Monthly Operating Repts for Sept 1991 for Peach Bottom Atomic Station,Units 2 & 3
ML20079J167
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 09/30/1991
From: Baron M, Miller D
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CCN-91-14165, NUDOCS 9110150281
Download: ML20079J167 (14)


Text

_ _ _

CCN # 9114165

/ ?p~

y-I'lii1.ADEl.I'liI A 1:11(TRIC COMl'ANY 20 j, "

l'1 Aril 16011041 AU 5Mit l'OWI11 NI AlION 4

H D 1,a%,. '*

%gihpA'j Ik itJ. lYrinq lotua 1314 re.um monuw-tees roe e a os e u sia e v a Fl')4 4 'un6 D. B. Miller, Jr.

Yke heudeM October 10, 1991 Docket Nos. 50 277 50-278 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 SUlijECT:

Peach llottom Atomic Power t 'aih*r Sbuthly Operating Report Gentlemen:

Enclosed are twelve copies of the men' ly operating report for Feach 110ttom Units 2 and 3 for the month of September i991 forwarded pursuant to Technical Specification 6.9.1.d under the guidance of Regulatory Gui<? * '.l. Revision 4.

Sincerely,

[

A

&\\v I

DilM/AAF/T N DRM/MJiteme f

Enclosure ec:

R.A. Ilurricelli, Public Service Electric & Gas T.M. Gerusky, Commonwealth of Pennsylvania J.J. Lyash, USNRC Senior Resident inspector R.I. McLean, State of Manjiand T.T. Martin, Administrator, Region I USNRC li.C. Schwemm. Atlantic Electric J. Urban, Delmarva Power INPO Records Center CO?hl.NRC

[ yld I h 911.01502G1 910930 PDR ADOCK 05000?77 lI R

PDR v

NRC Monthly Operations Summary Peach Itottom Atomic Power Station September 1991 iffnT.l Power levels remained.,a s nioJ W/ ed'.A Septemt>cr 7 when gewer was reduced to repair the 2 'A' Recire MG set and to clean and p4.up4 r I r to 'A'watertex. Reductions in gewer were made at various tirnes throughout the following week to support watu.. t cleaning. Once the watertex work was completed, power levels were maintained at norninal 100% for the te ' of Septemler.

UNIT 3 Unit 3 began Septemter in fuel coastdown, at approximately 93% power, with preparations for the refuel outage in progress. ESW flow balancing activities were performed during the week of September H. The unit was shut down early on September 14 for its eighth icfuel outage.

COMI.NRC

1 Doclet No. 50-277.

j Attachment to Monthly Operating Report for September 1991

. UNIT 2 REFUELING INFORM ATION 1.

Name of facility:

Peach Bottom Unit 2 2.

Scheduled date for next re!ueling shutdowti:

Reload 9 scheduled for September 5,1992.

3.

Scheduled date for restart following refueling:

Restart following refueling forecast for November 20,1992.

4.

Will ref.ieling or resumption of operation therefore require a technical specification change or other license amendment?

No.

If answer la yes, what, in general, will these lx?

5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

N/A 6.

Important licensing considerations associated with refueling. e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

N/A i

CC09917wRC

Docket No. 50 277 Attachtnent to Monthly Operating Report for September 1991 Page 2 UNIT 2 REFUELING INFORMATION (Continued) 7.

The number of fuel assemblics (a) in the core and (b) in the spent fuel storage pool:

(a)

Core - 764 Fuel Assemblies (b)

Fac! Poci.1896 Fuel Assemblics,58 Fuel Rods 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblics.

9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

September 2003 without full core offload capability.

September 1997 with full core offload capability.

CQf61.h RC

AVERAGE DA!LY Uhli POWER LEVEL DOCKET NO. 50 277 UNIT PEACH BOTTON UWii 2 DATE DCfD8ER 15, 1991 COMPANY PHILADELPHIA ELECTRIC COMPANY M. J. BARON SUPERV!$0R REPORis GROUP PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456 7014 Ext. 3321 feUNTH $EPTEMBER 1991 DAY AVERACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (NWE NET)

(MWE NET) 1 1029 17 1D45 2

1032 18 1D47 3

1028 19 1D44 4

1032 20 1D49 5

1032 21

'1D47 6

1024 22 1051 7

1040 23 1053 8

817 24 1D49 9

1028 25 1052 10 987 26 1050 11 9 '5 27 1053 12 931 28 1055 13 1032 29 1054 14 1D46 30 1057 15 1D42 16 1D42 l

I i

., - - -. _. - -... ~., - - -

.-.. -. -..-~

l P

4 OPERATING DATA REPORT DOCKET NO. 50 277 DATE OCTOGER 15, 1991 COMPLETED ST PhlLADELPNIA ELECTRIC COMPANY N. J. BARON SUPERVISOR REPORTS GROUP PEACM Boff 0M A10MIC POWER STAfl0N TELEPHONE (717) 456 7014 EXI. 3321 i

OPERAi!NG ST ATVt -

1. L*lT WAME3 PEl BOTTOM UNIT 2 NOTES:
2. REPORilNG PERIOD SEPTEM8ER, 1991
3. LICENSED THERMAL POWER (MWT):

3293

4. NAMEPLATE RAtlWG (Gross MWE):

1152

5. DEllGW ELECTRICAL RATlWG (NET MWE):

1065

6. MAXIMUM DEPENDABLE CAPACITY (GROS $ MWE): 098
7. MAxlMUM DEPENDABLE CAPACITY (NET MWE):

1055

8. IF CHANGES DCCUR IN CAPACITY RATINGS (ifEMS NUMBER 3 THROUGH 7) SlWCE LAST REPORT, GIVE REASONSt

- 9. POWER LEVEL TO WHICN RESTRICTED,1F ANY (NET MWE):

10. REASONS FOR RESTRICT 10NS, if ANY:

TNIS MONTN YR 10 DATE CUMULATivt

11. MOURS IN REPORTING PER100

'720 6,551 151,127

_ 12. NUMBER OF HOURS REACf0R WAS CRITICAL 720.0 3,708.2 90,408.9

13. REACTOR RESERVE $NUTDOWN HOURS 0.0 0.0 0.0
14. ROURS GENERATOR ON LINE 720.0 3,511.6 87,D96.7
15. UNIT RESERVE SWUTDOWN Hauts 0.0 0.0 0.0
16. GROSS THEdMAL ENERGY GENERATED (MWM) 2,324.328 10,573,320 256,990,353
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 767,300 3,430,800 B4,439,090
18. NET ELECTRICAL EN[RGY GENERATED (MWH) 738,348 3,276,349 80,830,995

-PAGE 1 CF 2 l.

l l

OPERAi!WG DATA REPORT (CCNilKUED)

DOCKET No. 50 - 277 DATE OC106ER 15,1991 THIS MONTN TR TO DATE CLMJLA1!VE

19. UNIT SERVICE FACTOR 100.0 53.6 57.6
20. UNIT AVAILABILITY FACTOR 100.0

$3.6 57.6

)

21. UNIT CAPAtlTY FACTOR (UslWG MDC WET) 97.2 47.4

$0.7

22. UNIT CAPACITT FACTOR (U$lkG DER WET) 96.3 47.0 50.2
23. UNIT FORCED DU1 AGE RATE 0.0 16.4 14.5
24. SHU1 DOWNS $CHEDULED DVTR NEXT 6 MONTHS (TTPE, DATE, AND DURAtlON OF EACM):

)

Mid-Cycle maintenance outese, beginning 01/25/92, 21 days

25. IF $NUTDOWN AT EMD OF REPORT PERIOD, E511 MATED DATE OF STARTUPt N/A
26. UNITS IN TEST STATUS (PRIDP. TO COMMERCI AL OPERATION):

FORECAST ACHIEVED INITIAL CRITitALITT 09/16/73 Ihl11AL ELECTRICITT 02/18/74 COMMERCIAL DPERAllDN 07/05/74 PAGE 2 OF 2

.v.._-

- -. -. ~ _ - - _,. -..

I l

4 1

UNIT SHUTDOWNS AND POWER REDUCT10NT DOCKET WD. 50 2TT UNIT NAME PEACH BOTTOM UNIT 2 DATE OCfostR 15, 1991 REPORT MONTH SEPTEM6ER, 1991 COMPLETED BY PHILAD2LPHIA ELECTRIC COMPANY M. J. BARON i

SUFERVISOR REPORTS GROUP i

PEACH BOTTOM ATOMIC POWER STAfl0N TELEPHONE (717) 456 7014 EXT. ; t2T j

METHOD OF LICENSEE ST$ FEM COMPONENT CAUSE AND CORRECTIVE TTPE DURATION REASON SHUTTING DOWN EVENT CCCE CODE ACTION TO NO.

