ML20079N137

From kanterella
Jump to navigation Jump to search
Summarizes List of Software Changes That Will Be Made to Improve Multiplet Analysis Capability of Automated Analytical Instrument Sys,In Response to Insp Rept Open Items.Schedule of Changes Will Be Submitted by 830615
ML20079N137
Person / Time
Site: Quad Cities  
Issue date: 02/14/1983
From: Rybak B
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
5592N, NUDOCS 8303030504
Download: ML20079N137 (2)


Text

'

Commonwealth Edison

1

) One First Nation;l Pltra. Chicago, Illinois O i - Addr:ss Riply to: Post OfficiBox 767 00

\\

f' Chicago, Illinois 60690 February 14, 1983 Mr. James G. Keppler, Regional Administrator Directorate of Inspection and Enforcement - Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137

Subject:

' Quad Cities Station Units 1 and 2 Inspection Report Nos. 50-254/82-13 and 50-265/82 Open Items NRC Docket b'os. 50-254 and 265' References (a):

C. J. Paperiello letter to Cordell Reed dated October 1, 1982.

(b):

T.

J. Rausch letter to J. G. Keppler dated October 1, 1982.

(c)':

C. J. Paperiello letter to T.

J.

Rausch dated December 6, 1982.

Dear Mr. Keppler:

The referenced letters discussed resolution of an open item concerning multiplet analysis capability of our Automated Analytical Instrumentation System (AAIS) to which we committed to review our software system.

A review of the AAIS Software has been completed and improvements will consist of the following:

1.

The peak search algorithm used in measuring radioactivity will include resolution of multiplet peaks.

2.

_The calucations for error analysis will be included.

3.

The ability to subtract background radiation will be included.

4.

Where applicable, a determination of the lower limit of detectability will be included.

5.

The algorithms for classifying peaks will be modified.

6.

The algorithms for determining detector efficiency will be modified.

$$@32$0EA4$o o

8 a

pg 16

2. oc,

bl J. G. Keppler February 14, 1983 A schedule for completion of the software changes will be provided by June 15, 1983.

Please direct any questions you may have on this matter to

'this office.

Very truly yours, B. Ry Nuclear Licensing Administrator 1m cc:

Region III Inspector - Quad Cities 5592N