ML20079G592
| ML20079G592 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 09/30/1991 |
| From: | Beck G PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9110090182 | |
| Download: ML20079G592 (1) | |
Text
...
q L
PillLADEll' Illa ELECTRIC COMI'ANY j
NUCLEAR GROUP llEADQUARTERS 955 65 CilESTERiiROOK llLVD, WAYNE, PA 19087 5691 (215) 640R00 NLiCl31AR LNGINL'JRINO & $l RVICl3 DLPARTMI:NT September 30, 1991 Docket Nos. 50-277 50-278 License Nos. DPR-44 DPR-56 U.S. Nuclear Regulat.ory Commission Attn Document Control Desk Washington, DC 20555
SUBJECT:
Peach Bot. tom Atomic Power Stat.lon, Uni t.s 2 and 3 Emargency Service Water (ESW) Technical Specification Change Request (TSCR)
REFERENCE:
Letter, G.
J.
Beck to USNRC, dated July 30, 1991
Dear Sir:
In the ref erence lett.er, Philadelphia Electric Company
<>ECo) committed to submit a Technical Specificat.lon Chango lequest (TSCR) on the Emergency Service Wat.or (ESW) system by September 30, 1991.
This TSCR will propose new out-of-service timer iar the ESW pumps and the Emergen :y Cooling Water (ECW) pump justified by upgrades to the ECW sys: item and it.s support.
systems.
During the review process, it. was det.ormined that. the proposed TSCR was incomplete.
The TSCR is expected to be completed by the end of the year and PEco has requested opproval to delay submittal until December 31, 1991 This request was granted in a September 26, 1991 telephone conversation between J.
Shea, Project Manager for PBAPS (USNRC) and G. J. Siefert (PECo).
If you have any question, please feel free to cont.act me.
Very truly yours,
,a ?
,s
/
'llllyflr if Qi Q
)
J.
Beck, Kanager F DFk ibh b b S77
,1 censing Secuon f
P PDR cc:
T. T. Ma r t. i n, Administ. rat.or, Region I, USNRC I
J. J. Lyash, USNRC Senior Resident inspector, PBAPS ppp 4 J.
Shea, Project Manager l 0 l
_