Amends 39 & 29 to Licenses NPF-2 & NPF-8,respectively, Requiring Audit of Emergency Preparedness Program at Least Once Per 12 Months (Per Generic Ltr 82-17)
ML20079G175
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 01/06/1984
From: Varga S
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20079G178 List:
References
GK-82-17, TAC-49068, TAC-49069, NUDOCS 8401190451
Download: ML20079G175 (8)


Text

.

  1. p a" "'%9'%

UNITED STATES

[%'

3 NUCLEAR REGULATORY COMMISSION

~, %:$l !!:

G ASHINGTON. D. C. 205SS f

=.

~.....-

ALABAMA POWER COMPANY DOCKET NO. 50-348

~

i JOSEPH M. FARLEY flVCLEAR PLANT, UNIT N0. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 39 License No. NPF-2 1.

The Nuclear Regulatory Comission (the Commissicn) has found that:

A.

The application for amendment by Alabama Power Company (the licensee) dated October 25, 1982, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, as amended, the provisions of the Act, and the regulations of the Commission; C.

There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

l 2.

Accordingly, the license is amended by changes to the Technical i

Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-2 is hereby amended to read as follows:

e401190451 840106 PDR ADOCK 05000348 p

PM

,y-.

9

i (2)

Technical Specifications i

t i

The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 39, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of its date of issuance.

i FOR THE NUCLEAR REGULATORY COMilISSION

/I.

(_f, Operating ReactorMranch #1 Division of Licensing

Attachment:

I Changes to the Technical

]

Specifications Date of Issuance: January 6, 1984 i

't 4

O f

l

. ~

ATTACHMENT TO LICENSE Af1ENDf:ENT N0. 39 AfiENDf4ENT NO. 39 FACILITY OPERATING LICEfiSE N0. NPF-2 DOCKET NO. 50-348 Revised Appendix A as follows:

Femove Insert E-11 6-11 e

S S

h

A_0MINISTRATIVE CONTROLS g.

Reports and meetings ainates of the PO!!C.

h.

Propcsed changes to Technical Specifications or this operating License.

1.

The safety evaluations for proposed 1) procedures 2) changes to procedures, equipment or systems and 3) test or experiments cc:mleted under the provision of Section 50.59 10 CFR, to verify that such actions did not constituta an unreviewed safety question.

AUDITS 6.5.2.8 The following audits shall be conducted under the direction of APCO's Manager - Safety Audit and Engineering Review:

a.

The conformance of facility operation to provisions contained within the Technical Specifications and applicable license conditions at least onca per 12 months.

b.

The perfomance, training and qualifications of the entire facility staff at least once per 12 months.

c.

The results nf actions taken to correct deficiencies occurring in facility equipment, structures, systems or method of operation that affect nuclear safety at least ont.e per 6 months.

d.

The perfomance of activities required by the Operational Quality Assuranca Program to meet the crit.2ria of Appendix "B",10 CFR 50, at least onca per 24 months.

e.

The Facility Emergency Program at least once per 12 months.

f.

The Facility Security Plan at least once per 12 months.

g.

Any other area of facility operation ennsidered appropriate by the NORS or the Senior Vica President.

h.

The Facility Fire Protection Program and implementing procacures at least once per 24 months.

i.

An independent fire protection and loss prevention program instection and audit of.the unit at 1.aast once per 12 months utilizing eitner qualified offsite licensee personnel or an outside fire protection firm.

j.

An inspectirn and audit of the unit fire protection and loss prevention program by a qualifisc outside fire consultant at least once per 36 months.

k.

The radiological effluent and envinnmental monitoring programs and the results thereof at least once per 12 months.

FARLEV-UNIT 1 6-11 AMENDMENT NO.

39

~.

e arcq

/g b.,

UNITED STATES 84

.- g j NUCLEAR REGU.LATORY COMMISSION

  • 7 %. j&l(#:tj j i:

WASHINGTON D. C,20555

=g L....."

ALABAMA POWER COMPANY DOCKET N0. 50-364 JOSEPH M. FARLEY HUCLEAR PLANT, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE.

Amendnent No. 29 License No. NPF-8 1.

The Nuclear Regulatory Commission (the Commission) has fcund that:

A.

The appl.ication for amendment by' Alabama Power Company (the licensee) dated October 25, 1982, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; 8.

The facility will operate in conformity with the application, as amended, the provisions of the Act, and the regulatio is of the Commission; C.

There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; l

D.

The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and l

E.

The issuance of this amendment is in accordance with 10 CFR Part 51 l

of the Commission's regulations and all applicable requirements have Deen satisfied.

l l

2.

Accordingly, the license is amended by changes to the Technical l

Specifications as indicated in the attachment to this license amendment, l

and paragraph E.C.(2) of Facility Operating Li:ense No. NPF-8 is hereby amended to read as follows:

I l

t

i (2)

Technical Specificaticns The Technical Specifications contained in Appendices A and B, as revised through Amendment No.29, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as.of its date of issuance.

FOR THE NUCLEAR REGULATORY C0l' MISSION

( N'

[_

\\

coul ricven M.

t le Operating Reactor Branch #1 Division of Licensing

Attachment:

Changes to the Technical Specifications Date of Issuance: January 6, 1984 l

i i

l.

l i

l

\\

i.

- - ~... -. -..,

ATTACHMENT TO LICENSE Af1ENDMENT N0.29 Al1ENDMENT !!0.29 FACILITY OPERATING LICENSE NO. NPF-8 i

DOCKET N0. 50-364 Revised Appendix A as follows:

Remove Insert 6-11 6-11 1

S f

i 4

i 2

9

ADMINISTRATIVE CONTROLS g.

Reports and meetings minutas of the PORC.

h.

Proposed changes to Technical Specifications or this Operating License.

i.

The s:fety evaluations for proposed 1) procedures 2) changes to procedures, equipment or systems and 3) test or experiments completed under the provision of Section 50.59 10 CFR, to verify that sucn actions did not constitute an unreviewed safety question.

AUDITS G. 5. 2. 8 The following audits shall be conducted under the direction of APCO's Manager - Safety Audit and Engineering Review:

a.

The conformance of facility operation to provisions contained within the Technical Specifications and applicable license conditions at least once per 12 months.

b.

The performance, training and qualifications of.the entire facility staff at least once per 12 months.

The results of actions taken to correct deficiencies occurring in c.

facility equipment, structures,, systems or method of operation that affect nuclear. safety at least once per 6 months.

d.

The performance of activities required by the Operational Quality Assurance Program to meet the criteria of Appendix "B",10 CFR 50, at least once per 24 months.

I e.

The Facility Emergency Program at least once per 12 months.

g l

f.

The Facility Security Plan at least once per 12 months.

g.

Any other area of facility operation considered appropriate by the NORB or the Senior Vice President.

. The Facility Fire Protection Program and implementing procedures at h.

least once per 24 months, i.

An independent fire protection and loss prevention program inspection and audit of the unit at least once per 12 months utilizing either qualified offsite licensee personnel or an outside fire protection firm.

j.

An inspection and audit of the unit fire protection and loss prever tion program by a qualified outside fire consultant at least once per 36 months.

k.

The radiological effluent and environmental monitoring programs and the results thereof at least once per 12 months.

FARLEY-UNIT 2 6-11 Amendment No. 29