STONE & WEBSTER MICHIGAN, INC.
P.O. Box 2325, BOSTON. M ASSACHUSETTS O2107 [pRifCIPAL STAFF hA fa.e-ypp 1/f<A
- g h/HA w.is p I<.E_J. rRA
, +3 ry-37'l 20 sos /
e
/
{O._3E g--
ML u
Fiio i_j Mr. J. G. Keppler, Administrator, Region III January 11, 1983 Nuclear Regulatory Commission J.0. No. 14509 799 Roosevelt Road NRC File #84-1-11 Glen Ellyn, Illinois 60137 DOCKET NO. 50-329/330 CIO WEEKLY REPORT NO. 30 MIDLAND PLANT - UNITS 1 AND 2 The Construction Implementation Overview (CIO) Weekly Report No. 30 for the period January 3, 1984 through January 6, 1984, is enclosed.
This report includes a summary of CIO activities for the week and open Items, NIRs, and Hold Points.
' [-_ _ _ _ _
S. W. Baranow Program Manager Enclosures SWB/fs cc:
f JJHarrison, US NRC Glen Ellyn, IL RJCook, US NRC Midland (site)
DLQuamme, CPCo Midland (site)
RAWells, CPCo Midland.(site)
RBKelly, SWEC RGBurns, SWEC APAmoruso, SWEC 3 E6]
01$$a$kOUo 2
JAN 191984
Report No. 30 January 3 1984 through January 6, 1984 3
Personnel on Site Stone & Webster Michigan, Inc.
P. Amouruso N. Wetherell A. Smith F. Bearham K. Butler J. Chawla J. Barr D. MacBay R. Carpeggiani D. Cocke~
R. Scallan E. Barcomb C. Marrs J. Thompson D. Beauchamp T. Parker R. Butler D. Brown R. Corson D. Wells T. Baumgartner B. Kasson W. Sienkiewicz F. Seely W. Dick J. Ridge G. Carter J..Karr CIO ACTIVITIES A.
Summary
- 1) Verification of the FCR/FCN Resolution Program Phase III (Register Reconciliation) for the architectural discipline.
- 2) Verification of the FCR/FCN Resolution Program Phase III for the civil discipline.
- 3) CIO evaluation of the retired document verification program for the civil discipline.
4)
Issued CIO Item 043 on document control.
- 5) Meetings attendert are summarized in Attachment A.
i B.
Details (Paragraphs below correspond to items above) i
- 1) The Phase III Register / Documents Verification Program for architectual documents (all stations) was initiated.
In the course of this effort, it was noted that there were variations in the use of symbols for re-l tired documents. NIR-011 was issued to document the above.
MPQAD was notified and CIO was requested to discontinue the architectural verifi-cation effort.
- 2) CIO was notified that the documents representing the first Civil disci-pline design package (Stations 8, 10, 13, 24 and 64) were available
~for Phase III verification. A sample plan was prepared for this pack-age and CIO verification was completed.
In performing the verification, CIO identified various discrepancies. These were documented on NIR-012.
1 l
L
s-JOB NO. 14509 MIDLAND NUCLEAR POWER PLANT
. WEEKLY REPORT NO. 30.
.PAGE 2 3)
In conjunction with item 2, above,CIO also evaluated, on a sample
basis, the implementation of the retired document program described lin FID 2.100 at Stations 8, 10,.13, 24 and 64. Discrepancies were-4 identified in the use of the retired document symbol to alert dccu-ment users that infomation has been removed from a document and placed in a file and that this infomation must be reviewed and used
'in conjunction with the principal document. These discrepancies were.also documented on NIR-012.
- 4) As a result of the activities described in 1, 2 and 3 above, CIO Item Number 043 was. issued. This item identifies several general concerns relative to Phase III document control and requests CPCo plans for resolution. Upon receipt CIO will first evaluate the plans _ and then detemine what further verification / evaluation measures will.be' constituted by CIO.
.OPEN ITEMS, NONCONFORMANCES AND HOLD POINTS Open CIO Items are summarized in Attachment B.
Items 041, 042 and 043 were initiated during the reporting period.
.Open-CIO Nonconfomance Identification Reports (NIRs) are summarized in
+
Attachment C.
NIRs 011 and 012 were initiated during this reporting 3
. period.
Open CIO Hold Points are summarized in Attachment D.
GENERAL i
Mr. K. Butler and Mr. G. Carter were assigned to the CIO staff during
~
~~
this period. Signed affidavits and resumes of the two members will be sent to Mr. J. J. Harrison, US NRC, Glen Ellyn, Illinois.
CIO Item 038 was incorrectly listed as " Tracked Action" in We'ekly Reports 26 through 29. The item is correctly listed as " Tracked Infomation" herein.
1 l
i f
____--------------------------___---_----------------7--------
f1FETlHG IISI DATE MEETIllG TITLE ATTENDEES DISCUSSI0fl Col 3 TENT CIO C0t11ENTS Jan. 3 Team Meetings CDCo Status of schedule restraints No areas of concern through BPCo identified.
