__
s m
Consumers Power James W Cook C0mpBRy v,<. ~,u,n, - ~juro#u+,
and Construction General offices: 1945 West Parnali Road, Jackson, MI 49201 + (517) 78&O453 June 1, 1982 i
Harold R Denton, Director Office of Nuclear Reactor Regulation Division of Licensing US Nuclear Regulatory Commission Washington, DC 20555 MIDLAND PROJECT MIDLAND DOCKET NO 50-329, 50-330 SCHEDULE FOR RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION ON S0ILS REMEDIAL ACTIVITIES FILE: 0485.16 SERIAL: 17293
REFERENCE:
NRC LETTER DATED 5/25/82 TO J W C00f FROM D G EISENHUT Your referenced letter requests a response to Enclosure 8 within seven days, noting when technical responses will be completed for each of the questions. lists several specific requests for " additional information required to complete staff review of soils remedial work."
A response to each of the requests in Enclosure 8 will be submitted by June 15, 1982. For those questions that require dnta based on future construction, the June 15' response will include a general discussion of the subject and an anticipated date for completing the response once the underpinning is complete.
\\
JWC/WJC/acr
/
Boo /
8206080226 820601 5
PDR ADOCK 05000329 A
PDR lj oc0682-0030a168
Serial 17293.
2 L
L CC Atomic Safety and Licensing Appeal Board CBechhoefer, ASLB MMCherry, Esq
-FPCowan, ASLB RJCook, Midland Resident-Inspector RSDecker, ASLB SGadler JHarbour, ASLB GHarstead, Harstead Engineering DSHood, NRC DFJudd, B&W
- JDKane, NRC FJKelley, Esq RBLandsman, NRC Region III WKMarshall JPMatra, Naval Surface Weapons Center W0tto, Army Corps of Engineers WDPaton, Esq SJPoulos, Geotechnical Engineers FRinaldi, NRC HSingh, Army Corps of Engineers BStamiris oc0682-0030a168