Text
_ _ _.
CORSumBIS a"-"-
power Site Mmger Company u w,,,-
M@and Project PO Box 1963. Mdand. W 48640 e (Sin 631-8650
/ PRINCIPAL STAFF VRA hsOPRP January 19, 1984 D/RA DE A/RA 3RMSP
'Q yj PC DRMA M-d3d PA0 SCS #
3GA Mr J J Harrison E
i!!F Fl10 Wg Midland Project Section U S Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND ENERGY CENTER CWO 7020 REMEDIAL SOILS WORK AUTHORIZATION File: 0485.16 UFI: 42*05*22*04 Serial:
CSC-7197 12*32 Several activities listed below have passed the 90 day authorization limit.
In accordance with the Work Authorization Procedure, we are requesting the re-authorization of these activities:
155052032 Finger drift to KC4 155053315 Excavate Pier KC4 155054310 Inatall and load Pier KC4 165052032 Finger drift to KC9 165053315 Excavate Pier KC9 165054310 Install and load Pier KC9 155052055 Access pit at Pier E16.
Excavate, install and Icad Pier E16.
165052055 Access pit at Pier W16. Excavate, install and load Pier W16.
155052075 Drift to Pier E17 from E16. Excavate, install and load Pier E17.
165052075 Drift to Pier W17 from W16. Excavate, install and load Pier W17.
Also, the following two activities will pass the 90 day authorization limit on 1/24/84.
Therefore we are requesting the re-authorization of these activities:
155054045 (Install only) Pier CT12 165054045 (Install only) Pier CT1
$W, "
~
DLQ/AEB/klw