g Northern States Power Cornpuny 414 Ngoliet Mall Minnoawlis, M:nnesota $5401 1927 Telephone (612) 330 6500 October 29, 1991 10 CFR Part 50 Section 50.63 (c)(4)
U S Nuclear Regulatory Commission Attn:
Document Control Desk Washington, DC 20555 FRAIRIE ISTAND UUCLEAR GENERATING P! ANT Docket Nos. 50-202 License Nos. DPR-42 50-306 DPR-60 Schedule for Required Hardware and Associated Pracedure G mDges to Implement the R(sulnnnt s of _ t.he sBo Rule Re f e re nc e r. : (1)
Letter from Thomas M Parker, Northern States Power Company, to U S Nuclear Regulatory Commission dated November 27, 1990 titled: " Design Heport for the Station Blackout / Electrical Safeguards Upgrade Project' (2)
Letter from Arnando Masciantonio, Nuclear Reactor Re gul a t i or., to T H Parker, Northern States Power Company, dated March 6, 1991 titled: " Station Blackout Rule-Implementation Schedule (TAC Nos,d68588 and 68589)"
On November 27, 1990, we submitted our Design Report for the Station Blackout / Electrical Safeguards Upgrade Project.
This report contained a detailed schedula of activities necessary to complete the project, including activities directly related to satisfying NSP's commitment to comply with the Station Blackout Rule, 10 CFR Fart 50, Section 50.63, for Prairic Irland.
On March 6. 1991, we received the referenced Station Blackout Supplemental Safety Evaluation from the NRC.
'ihis safety evaluation documented NRC's acceptance of the schedule provided by Reference 1 and at the same time recognized that, "Due to the size and complexity of this project, therc is considerable possibility for schedule delays to occur."
In a recent reassessment of project progress, it became apparent that we will not be able to meet a schedule that would allow us to install and test the necessary hardware prior to startup of cycle 15 for Prairie Island Unit 2 (scheduled for early 1992).
In this reassessment, we have determined a schedule that vill allow us to complete construction, testing and necessary implementing procedures for all Station Blackout related activities by December 1992.
It is our plan to conduct a two-unit outage beginning in O
h 9111070011 91102G' PDR ADOCK 05000282 k'
p PDR
.r 3
"* "" Y US t4RC October 29, 1991 Page 2 of 2 October 1992 and ending with return to operr.tlon of Unit 1 in tiovember 199?
and Unit 2 in early December 1942.
St at ioti lilackout activities would be complete upon startup of Unit 2 in December 1992.
liased on progress to date, we are confident that this schedule c<m be achlesed.
In the near future, we will provide a revision t o the Design Report (Reference 1) which will include a revised schedule of activities leading up to the cortpletion of St at ion Blackout related activities in Deceniber 1992.
Should you have an; entions concerning this change in our project schedule, please contact us.
,r
/
/
/.
}hAA ho'na s 1 trker Managet
!Nelear Support Services c: Regional Administrator - Region 111, NRC Senior Resident inspector, liRC liRR Project Manager, tiRC J E Silberg