ML20079S188

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EPIP 1.3 Re Estimation of Source Term & EPIP 1.4 Re Radiological Dose Evaluation.Receipt Form Encl
ML20079S188
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 06/15/1983
From: Fay C, Knorr J
WISCONSIN ELECTRIC POWER CO.
To: Clark R, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20079S183 List:
References
NUDOCS 8307110343
Download: ML20079S188 (3)


Text

.- _ ._ __

Y O Wisconsin Electnc mm coumr 231 W. MICHIGAN, P.O. BOX 2046. MILWAUKEE, WI 53201 June 15, 1983 Mr. H. R. Denton, Director Office of Nuclear Reactor Regulation U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C. 20555 Attention: Mr. R. A. Clark, Chief Operating Reactors Branch 3 Gentlemen:

DOCKET NOS. 50-266 AND 50-301 EMERGENCY PLAN IMPLEMENTING PROCEDURES

  • POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Enclosed are two copies of revisions to the Point Beach Nuclear Plant Emergency Plan Implementing Procedures. These revisions consist of page changes which should be filed in your copies of the procedures in accordance with the attached instructions.

Please return the receipt form for these two copies to:

Wisconsin Electric Power Company Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, Wisconsin 54241 ,

Very truly yours, V

f' i U

\

Vice President-Nuclear Power C. W. Fay Attachments l

Copies to NRC Resident Inspector Incident Response Center, Region III 8307110343 830624 l PDR ADOCK 05000266 F PDR /f e0

. I

t 8 e -

May 27, 1983 h ~ ht /bM" da' d' l POINT BEACH NUCLEAR PLANT

( EMERGENCY PLAN IMPLEMENTING PROCEDUPIS l

The following revised procedures are attached and should be inserted into your manual. Please destroy all revisions removed frcm your manual.

1. EPIP 1.3, " Estimation of Source Term," Revision 15, dated 05/27/83.
2. EPIP 1.4, " Radiological Dose Evaluation," Revision 7, dated 05/27/83.
3. EPIP 2.3, " Unusual Event - Offsite Agency Notification," Revision 3, dated 05/27/83.
4. EPIP 3.3, " Alert - Offsite Agency Notification," Revision 2, dated 05/27/83.
5. EPIP 6.5, " Technical Support Center & Operations Support Center Activation,"

Revision 1, dated 05/27/83.

3. EPIP 7.2.2, " Activation of Chemistry & Health Physics at TSC/OSC,"

Revision 2, dated 05/27/83.

7. EPIP 7.2.4, " Health Physics Communications," Revision 2, dated 05/27/83.
8. EPIP 7.4.1, " Routine Check, Maintenance, Calibration & Inventory Schedule for Health Physics Emergency Plan Equipment," Revision 7, dated 05/27/83.

l

9. EPIP 7.4.2, " Emergency Plan Equipment Routine Check, Maintenance & Calibration Instructions," Revision 5, dated 05/27/83.

The following revised form is attached for insertion into your manual. Please attach the form to the indicated procedure and destroy all revisions removed from your manual.

EPIP-34 (05-83), " Calculation of Xe-133 Equivalent Release Rates," (attach to EPIP 1.8).

Also attached is a revised listing of the Table of Contents to be inserted into your manual. Please destroy the old revision.

Also attached is a revised Table of EPIP Fcrms. Please insert this table into your manual. Please destroy the old revision.

Please fill out the attached receipt form and return it to Ms. F. A. Flentje at the Point Beach Nuclear Plant.

oa60;;;212 O'^1em 1 W nuuun v.<G: M /

P . b J. E. xnorr - tm p emz /

'90R INFOR AATBON DNDI i

t o.

  • hiYb2(C dk d' POINT BEACH NUCLEAR PIANT EMERGENCY PLAN IMPLEMENTING PROCEDURES 05/27/83 I hereby acknowledge receipt of EPIP 1.3, EPIP 1.4, EPIP 2.3, EPIP 3.3, EPIP 6.5, EPIP 7.2.2, EPIP 7.2.4, EPIP 7.4.1 and EPIP 7.4.2 and have inserted th4m into my manual.

4

't

  • DATE 4

6 i

- . . . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _