ML20079L655
| ML20079L655 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 11/29/1983 |
| From: | Fay C WISCONSIN ELECTRIC POWER CO. |
| To: | Harold Denton, John Miller Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20079L618 | List: |
| References | |
| NUDOCS 8401260259 | |
| Download: ML20079L655 (1) | |
Text
.-
n p/s3 J"
l
}3 Waconsin Electnc eracoursur 231 W. MICH!GAN, P.O. B0X 2046, MILWAUKEE, WI 53201 November 29, 1983 Mr. H. R. Denton, Director Office of Nuclear Reactor Regulation U. S. NUCLEAR REGULATORY COMMISSION Washington, D.
C.
20555 Attention:
Mr. J.
R. Miller, Chief Operating Reactors Branch 3 Gentlemen:
"~~
DOCKET NOS. 50-266 AND 50-301 EMERGENCY PLAN MANUAL / EMERGENCY PLAN IMPLEMENTING PROCEDURES FOINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Enclosed are three copies each of revisions to the Point Beach Nuclear Plant Emergency Plan Manual and Emergency Plan
' Implementing Procedures.
These revisions consist of page changes 1
which should be filed in your copies of the subject. documents in accordance with the attached instructions.
Pleas 2 return the recclpt forms for these copies to:
Wisconsin Electric Power Company Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, Wisconsin 54241 i
Very truly yours, V
h(,U
[
Vice President-Nuclear Power C. W. Fay Attachments Copies to NRC Resident Inspector l
Incident Response Center, Region III l
l l
Ef401260259 840119 ~
PDR ADOCK 05000266 l
F PDR l
'l