Text
,
20HSumBIS power 3,,,,,, o I
C0mpany via n,isa.,- rroiaca s.si aari s
.f.
and Consaruction General offices: 1945 West Pernall Road, Jackson, MI 49201 e (517) 788 0453 June 1, 1982 Mr J G Keppler, Regional Administrator US Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND PROJECT -
DOCKET NOS 50-329 AND 50-330 AUXILIARY FEEDWATER LEVEL CONTROL VALVES POWER SUPPLIES FILE:
0.4.9.59 SERIAL:
17501
Reference:
J V Cook letter to J G Keppler, Serial 16159, Same Subject, dated April 8, 1982 This letter, as was the referenced letter, is an interim 50.55(e) report concerning deficiencies in the assignment of power supplies for the auxiliary 1bedwater level control valves. The FSAR review, to assure that all commitments are met for feeding components or systems from the preferred (battery-backed) power supplies, is not anticipated to be complete until the end of May.
All other information provided in the last interim report remains the sane.
Another report, either interin or final, will be sent on or before July 2,
- 932.
I WRB/baa CC:
Docu:wnt Control Desk, NRC Washington, DC RJCook, NRC Resident Inspector Midland Nuclear Plant 8206080159 820601 PDR ADOCK 05000329 S
PDR jgg 4 1982 gg
,[
r 2
Serial 17501 82-03 #2 CC: