i Wisconsin 1Electnc POWER COMPANY 234 w wnon Po so. 2NoAwooe w $3?ot l4w nt2m i

VPNPD-91-390 10 CF4 50.54 NRC-91-131 November. 11, 1991 i

U.

S. Nucicar Regulatory Commission

Document Control Desk' Mail Station P1-137 Washington, D.C.

20555 Gentlemen:

~

- D2CEfJS 50-266 AND 50-301' EECURITY PLAN POINT BEACH NUCLEAR PLANTS, UN J'fS 1 AND 2 Attached are th'e changes made to Revision 5,

" Point Beach Nuclear Plant Security' Plan".

These changee are being submitted for formal review-under 10_CFR 50.54(p).

A summary of the changes is as follows:

Pace Section Chances 4-1.1.8 Added " testing and maintenance, LLEA commitments".

-- 16 1.6.1

-For the-12 gauge pump shotgun, the ammunition was changed from-10 rounds.00 lead shot to 12 roundo.

24-2.1.2.3.5.3 New section added-to plan titled pistribution.

25 - 31 Reformatted The subiect matter of-the enclosure to this letter is SAFEGUARDS L-

-INFORMATION and is considered to be... exempt from disclosure in-l accordance with 1.0 CFR Palt.1 3, 50, 70, and 73.

L o

%e

/

0 g

F pga

-6[M 9111140161 911111 PDR-ADOCK 00000266 Asubsahm ofliinvn.uhlhem Depataw

NRC Documsnt Control Desk Novcmbsr 11, 1991 Pago Two 4

PJlLg.9.

SeetiQB Changga 35 2.2.2.1 Added " windows" to first sentence.

2.2.2.2 AMod Einal_EAtry Control (FEQ1 to the title of section.

38 2.3.1.2.1 Added the sentence, "These auxiliary power systems are all located in vital areas".

39 - 41 Reformatted 43 2.4.1.1.1.d Changed Corporate Office of Security to Jecurity Division Office.

73 3.3.8 New section added to the plan tit 1ed R919At191LA111._MaltLtAntA9_9_91 R9s97JlLE.

113 B-4.1 For the 12 gauge pump, riot shotgun, the basic load ammunition was changed from 10 rounds (00 gauge) per weapon to 12 rounds.

150 C-3.1 Added "and defend the plant against the design basis threat as stated in 10 CFR 73.1" to the first sentence.

FIGURE R:

. Revised LLEA arrival time.

Three titles which were changed throughout the plan are Superintendent - Regulatory & Support Services, Wisconsin Electric Corporate Security Officer (WECSO), and Security Specialist.

The new titles are Manager - Regulatory & Support Services, Manager - Corporate Security (MCS), and Security Specialist (s).

The Table of Contents has been updated to accommodate page number and section changes.

The subiect matter of the RDclosure to___ thin __h+ ter is SAflGHAEDE INFORMATLON and is considered to be exempt ' rom disclgsure in accordance with _10 CFR Par 1S__3a 50, 70, and 73.

NRC Docum;nt Control Dack NovCmb0r 11, 1991 Pcga Thrco t

Also, please note that the date and revision number have been added to 'r

'mres A through U.

Veiy truly yx. 4, u ~

James J.

Zach Vice President Nuclear Power Enclosures Copies to NRC Regional Administration, Region III (2)

NRC Resident Inspector (without enc.)

l l

Thg subiect matter of the enclosure tc this letter is SAFEGUABDS INFORMATION and is considered to be exempt from disclosure in accordance with 10 CFR Parts 3, 50, 70, and 7h