Jan. 6, S&W CIO 1984 Jan. 3 QVP/ Status CPCo Status of actions to resolve Stop Work Orders No areas of concern 1984 Assessment BPCo identified.
Meeting MPQAD S&W CIO Jan. 4 Team Super-CPCo Status of schedule restraints at team level.
No areas of concern 1984 vision BPCo identified.
Meeting MPQAD S&W CIO 4
E' E
- 1 4
ATTACHMENT A l
STONE & WE85TER HIClllGAN, INC.
MIDLAND NUCLEAR COGENERATION PLANT CIOIlEMS ITEM CLASSIF1-ORIGINATING CPCo RESPONSE STATUS CLOSE-0UT NO.
CATION ITEMS DOCUMENT /DATE DOCilMENT/DATE OPEN/Cl.0 SED CDCllMENT/DATE 030 Tracked NeedtoreviewkendorEquipment Report No. 5 Open Action Verification Program - NPQAD/SMO I 7/18/83 032 Tracked NIR 006 issued on October 27, l'83, Report No. 20 Open 9
Action to address administrative discrepan-10/31/83 cies in the Construction Training Records of Teams 5, 6, 8, 9, 12, 13, 16, 17, 19, 20, 25, 26 (27/28) 29, 30, 31, 32/33 and DN0 staff.
033 Tracked NIR 007 issued on November 7,1983, Report No. 21 Open Action to address administratlye discrepan-11/08/83 cles in the Construction Training Records for Teams No. 24, Field Pro-curement, Subcontractor Management, Field Engineering Staf f, and Con-struction General Services Organi-za tion.
E 034 fracked NIR 008 issued on November 14, 1983 Report No. 22 Open
[h m
Tction to address upgrading five training 11/14/83 level codes in the System Team m
Training Matrix.
8 g
,5 O
- L Page 1 ATTACllMfNT 15
STONE & WEDSTER MICll!GAN, INC.
MIDLAND flVCLEAR COGENERATION PLANT CIO ITEUS ITEM CLASSIFI-ORIGINATillG CPCo RESPONSE STATUS CLOSE-00T NO.
CATION ITEMS DOCUMENT /DATE DOCUMENT /DATE OPEN/ CLOSED DOCUMENT /DATE s
035 Tracked CIO observed that dielectric iso-Report No. 22 Open Action lation spacers for galvanic pro-11/14/83 tection of copper pipe to galvanized steel pipe supports were missing in some areas on the Small Bore (Instru-ment Air) KAC System, drawing FSK-J-30-0220 Sheet 2 Rev.7.
036 Tracked At a meeting of Teams 26 and 27 Report No. 24 Open Infor-held on November 22, 1983, the dis-11/29/83 mation continuance of FCNs for "Q" items was discussed.
If this change is to be implemented, new instructions are required.
l 037 Tracked CIO observed that two boards with Report No. 24 Open Action protruding nails lying in Cable Tray 11/29/83 1AKA019 (Q Tray) had punctured the As revised by cable jacket of a "Q" cable. The Report No. 25 cable is Q-channel A, 480V, MCC.
12/5/83
,e NCR C00925 was issued by MPQAD on g
November 22, 1983. CIO will track c
this item to assure that corrective x
action (repair) has been performed NP to approved procedures.
lj
.E E$
J Page 2 AITACINENI B
STONE & WEBSTER MICillGAN, INC.
MIDLAND NUCLEAR C0 GENERATION PLANT CIO ITEMS ITEM CLASSIFI-ORIGINATING CPCo RESPONSE STATUS CLOSE-00T NO.
CATION ITEMS DOCUMENT /DATE DOCUMENT /DATE OPEN/ CLOSED DOCUMENT /DATE 038 Tracted CIO reviewed a checklist developed Report No. 26 Open Infor-by Bechtel Field Engineers for use 12/13/83 mation
, in conducting Status Assessment to Procedures FPN-7.000, Rev.1. Check-list did not include all of the attributes required by the procedure.
041 Tracked CIO requires CPCo plans and schedules Item Notifi-Open
'Infor-for assuring that current activities cation Sheet mation relative to the evaluation of Phase 1/6/84 III activities on FCRs/FCNs, vendor drawings and FSKs are completed. prior to releasing the emergency diesel generators for resumption of instal-lation work. Subsequent to review, CIO will determine method of evalu-ation.
042 Tracked Reference correspondence refers to Item Notifi-Open Infor-the formalization of procedures for cation Sheet mation training CPCo personnel (SMO) who 1/6/84 will be performing tasks relative to the CCP. CIO requests these pro-cedures for review and-evaluation.
N%q ii?
8 3
.E E!
Page 3 ATTACllMENT B
.s STONE & WEBSTER MICllIGAN, INC.