. DATE (1)

(HOURS)

(2)

REACTOR (3)

REPORT f (4)

(5)

PREVENT RECURRENCE 16 910908 8

0.0 9

4 N/A CB MOTORX REBRU$N 2A MG $ET REACTOR WAS NOT $ HUT DOWW 1?

910910 8

0.0 8

4 N/A HC HTEXCH WATERBOX CLEANING REACTOR WAS NOT SHUT DOWN 18 910911 5

0.0 8

4 N/A HC HTEXCH WATERBOX CLEANING REACTOR WAS NOT $ HUT DOWN r

(1)

(2)

(3)

(4)

F FORCED REASON METHOD EXHIBIT C INSTRUCTIONS S

  • SCHEDULED A - EQUIPMENT FAILURE (EXPL AIN).

1

  • MANUAL FOR PREPARATION OF DATA B
  • MAINTENANCE OR TEST 2 - MANUAL SCRAM.

ENTRY $HEETS FOR LICENSEE C REFUELING 3 + AUTOMATIC SCRAM.

EVENT REPORT (LER)-

i D REGULATORY RESTRICTION 4

  • OTHER (EXPLAIN)

FILE (NUREC 0161)

E

  • OPERATOR TRAINING + LICENSE EXAMINAfl0N F
  • AMINISikAT!vE (5)

G OPERATIONAL ERROR (EXPLAIN)

N OTHER(EXPLAIN)

EXHIBlf I

  • SAME SOURCE i

i

..sm--9

,yy 3 y

n,,

w y g -r

<---,-7.-t-----

or----w.

-w,.r+y-,-.,r,,,-c..--..-

e-,.,.--c--+,.-=.--,,-e-wa-mw e- - - -

am--,w,=e--.w*=w=-e-c.--=%w=-----,av--**-------+.

- * - = - - *

-s-1 3

AVFRAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 278 UNIT PEACH E01TDM UNIT 3 DATE OCTO6ER 15, 1991 COMPANY PHILADELPHI A ELECTRIC COMPANT M. J. BARON SUPE RVISOR REPORi$ GROUP PEACM B0170M ATOMIC POWER STATION TELEPHONE (717) 456 7014 EXT. 3321 MONTH $EPTEMBER 1991 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVIL (MWE NET)

(MdE+ NET) 1 937 17 0

2 936 10 0

3 932 19 0

4 932 20 0

5 927 21 O

6 916 22 0

7 932 23 0

8 912 24 0

9 903 75 0

10 907 26 0

11 894 27 0

12 906 28 0

13 771 29 1

14 0

30 0

15 0

16 0

I l

Docket No. 30 278 Attachment to Monthly Operating Report for September 1991 UNIT 3 REFUELING INFORM ATION 1.

Name of facility:

Peach Bottom Unit 3 2.

Scheduled dam for next refueling shutdown:

Relori 8 in progress 3.

Scheduk. e for restart following refueling Restart following refueling scheduled for December 7,1991 4.

Will refueling or resumption of operation thereafter require e technical specification change or other license amendment?

See item 6.

If answer is yes, what, in general, will these tw?

See item 6.

5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

N/A 6.

Important licensing considerations auociated with refueling, e.g., new or different fuel design or supplier, unreviewed dcsign or performance analysis methods, significant changes in fuel design,

- operating procchres:

Technical specification amendment on reactor vessel pressure temperature limits prior to startup for cycle 9 was approved 6/27/91. (Technical Specification Change Request 90-17; W/)LNRC

l-Docket No. 50-278 Attachment to Monthly Operating Report for September 1991 Page 2 UNIT 3 REFUELING INFORMATION (Continn@

7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pmh (a)

Core - 764 Fuel Assemblies (b)

Fuel Pool - 1689 Fuel Assemblies,6 Fuel Rods 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel asemblics.

9.

The projected date of the last refuel: g that can be discharged to the spent fuel pool assuming the present capacity:

September 2004 without full core nf' load capability.

September 1998 with full core offload capability.

CCD71t.NRC

, ~ ~ -. -

n

=.. -, --- _.

~. -. -..

