ML20079N593
| ML20079N593 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 02/25/1983 |
| From: | Hall D ILLINOIS POWER CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20079N596 | List: |
| References | |
| U-0599, U-599, NUDOCS 8303040347 | |
| Download: ML20079N593 (1) | |
Text
_
U-0599 IlMnOiS " power CEmpany L34 (23)-83 (02-25) L v-l 500 SOUTH 27TH STREET, P. O. BOX S11. DECATUR, ILLINOIS 62525 1805 Docket No. 50-461 February 25, 1983 l
Mr. Harold R.
Denton, Director l
Of fice of-Nuclear Reactor Regulation U.
S. Nuclear Regulatory Commission Washington, D.C.
20555 l
Dear Mr. Denton:
Subject:
Clintcn Power Station Unit 1 FSAR Amendment No. 23 l
Illinois Power Company hereby files Amendment No. 23, dated l
February, 1983, for the Clinton Final Safety Analysis Report (CPS-l FSAR).
FSAR Amendment No. 23 consista primarily of:
l a) updating of Chapter 17, Quality Assurance, to reflect the h
current organization structure, and to provide editorial and clarification changes; l
f b) plant specific ECCS Performance Evaluation in Subsection 6.3.3 9
for compliance to 10CFR50.46 (this relates to TMI Action Plan ll item II.K.3.31 and CPS SER Confirmatory Issue #22);
9 c) new Subsection 9.3.7, Post Accident Sample System
- d) updating of the code usage information for construction of' structural items in Subsection 3.8.1 and Appendix B; and C
c) some miscellaneous changes for SER issues and updating iriforma-tion.
Three (3) signed originals and eighty-five (85) copies are furnished for amending the FSAR sets provided to NRC per 10CFR50.30.
Respectfully submitted,,
I
'OIS POWER COMPANY P
Hall Vice President GEW/jb
DESIONATED ORIGnTAt Dertine t 3Yp Subscribed and sworn to l
1 before me the 25th day of
'~
~ ~ ~ -
Fcbruary, 1983.
i l
um.~
%M Notary Public M Commisskm Expkes../.g./ 86 8303040347 830225 PDR ADOCK 05000461 f
K PDR
/
y_
m-.m
U-0599 IlliT10is Power Company t34 (23)-83 (02-25) t 500 SOUT" 2'Til STREET, P. O. BOX 511. DECATUR, ILLINOI.; C2b251905 Docket No. 50-461 February 25, 1983 Mr. liarold R.
Denton, Director Office of Nuclear Reactor Regulation U.
S.
Nuclear Regulatory Commission Washington, D.C.
20555 1
Dear Mr. Denton:
Subject:
Clinton Power Station Unit 1 PSAR Tu:iendment No. 23 Illinois Power Company hereby files Amendment No. 23, dated February, 1983, for the Clinton Final Safety Analysis Report (CPS-l FSAR).
FSAR Amendment No. 23 consists primarily of:
a) updating of Chapter 17, Quality Assurance, to reflect the current organization structure, and to provide editorial and clarification changes; b) plant specific ECCS Performance Evaluation in Subsection 6.3.3 for compliance to 10CFR50.46 (this relates to TMI Action Plan item II.K.3.31 and CPS SER Confirmatory Issue #22);
c) new Subsection 9.3.7, Post Accident Sample System; d) updating of the code usage information for construction of structural items in Subsection 3.8.1 and Appendix B; and e) some miscellaneous changes for SER issues and updating informa-tion.
Three (3) signed originals and eighty-five (85) copies are furnished for amending the FSAM sets provided to NRC per 10CFR50.30.
RespecLLu]ly submitted, ILLINOIS POWER COMPANY 9
. Hall Vice President GCW/jb Subscribed and sworn to before me the 25th day of February, 1983.
[__
Eid
_.b t_,4 Notary Public My Commtssion Expkes..J.o.. -/...36
]