MIDLAND NUCLEAR C0 GENERATION PLANT CIO ITEMS ITEM CLASSIFI-ORIGINATING CPCo RESPONSE STATUS CLOSE-0UT NO.
CATION ITEMS DOCUMENT /DATE DOCUMENT /DATE OPEN/CLUSED DOCUMENT /DATE 043 Tracked CIO Phase III evaluation of archi-Item Noti-Open Action tectural/ civil document control fication Sheet measures resulted in findings listed 1/6/84 in the Item Notification (similar conditions are identified in MPQAD MQAR-DAT-1). CIO requests CPCo's plan for addressing the problems noted and for implementing and verifying corrective action on both MQAR-DAT-1 and this item.
E%
G" 2
13 EF 8
l Page 4 ATTACHMENT B E-
STONE & WEBSTER MICilIGAN, INC.
NONCONFORMANCE IDENTIFICATION REPORT (NIR)
SUMMARY
NIR HPQAD DATE
' DATE DATE NO.
NCR NO.
SUBJECT OF DISP.
CLOSED REMARKS QAR NO.
ISSUE MPOAD 006 Administrative. discrepancies in Con-10/28/83 struction Training Records involving CCP Teams.
007 Administrative discrepancies in Con-11/7/83 struction Training Records for the following teams: No. 24, Field Procure-ment, Subcontractor Management, Field Engineering Staff, and Construction General Services Organization.
008 Need to upgrade five training level 11/14/83 codes in the System Team Training Matrix.
I 011 A conflict on the use of R symbols for
-12/31/83 retired FCR/FCNs on architectural drawings.
N 012 Numerous drawing / specification descripan-1/3/84
{f cies revealed during Phase III, FCR/FCN CIO review at Drawing Stations 8,10 5?
and 13.
8 o
e i
ATTACilMENT C
r----_______--_-_-.--______
STONE & WEDS 1ER lilClllGAll, IflC.
Il0LD P0lill SlJittARY NO.
SilBJEC.T ORIGINAllllG CPCo RESP 0flSE STATilS C10SE.nus DOC /ilAIE DOC /DAIE OPFil/ CLOSED DOC /DA :
005 CPCo has committed to develop a Vendor Jquipment,4 Report No. 18 Open Verification Program.
Program is required 10'/17/83 before implementation of Phase II.
l.
\\
007 Evaluation of Management Review 'of results of Report No. 19 Open Phase I activities.
Evaluation is required 10/24/83 before implementation of Phase II f%
2 E
E 3
Page 1 AITACilMEllT D
..f E
^
$ TONE & WEBSTER MICllIGAN, INC.
- . i
!!01.D POINT
SUMMARY
g.
l-NO*
SUBJECT
'0RIGINATING CPCo. RESPONSE STATUS CLOSE-OllT DOC /DATE DOC /DATE
-OPEN/Cl.0 SED DOC /DATE 008 NIR.006 was issued on Octob'er 27, 1983, to Report No. 20 Open address discrepancies obserbed during the 10/31/83 sample inspection of 2,054 Construction Training
~
records of 31 members-of Teams 5, 6, 8, 9, 12, 4
~
"13,16,17,19,20,25,26,(27/28),29,30,31, (32/33) and B110 staff.
Corrective action must be completed before any S
~
walkdown assessments can be perfonned by the j'
personnel in question.
l 4
i 009 NIR 007 was issued on November 7,1983, to
~ Report No. 21 Opgn ~
address discrepancies observed ouring sample 11/7/83 4
4 inspection of 834 Construction Training records
~
~
of 18 members of Team 24, Field Procurement, Sub-Contractor Management, F. E. staff and c
Construction General Services Organization.,
5 Corrective action must be completed before any i
walkdown, assessments can be performed by the
^
~
personnel in question.
~
- o 8
A l
g,
.i i
a t
j Page 2 ATTACllMFilT D
-l STONE & WEBSTER MICHIGAN, INC.
[
HOLD POINT
SUMMARY
ORIGINATING CPCo RESPONSE STATUS CLOSE-0UT N0.
SUBJECT DOC /DATE DOC /DATE OPEN/ CLOSED DOC /DATE 010 NIR 008 has been issued on November 14, 1983 Report No. 22 Open to address upgrading five items in the System 11/14/83 Team Training Matrix of the Construction Training Program.
Corrective action must be completed before any walkdown assessments can be performed by the personnel involved in these training activities.
i
\\
011 Prior to lifting of Stop Work Orders relating Report No. 23 Open to the FCR/FCN Review and Reso:.ution Program, '.
11/21/83 CIO has established a Hold Point at the conclusion of Phase II activities to evaluate g
the adequacy of MPQAD performance during Phase'I and Phase II activities. The Hold Point g
encompasses all the Stop Work Orders with the e
exception of Stop Work Order No. FSW-36 which 5
has been lifted by MPQAD. This Hold Point does l
not apply to Phase III.
{
O3 5
1 Page 3 ATTACHMENT D 1