I OPERATING DATA REPORT DOCKET No. 50 278 DATE OC108ER 15, 1991 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY M. J. BARON' SUPERVISOR REPORTS GROUP PEACM BOTTOM ATOMIC PWER STATION TELEPHONE (717) 456 7014 EXT 3321 OPERATING STATUS

- 1. UNIT NAME: PEACH BOTTOM UNIT 3 l NOTES:

2.-REPORTING PERIOD: SEPTEMBER, 1991

3. LICENSED THERMAL POWER (NWT):

3293 in 8th Refuel Outage

4. NAMEPLATE RATIhG (GROSS MWE):

1152

5. DESIGN ELEC'."fCAL RATINJ (NET MWE):

1065

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE).1098
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):

1035

8. IF CHANGES OCCUR IN CAPACITT RATINGS (ITEMS NUMG?R 3 THROUGH 7) $1NCE LAST REPORT, GIVE REASONS -
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):

- 10. REASONS FOR RESTRICTIONS, IF ANY:

THIS MONTH YR-TO DATE CUMULATIVE 11.' HOURS IN REPORTING PERIOD 720 6,551 147,023

12. NUMBER OF HOURS REACTOR WAS CRITICAL 324.5-5,359.2 90,362.1 13 REACTOR RESERV!. SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON LINE 312.9

--5,214.4 87,305.0

.5. UNIT RESERVE SHUTDOWN HOURS 0.0-0/

0.0

16. GROSS THERMAL ENERGY GENERATED (MWH) 930,576 16,241,L ?

166 'S3,930

.17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 296,900 5,327,000 04,002,532

' 18. NET ELECTPICAL ENERGY GENERATED (HWH) 279,777 5,118,916 80,495,588 PAGE 1 Of 2

...e w.

r m.,,~.e

,-n.v.

,,n,,

en.

,,n.~-,..,--,-.,,,,-.,,,n

~.,. - _,,.,,., - - -,, - - - - = -.,

OPERATING DATA REPORT (CONTINUED)

DOCKET Wo. 50 - 278 DATE OCTOBER 45, 1991 THi$ MONTH YR 10-DATE CUHULATIVE

19. UNIT SERVICE FACTOR 43.5 79.6 59.4
20. UNIT AVAILABILITY FACTOR 43.5 79.6 59.4
21. UNIT CAPACITT FACTOR (USING MDC NET) 37.5 75.5 52.9
22. UNIT CAPACITT FACTOR (U$ING DER NET) 36.5 73.4 51.4
23. UNIT FORCED OUTAGE RATE 0.0 15.1 12.7
24. $HUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE. AND DURATION OF EACH)
25. IF $HUTDOWN AT END OF REPORT PERICD, ESTIMATED DATE OF STARTUP:

Decentor 8,1991

26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERAtl0N)1 FORECAST ACHIEVED INITIAL CRITICALITY 08/07/74 INITIAL ELECTRICITY 09/01/74 COMMERCIAL OPERATION 12/23/74 PAGE 2 of 2

,.. _ ~

=

r UNIT SHUTDOAS AND POWER NEDUCTIONS DOCKET NO. 50 - 278 UNIT NAME PEACH BOTTOM UNIT 3 DATE OCTOBER 15, 1991 REPORT MONTH SEPTEMBER,1991 COMPLETED BT PHILADELPHIA ELECTRIC COMPANT M. J. BARON SUPERVISOR-REPORTS GROUP PEACH BOT 10M ATOMIC POWER STATION TELEPHONE (717) 456 7014 EXT. 3321 l.

METH00 0F

~ LICENSEE STSTEM COMPONENT CAUSE AND CORRECTIVE NO.

- DATE_

TYPE DURATION REASON SHUTTING DOWN EVENT.

CODE CCCE ACTION TO (1)

(NOURS)

(2)

REACTOR (3)

REPORT f (4)

(5).

PREVENT RECURRENCE 1

1

.16 910913 S

407.1-C-

1 N/A 22 222222 PLANNED REFUELING DUTAGE y

407.1 (1)-

(2)

(3)

(4)

- F,* FDRCED REASON-METHOD

'EXH18f ? G

  • INSTRUCTIONS S SCHEDULED

-A EQUIPMENT FAILURE (EXPLAIN) 1

  • MANUAL FOR PREPARATIDW OF DATA B
  • MAINTENANCE OR TEST 2 MANUAL SCRAM.

ENTRY SHEETS FOR LICENScE C - REFUELING 3 AUTOMATIC SCRAM.

EVENT REPORT (LER)

D + REGULATORY RESTR!CTION 4

  • OTHER (EXPLAIN)

FILE (WUREG 0161)

E

  • OPERATOR TRAINING + LICENSE EXAMINAT10N F - ADMINISTRATIVE (5)

G.

OPERATIONAL ERROR (EXPLAIN)

N. OTHER(EXPLAIN).

EXHIBIT I - SAME SOURCE

- l i

.~>

~

n -,

r-n,.

.,..,.. -. ~,, - - - -

w