ML20079G592

From kanterella
Jump to navigation Jump to search
Advises That Util Request to Delay Submittal of Tech Spec Change Request (Tscr) Until 911231 Due to Tscr Being Incomplete Granted,Per 910926 Telcon,In Ref to 910730 Commitment to Submit Tscr on ESW Sys by 910930
ML20079G592
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 09/30/1991
From: Beck G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9110090182
Download: ML20079G592 (1)


Text

...

q L

PillLADEll' Illa ELECTRIC COMI'ANY j

NUCLEAR GROUP llEADQUARTERS 955 65 CilESTERiiROOK llLVD, WAYNE, PA 19087 5691 (215) 640R00 NLiCl31AR LNGINL'JRINO & $l RVICl3 DLPARTMI:NT September 30, 1991 Docket Nos. 50-277 50-278 License Nos. DPR-44 DPR-56 U.S. Nuclear Regulat.ory Commission Attn Document Control Desk Washington, DC 20555

SUBJECT:

Peach Bot. tom Atomic Power Stat.lon, Uni t.s 2 and 3 Emargency Service Water (ESW) Technical Specification Change Request (TSCR)

REFERENCE:

Letter, G.

J.

Beck to USNRC, dated July 30, 1991

Dear Sir:

In the ref erence lett.er, Philadelphia Electric Company

<>ECo) committed to submit a Technical Specificat.lon Chango lequest (TSCR) on the Emergency Service Wat.or (ESW) system by September 30, 1991.

This TSCR will propose new out-of-service timer iar the ESW pumps and the Emergen :y Cooling Water (ECW) pump justified by upgrades to the ECW sys: item and it.s support.

systems.

During the review process, it. was det.ormined that. the proposed TSCR was incomplete.

The TSCR is expected to be completed by the end of the year and PEco has requested opproval to delay submittal until December 31, 1991 This request was granted in a September 26, 1991 telephone conversation between J.

Shea, Project Manager for PBAPS (USNRC) and G. J. Siefert (PECo).

If you have any question, please feel free to cont.act me.

Very truly yours,

,a ?

,s

/

'llllyflr if Qi Q

)

J.

Beck, Kanager F DFk ibh b b S77

,1 censing Secuon f

P PDR cc:

T. T. Ma r t. i n, Administ. rat.or, Region I, USNRC I

J. J. Lyash, USNRC Senior Resident inspector, PBAPS ppp 4 J.

Shea, Project Manager l 0 l

_