Forwards Review of Palisades Nuclear Plant Ventilated Storage Cask Thermal Performance Monitoring
ML20079R935
Person / Time
Site: Palisades, 07201007  Entergy icon.png
Issue date: 04/01/1994
From: Stokely J
SCIENCE APPLICATIONS INTERNATIONAL CORP. (FORMERLY
To: Leu K
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML18059A924 List:
References
CON-NRC-02-90-009, CON-NRC-2-90-9, FOIA-94-351 NUDOCS 9404080008
Download: ML20079R935 (2)


Text

n 3a

. r%

. 7c2 -/067 e

$b -a?5~T j menf'$,

Wf

& = mannan-science Appiscatione Intemational corparation An En@yee-Omud Company April 1,1994 L

Mr. K. C. Leu U.S. Nuclear Regulatory Commission Division of Fuel Cycle and Material Safety One White Flint i1555 Rockville Pike Rockville, MD 20852

Subject:

Contract NRC-02 90409, Task Order No. 22, Subtask B

Dear Mr. Leu:

Enclosed please find our subcontractor's report entitled, " Review of Palisades Nuclear Plant Ventilated Storage Cask Thermal Performance Monitoring." This report presents the following: (1) the findings of an inspection performed at Palisades by our subcontractor, Scientech, and NRC staff members, Dr. Hi Bo Wang, Dr. Tony Hsia, and Mr. Mike Parker; (2) the results of a review of Consumer's Power Company (CPC) thermal performance analysis model, and (3) comparison with an alternative thermal performance analysis model set up by Scientech for this subtask.

SAIC has reviewed a draft report submitted by Scientech and has offered suggestions for minor changes in the draft. Scientech has incorporated these suggestions in the fimal report version which SAIC is submitting to the NRC in partial satisfaction of the requirements of NRC Contract-02-90-009, Task Order 22, Subtask B.

The results are positive. The CPC documentation of test procedures, work instructions, instrumentation calibration, and general QA procedures were found to be in good order. Calculations performed by CPC give conservative results. Predictions of outlet air temperature (from calculations).

were greater than the measured values. Finally, and most importantly, the requirements of the Certificate of Compliance (Section 1.2.3) for the VSC 24 regarding thermal performance monitoring of the first cask are satisfied. This provides assurance that the concrete and fuel clad temperature limits will not be exceeded.

Sincerely, ohn R. Stokley, P.E.

cc w/ enclosure:

Dr. Hi Bo Wang cc w/o enclosure:

David Tiktinsky, Project Officer, NMSS Program Support Joanna Lilley, Contracting Officer Malcolm Knapp, Director, PMDA NRC Document Control Branch 11*

Roger Bacon Drive, Reston, Virginia 22090 *(703) 318-4500 cw-pw - w me t-v, t-*,= % o. Sw own,= s-rs r-L94040aooor. 4o3 g

f,,

s.,r nuuut nmnnnown

_. 7

" ??{, :h,i. ~

]

Y?^

'l

(, 2

,r;.. i;f,:,.i e :

?

4

' Mr. K! C. Leu April Ic 1994

. Page 2.'

t i

bec w/ enclosure:

S. Mirsky, S AICl bec w/o enclosure:

. D. Prelewicz, Scientech Si Green, Contracts, SAIC '

'I M. Porter, Subcontracts, SAIC 9

4 i

.f I

1 t

l i

e s

i

.i 9

a o

?

.t t

h t

$