Public Version of Rev 2 to Emergency Plan Implementing Procedure 1004.32, Activation of Annex to Nearsite Emergency Operations Facility
ML20079S449
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 06/02/1983
From: Stange S
GENERAL PUBLIC UTILITIES CORP.
To:
Shared Package
ML20079S444 List:
References
0019W, 1004.32, 19W, NUDOCS 8307110599
Download: ML20079S449 (14)


Text

,I t .

~

1004.32 Revision 2

  • ' 1 j

O ~

THREE MILE ISLAND NUCLEAR STATION UNIT NO. 1 EMERGENCY PLAN IMPLEMENTING PROCEDURE 1004.32 l

ACTIVATION OF THE ANNEX TO THE NEARSITE EMERGENCY l OPERATIONS FACILITY (CRAWFORD STATION) l

~ 1 1.0 PURPOSE  !

I The purpose of this procedure is to provide guidelines for the i

Maintenance and Construction Coordinator to activate the Anne to the Nearsite Emergency Operations Facility (AEOF). The Maint an d Construction Coordinator is responsible for implement rocedure.

2.0 ATTACIEENTS l l

2.1 Attachnent I - Gro eader-Maintenance rt c klist 1 2.2 Attachnent II - ader-Security ort hec klist l D

2.3 Attac hnent oup Leader-Radi log 1 Controls Support Check 1 s 2.4 Attac V - Floor Plan p 1 fon assignments of the AEOF.

2.5 Attachnent Y - AEOF Showe system schema 3.0 EMERGENCY ACTION LEVELS 3.1 This procedure t e ated upon dec n f any of the following:

3.1.1 ency 3.1.2 ral Emergency 3.1.3 When deemed necessary by the Emergency Director.

~

4.0 EMERGENCY ACTIONS Initials 4.1 Coordinate the activation of the AE0F as follows:

s J

s 0 1.0 8307110599 830624 PDR ADOCK 05000289 F PDR

. ~ - - - - - ,,,,,w. --- - - . -

l -

. 1004.32 Revision 2

) Initials 4.151 Group Leader - Security Support report to the Crawford

->- ' Station and complete the Group Leader - Security Support Checklist (Attachment II) contained in the TMI Emergency Support Kit, which is located in the Crawford Station Office.

4.1.2 Group Leader - Radiological Controls ra he Crawford Station and complete the G e r-Radiological Controls Checklist ta nt III) contai e TMI Emergency p Kit, which is lo he Crawford Stat dir ice.

4.1.3 G i' der - Maintenan e op ort report to the Crawford ation and complete oup Leader - Maintenance

' upport Check 11 hment I) contai d in the TMI Emergency S t htt, which is locate he Crawford Station v 4.2 The Maintenance onstruction Coordi 11 perfonn the following f o :

4.2.1 i a man to the Opera 1 Line to log all calls sen and received in the Telephone Communication Logsheet (refer to EPIP 1004.5, Comunications and Recordkeeping, Attachment II).

4.2.2 Inform the Group Leader - Administrative Support (at the NEOF) that the AE0F is operational when Radiological Controls, Security and Maintenance groups are functional.

1

.s 2.0

. . - . . . . - . - . - . . . . . ~ - . . . . . . . . . - - . .- . . . - - . .. . _ . .

1004.32 Revision 2 C. Initial s -

4.273 Establish an emergency personnel duty roster /3 section

'2 - watch. ,

Update Group Leader - Administrative, Support of personnel

, .4.2.4 assignments / status.

4.2.5 Dispatch assistance, equipment, etc. as re d from the Group Leader - Administrative Supp 4.2.6 When necessary, direct the Group Lea - urit;y Support to contact the PEMA duty f or the State Polic est assistance fic control in the si tion. Q

NOTE-  :
9-783_8150  :
Pennsylvania e  :
9-234-4051  :

4.2.7 Ensure th a king place is e lis e to begin proce onnel for ent tert site. This is to be conjunction wi e ty personnel and a ical Controls s ative for security rance and dosimetry, respectively.

4.2.8 Instruct the personnel assigned to processing to ensure

! perinission is received from the Emergency Support Director, via the Emergency Support Communicator, prior ,

to allowing personnel access to the site.

4.2.9 Ensure that a training area is established to provide the necessary infor1 nation for the badging process.

3.0

-. . . - - - . a - ,, . , . - - . . , , - . , , , _ , , , . , - , , ,.,,,..--,n , ,-,,n.,,n . ,-.a ., ,,.-,e,,n.-.,__,-_n,~,,,.,.n ,- ..$

1004.32

. . Revision 2 i 5.0 FINAL CONDITIONS Initials 5.1' 2 The AEOF'is operational with the desired positions manned and <

, functional. Communications are established among the necessary organizations and agencies.

