ML20079R259

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1983
ML20079R259
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/31/1983
From: Cowan K, Martin J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8402020141
Download: ML20079R259 (4)


Text

.

DOCKET NO. _50-397 - -

UNIT SHUTDOWNS AND POWER REDUCTIONG UNIT NAME WT4P-2 DATE 1/09/84 COMPLETFD BY K. D. Cowan REPORT MONTII December 1983 TELEPIIONE (5 37 501 METHOD OF

. TYPE SHUTF8NG DOWN F: FORCED DURATION THE REACTOR OR NO. DATE S: SCHEDULED (HOURS) REASON (1) REDUCING POWER (2)- CORRECTIVE ACTIONS / COMMENTS (f40?JE .

l e

-c

]

SUMMARY

8402020141 831231 PDR ADOCK 05000397 R PDR

l AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-397 ,

UNIT WNP-2 DATE 1/09/84 COMPLETED BY K. D. Cowan TELEPHONE (5091377-2501 Ext. 2815 MONTH December 1983 DAY AVERAGE DAILY POWER* LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe Net) 1 - 17 . _ _

2 13 3 19 4

a 0 5

m 0 6

22 O___

7 n 0 3 0 24 9 0 3

10 0 26 11 0 27 12 0 3

13 0 29 14 0 30 15 0 31 16 INSTRUCTIONS On this form, list the awrage daily unit power level in MWe-Net for each day u the reporting month. Compute to the nearest whole messwatt.

, OPERATING DATA REPORT DOCKET NO. 50-397 UNIT UNO-?

DATE 01/09/84 COMPLETED BY K. D. Cowan TELEPHONE (509)377-9501 Ext. 2815 OPER ATING STATUS

1. REPORTING PERIOD: December 1983 . GRoc HOURS IN REPORTING PERIOD: 0
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): I66 MAX. DEPEND. CAPACITY (MWe Net): 1100 DESIGN ELECTRICAL. RATING (MWo. Net): 1 Inn l

l 3. POWER LEVELTO WHICH RESTRICTED (IF ANY) (MWo. Net): 5% Gross MW l 4. REASONS FoR RESTRICTION (IF ANYl: Initial Plant startup and power ascension test phase.

! THis MONTH YR TO DATE CUMULATIVE

5. NUMBER OF HOURS REACTOR WAS CRITICAL ...............

0

8. REACTOR RESERVE SHUTOOWN HOURS . . . . . . . . . . . . . . . . . . .

0

7. HOURS GENER ATOR ON LINE . . . . . . . . . . . . . . . . . . . . . . . . . . 0
8. UNIT RESERVE SHUTDOWN HOURS ......................

0 ,

9. GROSS THERMAL ENERGY GENERATED (MWH) ..............

0 0

10. GROSS ELECTRICAL ENERGY GENERATED IMWH) . . . . . . . . . . . . .
11. NET ELECTRICAL ENER3Y GENERATED (MWH) ..............

0

12. REACTOR SERVICE FACTOR . . . . . . . . . . . . . . . . . . . . . . . . . . .

O t

13. REACTOR AV AILABILITY F ACTOR . . . . . . . . . . . . . . . . . . . . . . . ,
14. UNIT SERVICE FACTOR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0
15. UNIT AVAILABILITY FACTOR . . . . . . . . . . . . . . . . . ........

0

16. UNIT CAPACITY FACTOR tuning MDC) ............ ........

0

17. UNIT CAPACITY FACTOR (Using Design MWel . . . . . . . . . . . . . . . . . 0
18. UNIT PORCED OUTAGE RATE . . . . . . . . . . . . . . . . . . . . . . . . . . O __
19. SHUTDOWNS SCHEDULED OVER NEXT6 MONTHS (TYPE DATE, AND DURATION OF EACHl: 3/29/84 to 4/3/84, l 4/25/84 to 4/27/84, and 5/11/84 to 5/21/84; All for maintenance during power 20.If b b N'OF REPC' r PERIOD. ESTIMATED DATE OF STARTUP: 1/16/M
  • 21. UNITS IN TEST STATUS IPRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITI AL CRITICALITY I/lb/04 INITIAL ELECTRICITY 3/18/84 COMMERCI AL OPERATION 7/01/84
  • WNP-2

1 Washington Public Power Supply System 3000 Gecrge Washington Way P.O. Box 968 Richland, Washington 993524968 (509)372-5000 January 10, 1984 Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Sir:

Subject:

NUCLEAR PROJECT NO. 2 MONTHLY OPERATING REPORT The initial Monthly Operating Report for this facility is submitted in compliance with our Technical Specification requirement.

Following receipt of the Operating License dated December 20, 1983, we began loading nuclear fuel on December 25, 1983. At the end of the month, approximately 21% of the fuel was loaded into the Reactor. We anticipate initial criticality about mid-January.

Res ectfully,

[D. Mar Lin (927M) wNP-2 Plant Manager RLH:de Enclosure cc: Mr. John B. Martin - NRC Mr. AD Toth - hRC TEP1 Ii