ML20079M135

From kanterella
Jump to navigation Jump to search
Forwards Rev 1 to Procedure 1210-5, Once-Through Steam Generator Tube Leak/Rupture
ML20079M135
Person / Time
Site: Crane 
Issue date: 01/19/1984
From: Hukill H
GENERAL PUBLIC UTILITIES CORP.
To: Stolz J
Office of Nuclear Reactor Regulation
Shared Package
ML20079M137 List:
References
5211-84-2004, NUDOCS 8401270190
Download: ML20079M135 (1)


Text

-

/

GPU Nuclear Corporation Nuclear

eme
r8o o

s Middletown, Pennsylvania 17057 0191 717 944 7621 TELEX 84 2386 Writer's Direct Dial Number:

January 19, 1984 5211-84-2004 Office of Nuclear Reactor Regulations Attn: John F. Stolz, Chief Operating Reactors Branch No. 4 U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

Three Mile Island Nuclear Station, Unit 1 (TMI-1)

Operating License No. DPR-50 Docket No. 50-289 Steam Generator Tube Rupture Procedures For your information, attached is a letter to Thomas Gerusky which forwarded a copy of the TMI-l steam generator tube rupture procedure and associated steam generator isolation considerations.

Sincerely, i

H. D. Hukill Director, TMI-l HDH: CWS:vj f Attachment cc:

Mr. Harley Silver l

g1270190840119 p

ADOCK 05000289 PDR lf80 I GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation f

GPU Nuclear Corporation-N Route 1 S ut Middletown, Pennsylvania 17057-0191 717 944 7621 TELEX 84,2386

[

Writer's Direct Dial Number:

I January 19, 1984 5211-84-2005 Department'of Environmental Resources Attn: Thomas Gerusky, Director Bureau of Radiation Protection Box 2063

.Harrisburg, PA 17120

Dear Sir:

By letter dated November 16, 1983, you requested copies of the TMI-l steam generator tube rupture procedures and guidelines concerning reducing potential public exposure.

The requested procedure is attached. This procedure con-tains the guidelines used by the Emergency Director (ED) and Emergency Support Director (ESD) for reducing public exposure.

Deviation from the TMI-l tube rupture procedure in accordance with section 4.5._1.3.1 of the Emergency Plan would consider the isolation considerations attached to the tube rupture procedure.

Sincerely,

'H.

D. Hukill Director, TMI-l HDH:Ct!S:vj f Attachment l

GPU Nuclear Corporation is a subsidiary of the General Public Utihties Corporation

(_