Responds to NRC Re Violations Noted in IE Insp Repts 50-272/83-33 & 50-311/83-33.Corrective Actions:Ler 83-048/03L Filed on 831104.Shift Supervisor Counseled Re Submitting safety-related Equipment Failure Repts
ML20079H495
Person / Time
Site: Salem  
Issue date: 12/28/1983
From: Liden E
Public Service Enterprise Group
To: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20079H481 List:
References
NUDOCS 8401230461
Download: ML20079H495 (2)


Text

_

O PSEG

' Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038 Nuclear Department December 28, 1983 U.

S.

Nuclear Regulatory Commission - Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406 Attention:

Mr. Richard W.

Starostecki, Director Division of Project and Resident Programs Gentlemen:

NRC COMBINED INSPECTION 83-33 AND 83-33 SALEM GENERATING STATION NO. 1 AND 2 UNITS DOCKET NOS. 50-272 AND 50-311 The. subject inspection conducted on October 5 to November 9, 1983, identified a violation regarding failure to submit a Licensee Event Report.

PSE&G's response to the violation is provided below.

ITEM OF VIOLATION.

~

Technical Specification 6.9.1.9.b requires a thirty day written licensee event report of conditions leading to operation in a degraded mode permitted by a limiting condition for operation (LCO).

Contrary to the above:

No written licensee event report was submitted within thirty days for operation with one of'two centrifugal charging pumps, required to be operable by LCO 3.5.2, inoperable as permitted by Action Statement 3.5.2.a from August 15-18, 1983.

. REPLY TO ITEM OF VIOLATION:

.The failure to submit an Incident Report was due to an oversight on the part of the Shif t Supervisor and is considered an isolated incident.

f$$1230461e4ogg7 J

ADOCK 05000272 G

PDR The Energy Peopk!

95-2168180Mi 11 -82

7. - ;

- 7 4

1U. S.-Nuclear Regulatory Commission 12/28/83 A.

Corrective Steps Taken.and'Results' Achieved Incident Report-83-190 was written and subsequently LER 83-048/03L'was filed'on November 4, 1983.

B.

Corrective Steps Taken To Avoid Further Violations:

The Shift Supervisor involved was counseled concerning the requirements-of submitting Incident Reports on safety-related equipment failures.

C.

Date When Full Compliance Will Be Achieved:

We are now'in full compliance.

Sincerely, E.

A.

Liden Manager - Nuclear Licensing and Regulation cc:

Mr. Donald C.

Fischer Licensing Project Manager Mr. James Linville Senior Resident Inspector

,