5.2 All che::klists have been collected and infor1 nation ted to the Group Leader - Administrative Support.

O P 4

0+ v g C .

t 4.0 l

i 1004.32 Revision 2

'f', ACTIVATION OF THE.AEOF (CRAWFORD STATION) ,

ATTACHMENT I

\

GROUP LEADER - MAINTENANCE SUPPORT CHECKLIST  ;

-3 . ,

Initials , l

1. Establish a working place to coordinate the allocation of personnel and equipment (both GPU-Nuclear and from other sources necessary), as requested by the Emergency Support or (See Attachment IV).
2. Remove phone from Emergency Kit and plug in a o activate. (See Attachment IV for ion)
3. Start the Gro e Maintenance Su g. (Procedure 1004.5, Attachment I)
4. Develo tchbill to support np emergency maintenance

(, activities nd off-site ma e management. 11ect completed checklists from other p ders.

5. Notify the Maintenan onstruction Co r that the duties of the Group Le Maintenance Supp ve been assumed.

NAME A TIME DATE (Grou der - Maintenance Support) 5.0 l

1004.32 Revision 2

' F') ACTIVATION OF THE AEOF j i

! ATTACHMENT II l

-3 . GROUP LEADER - SECURITY SUPPORT CHECKLIST , l Initials ,

1. Establish a working place to coordinate Security activities (See Attachment IV).
2. Remove phone from Emergency Kit and plug into ja tivate (See Attachment IV for location).
3. Establish radio and telephone comunicati the Security Coordinator on-
4. Start the Gr r - Security Sup g in accordance with Procedur ttachment VI.
5. Ensur te security coordin akes the following assignments:

( a. Asrign an SP0 to ma urity desk at t Nearsite Emergency Opera F lity to permit acces o the NEOF only to pers lorized by the e Support Director s designee.

b. Assig 's to the North an gates to restrict ingress '

, or f personnel and v s, with the exception of emergency vehicles, and personnel and vehicles authorized access to the island by the Emergency Director or his designee.

! 6.0 l

__T _. - - ..

1004.32 Revision 2

'ln3 ACTIVATION OF THE AEOF

~~

ATTACHMENT II (Cont'd) .

- i. GROUP LEADER - SECURITY SUPPORT CHECKLIST ,.

Initials ,

c. Assign SP0's to either the Processing Centers, or other locations as necessary, to restrict access to r ected Area to those personnel authorized by the n Director, Emergency Support Director, or their alternates.
6. Establish a watchb 1 for your organizat .
NOTE: T r of SP0's assi the Processing  :
r should be kept to q) inimum to limit the dose :
c i ed by the Secu p onnel, and to leave the :
open for eme e erations.  :
7. Inform Maintenance an r tion Coordin r that the duties

(~ ,

of the Group Leader - c Support have b med.

8. Contact State Polic o 1 rt them for po s affic control and other support de .

NAME /s< TIME DATE (Group Le - Security Support) l l

4 I

~

l l

l 7.0

_ ~ . _ , _ . - , _ . - - -

+

1004.32 R visien 2 j ACTIVATION OF THE AE0F ATTACHMENT III GROUP LEADER - RADIOLOGICAL CONTROLS SUPPORT CHECKLIST l a

Initials

1. Assign a phonetalker to maintain communication on the iological I

Line in order to maintain current on the plant statu truct the phonetalker to log all calls, except those inconsequential nature on the Telephone C u ns Logsheets (Attachment II of Communications an dkeeping procedure, 1004.5). 9

2. Obtain pho f Emergency Kit pl in to activate (See Attac IV .

( 3. Start the oup Leader - R o al Controls S ort (GL-HP) Log in accordance with pro du 04.5, Attachme

4. Assure manning of t fo wing positions b t ection Personnel
a. Radiologic Contr s Manpower Su rdinator: Who is responsi coordinating sources to staff both ons o fsite Radiologi rols requirements on a rotati shift basis.
b. Personnel Monitoring Coordinator: Who is responsible for establishing and maintaining a whole body counting facility, and TLD issuance and maintenance, to include offsite personnel reporting to support TMI.

8.0

~ *

  • 1004.32 )

. . Revision 2 C i ACTIVATION OF THE AE0F

~

ATTACHMENT III (Cont'd) ,

2 GROUP LEADER - RADIOLOGICAL CONTROLS SUPPORT CHECKLIST <

Initials ,

5. Detemine from the Radiological Assessment Coordinator the need for additional Radiological Controls facilities to suppo ite activities, and make necessary contacts to obtai (as per 1004.6).
6. Develop a watchbill for your organization
7. Notify the Main nd Construction oo ator that the duties of the Group e Radiological Co have been assumed.
8. Assign a i al to the Maint na e nd Construction Coordi to issue dosimetry o sonnel being processed for TMI access.
9. Coordinate vehicle an s 1 decontamination p procedure 1004.20 and 1004. .
10. Complete the fo 'ng steps if it bec essary to activate the decont t facility.
a. Set t second floor shower li ty.
b. Obtain CAUTION signs from the emergency locker and proceed to the first floor store room area directly below the shower.
c. Locate the Sewer Drain Valve No.1 and the Decon Tank Drain Valve No. 2 and ensure that the shower drain is diverted to the Decon Tank by closing the nomally open Sewer Drain Valve (No.1) and opening the nomally closed Decon Tank Drain Valve (No.2)(See Attachment V).

