with the require-ments of Specification 7220-M-18, Paragraph 12.3 to submit a " list of all items to be furnished to quality control standards."
l l
OC0783-0004A-CN01 i
L
TDI has stated that they had not previously provided safety-related exhaust silencers to others, and did not consider the silencers to perform an active safety-related function. Specification requirements were not understood by TDI to apply to the exhaust silencers. As a result, the exhaust silencers were not included as an item to be safety-related. TDI procured the exhaust silencers from a sub-supplier, American Air Filter (AAF), with essentially commercial quality standards. TDI did specify to AAF that material cert-ification, weld procedures, and weld procedure qualifications be provided. AAF did not fully comply with the purchase order require-ments of TDI. TDI did provide a seismic analysis of the exhaust silencers to verify the capability to withstand a safe shutdown earthquake.
The procurement documents leave the selection of materials for cons-truction of the exhaust silencers to TDI and AAF. The materials of construction were selected by AAF and specified in the fabrica. tion drawing based on its experience. Common grades of steel (e.g., A-36 and A-569) are typically used.
TDI provided a certificate of conformance to the purchase requirements fer the exhaast silencers and the saddle suppport modification plates as required by the procurement documents. That information is on site.
If the exhaust silencers and saddle support modification pistes had been identified by TDI as having e safecy-related functicn. they would have been included under the TDI quality assurance program.
That pro 5 ram would have required actions to be taken to assure approp-riate material identification and control. Specific material trace-ability (i.e., certified material test reports) is not applicable because of the design and function of these items.
3.
The following corrective action for the exhaust silencers has been taken: We have met with TDI and visited AAF, and subsuppliers at their facilities, and reviewed all available purchasing and quality documentation. TDI will provide a Material Certificate of Compliance to confirm that the materials used were consistent with the seismic analysis. TDI has been directed to provide a fabrication inspection procedure to verify that construction of the exhaust silencer satis-fies the design and seismic analysis. This inspection will be per-formed on site under the direction of MPQAD.
If any deficiencies are found during the inspection, the silencers will be reworked to conform to the requirements.
In accordance with the partial redisposition of NCRs 4693 and 4994, muffler saddle support end and center support plate extensions are to be replaced because the dimensions of the slots / holes do not conform to the design drawings.
Replacement plates will have material cer-tificates of compliance.
Project Engineering and TDI have reviewed the technical specifications to determine if other items have been considered to be non-safety rela ~ed contrary to the deeign intent. To date, the intake air OC0783-0004A-CN01
filters, intake air silencers, intake air flexible connectors, and exhaust expansion joints have been identified as not being considered safety related by TDI, and consequently not provided as safety related. An action plan to upgrade these items to safety-related-status by verifying that the construction of these items satisfies the design and seismic analysis is underway. NCRs M-01-9-3-158 and 4955 have been written to document the indeterminant status of these components.
Further investigation to ascertain if there are any additional suspect items in the package provided by TDI is in progress and is expected to be complete by August 15, 1983.
4.
The general approach to ensure that purchased material / equipment is fabricated in accordance with the specification requirements is as follows: The Project Engireering review and acceptance of vendor submitted dccuments required by the specificaricu such as drawinga, procedures, and quality assuraace manual; the Procurement Supplier Quality Department's performance of audits on adequacy of vendor quality program implementation and source rurveillance inspections at the vendor's facility ao required by the purchase order; the QC performance of receipt inspection to verify supplier submittal of the required documentation on "Q" items that are received on site; the Supplier =rua}.ity Keview of the required documentacion for adequacy; and MPQAD 'QA performance of a qtiality overview inspection on se.lected items on site.
In view of the experiences on this procurement, we will' conduct a review of functional / performance oriented procurements which contain "Q" and non "Q" items to verify that safety-related items were desig-nated by the vendors in accordance with project design requirements.
A review program and schedule will be developed by September 10, 1983.
5.
Full compliance will be achieved when:
a) Receipt of the exhaust silencer Material Certificate of Compliance and completion of the fabrication inspection is expected by Cctober 15, 1983. A schedule for any subsequent rework as a result of the inspection will be established at that time.
b) The exhaust silencer saddle support and center support plate extensions are replaced and NCRs 4693 and 4994 are dispositioned.
c) NCRs M-01-9-3-158 and 4955 will be resolved by October 15, 1983.
A schedule for any subsequent rework resulting from this resolu-tion will be established then.
d) Further investigation to ascertain if there are any additional suspect items in the package provided by TDI is expected to be complete by August 15, 1983.
OC0783-0004A-CN01
s' l
L 1
a I
e) The review program and schedule described in part 4 and the i
subsequent review is completed and any findings are addressed.
1 1
4 t
i i
J e
a 4
1 4
lt 1
4 f
i.-
I l
J t
i t
d.
h-k i.
OC0783-0004A-CN01 i
i k
- 9'-'N*Tgt'f*wgry etAM
-gerg's %y h +g y ic e pe9sg.r.y, q ww-m mM*14r-si e yy wynw qsW'p e. gra y.h pg
.gye ersM M pes, ygw-n y pw p r.e p. %.e g q g,ey-
.-ere-W- m wyeP76 g
o 1
BCC W R Bird, P14-418A J E Brunner, M1079 F W Buckman, P14-113A D M Budzik, P124-517 M L Curland, MPQAD M A Dietrich, Bechtel F D Field, Union Electric J F Firlit, JSC236A W J Friedrich, MPQAD/QC W D Greenwell, Bechtel AA G A Hierzer, Bechtel R C Hollar, Bechtel AA E M Hughes, Bechtel AA K E Marbaugh, QA-NO,-Midland B W Marguglio, JSC220A D B Miller, Site Manager (3)
NRC Correspondence File, P24-517 J A Rutgers, Bechtel AA P Steptoe, IL & B, Chicago R A Wells, MPQAD F C Williams, IL & B Washington i
J e
OC0783-0004A-CN01
-