i 9.0 l

l

4- ,

~

1004.32 R: vision 2 rq ACTIVATION OF THE AEOF ATTACHMENT III (Cont'd)

~ ~

. GROUP LEADER - RADIOLOGICAL CONTROLS SUPPORT CHECKLIST

, d. Post one CAUTION sign on each drain valve to eliminate inadvertent operation of those valves.

e. Ensure that the tank vent is open, and that the drain valve is closed. Also ensure that the valve he tank and the level guage is open (See Attachme V).
f. Make necessary arrangements to have t pumped before it becomes ful PIP 1004.6 for needs).
g. DO NOT E,XCE 2 HOUR OF CONTI Op OWER USE without checki tank level guag ca d at the tank. The tank full when the gu es 46". If the guage reads 0, t e may be as m /2" of water the tank.
h. Upon termination th ed for further el decontaminatio the shower as ATED AREA and make arran s to have the sho r dr ins, pipes, valves, and ta e nu minatied as ne NAME TIME DATE (Group Leader - Radiological Controls Support l 1

l 10.0

%* s ,

,- - - , , _ - ~ - ,

o

~ '

1004.32 Revision 2

'r ACTIVATION OF THE.AEOF (CRAWFORD STATION)

ATTACHMENT IV FLOOR PLAN AND POSITION ASSIGNMENTS-AEOF

, e

1. Maintenance and Construction Coordinator
2. Group Leader - Security Support
3. Personnel Monitoring Coordinator
4. Group Leader - Radiological Controls Support
5. Radiological Controls Manpower Support Coordinat
6. Group Leader - Mainte port
7. Maintenance Suppor Q TELEPHONE LOCATI
a. Operations Line
b. Radiological Line

% O I

l l

11.0

-- ~ , - ~ - - , . , . - --,. , e . _ -

\

. - 1004.32 r

.- - Revision 2 ATTACHMENT IV

r- FLOOR PLAN OF AEOF l>

g 7"' .

3 . ,.

(1)...(2)...(3)

'l_

  • Pf m mi

+

Os' ICES 3 gRAJE (high voltage ared

_ c

_ {_; -/ 9!L l

~

to be used for I J

~

Bell Phones

~_ decontamination AM -

Here... *

, l

@ Supply storane...) iIi6iitiI E v

<h  %  !

Phones Here f WAREHOUSE f, ======

a; t h4)...(5)...

b CN R Bell Ph (6)....

Whole Body Counting Here.. ,

r.nd Analysis Support < N qs~ %d I

=

TMI DISCOVERY es r Toi:.sts., .3 ROOM ,

g EMERGENCY EQUIPMENT Bell Thones Here.. .

LOCKERS

= down to garage +

Shower-3 Heads g

- -b c: I

\

i GROUND LEVEL - NTS 12.0 2ND FLOOR OFFICES - NTS

- -- ----,r - .e, , . , - , - - - . . -

m....---+---._,i.---,_-,w_.,,.--.,.%,- -m----.-,--r+-'----=v+--*,.e-=c---+-~w++--we- =----'mi = - * - - -

  • . l

' , - '- 1004.32

    • Revision 2 ATTACHMENT V O, l AE0F SHOWER _ DRAIN SYSTEM SCHEMATIC I  !

. I l ,,

l ,

I i 1 -

i I l SHOWER  !

! l l I I l D O SHOWER DRAI  !

I SEWER DRAIN VALVE #1 l 1 ><  ;

l

! D f NORMALLY OPEN ECON (K DRAIN VALVE #2 g eLLY LOSED l

i_______ _pi,,,,f____

s

.G VEIT U 0

p SEW R LEVEL DECON TANK (1000 gal CAP.) G ' AGE "bbb

\ .C>Q_ TANK PUMP U _

NORMALLY OPEN OUT CONNECTION 13.0

i .

1004.32 Revision 2

.[ 05/02/83

^

IMPORTANT TO SAFETY NON-ENVIRONMENIAL IMPACT RELATED

~ -

THREE MILE ISLAND NUCLEAR STATION 3 UNIT NO.'1 EMERGENCY PLAN IMPLEMENTING PROCEDURE 1004.32

  • ACTIVATION OF THE ANNEX TO THE NEARSITE EMERGENCY

, OPERATIONS FACILITY (CRAWFORD STATION)

Table of Effective Pages M Revision Page Re vision Page Revision Page _kvision 1.0 2 2.0 2 3.0 2 4.0 2 s 5.0 2 6.0 2 7.0 2 8.0 2 9.0 2 Q 10.0 2 11.0 2 12.0 2 13.0 2 i

o v

% 0 V  % 5 3 VSignaturW Date i Signature Date r O

Document ID: 0019W E 3% %,