ML20079F176

From kanterella
Jump to navigation Jump to search
Amended Slides & Diagrams Utilized During 831220 Meeting W/Nrc Re Cable Separation Program.W/One Oversize Figure. Aperture Card Is Available in PDR
ML20079F176
Person / Time
Site: Beaver Valley
Issue date: 01/13/1984
From:
DUQUESNE LIGHT CO.
To:
Shared Package
ML20079F175 List:
References
NUDOCS 8401180155
Download: ML20079F176 (35)


Text

l l.,[~

pr.a, l

j Separation Criteria 1

at l

BVPS-2

~

Part I:

Overview and Implementation Program Part H:

Comparison of Criteria

[

Part HI:

' Separation Achievement Concepts a

ms 5I' l

Part N:

Resolution Measures

8 is Part Y

Related Issues i'

i d<

l

}

I O! -3% 841

.2

--g=-

1a d

..e l

"I'l" C

,,e,

.O

'4=8 O

~C C

G O

E i

CO b

Q.

H c5 E

CD l

O g

E m

o CL,

=

=

o E

B e

e ba E

o b-b po

.C E

H

  • C

=_

l An Overview of BVPS-2 Separation i

i

1) Prior to the April-May,1983 meetings with the NRC, BV-2 separation provisions were j

consistent with the PSAR document which l

l in summary described:

l

= separation of redundant safety circuits is by following different routes whenever practical; and by meeting l

specified vertical and horizontal separation distances i

when in the same area

  • Added protection (increased spatial separation or barriers in potential hazard areas)
2) Subsequent to these April May meetings, i

i BV-2 is currently in the process of l

l implementing the separation requirements l

of IEEE Std 384-1974, as augmented by R.G.1.75, Rev. 2

~

I'l l

i I

l Program for implementation of IEEE Standard 384-1974 as Augmented by R.G.1.75, Rev. 2 i

i Beaver Valley Power Station - Unit 2 Duquesne Light Company Pittsburgh, Pennsylvania i.

w u.-

i.

i 1

l, Program Outline i,

I Section Title 1

Objectives 4

l 2

Organization 3

Methods 4

l 4

Implementation 5

Training 6

Control 7

Records 8

Schedule

.v..-

t i

1 i

Section 1 Objectives To implement the separation requirements of IEEE Std i

a l

384-1974 and R.G.1.75, Rev. 2 l.

  • To ensure necessary organizational interactions i

l

  • To maintain internal uniformity with all applicable l

documents l

  • To identify preventative actions that will eliminate the future occurrences of less than acceptable separation distances, where possible, and implement them l
  • To provide an early identification and assemblance of the I

required resources to effect the program

. To minimize the impact of the "lEEE 384" transiflon on construction and system turnover activities

  • To coordinate design modifications with Appendix R and fire stops and seals design features l
  • To maintain current construction schedule 1

l

l l

Section 2 Organization 1

i SWEC DLC l

LIC DLC LIC l

l 8

SWEC & DLC Team. Leaders l

e SWEC DLC BVPS-2.,____j (BVPS-2 Task Force)

Task Force i

i ic i

i SEG SEG

-Proi.

Proj.

Site Proi.

i Struc.

Elec.

Elec.

Struc.

Elec..

Elec. ~1 i

i

_ _ _ _ _ _t_ _ _ _ _, _. _. _. __ _. __ _t e

Constr.

SECO SQC i

Rep.

r-- Constr.

L _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ]i i

l' j 83-35,847A

)

i

4 i

LEGEND i

y, l

DLC Duquesne Light Company lI SWEC Stone & Webster Engineering Corp.

1 l-SECO Sargent Electric Company LIC Licensing Constr Construction i

SEG Site Engineering Group SQC Site Quality Control 84-36,161

Sectisn 3 METHODS

= Classify cases where spatial separation is less than IEEE Std 384-1974 requirements

  • Implement a documentation and tracking system for:
a. Cable Tray Cable Tray
b. Conduit Conduit l
c. Conduit - Trpy l
d. Cables in free space (CIFS)
  • Perform plant walkdowns and document results
  • Group cases of less than minimum spatial separations in types and corresponding design features, consistent with IEEE-384.
  • Group cases of less than minimum separation within panels, switchgear, etc. and specify design modifications
  • Determine test and analyses scope l
  • Evaluate recommendations resulting from a review of work j

practices l

  • Evaluate potantial hazard areas I
a. Fire hazard analysis
b. Flood protection
c. Equipment qualification
d. Pipe whip and jet Impingement l
  • Program feedback i

i i

Section 4 l

l Implementation l

Revise and maintain current,2BVM-41 Electrical Cable and j

Raceway Criteria; and,2BVS-931 The Electrical Installation l

Specification to include:

I

a. Details of separation design provisions. The preferred order of choices l

Is

1) Spallel separation
2) Tray coverstbottoms i

l

3) Enclosed raceway l
4) Barriers j
6) Protective wrapsicoverings
6) Analysis endler tests
b. Modified installstion practices to minimize occurrences of reduced l

separations Revise procedures / drawings to implement the design l

modifications j

Modify wiring diagrams as required for separation within

=

panels l

Review ampacity impacts, if any. Coordinate design changes with review of supports Initiate rework as required Procureifabricate barriers, tray covers, protective materials, wraps, etc.

83-35,049

I i-I Implementation Logic Furnish Design Criteria j

to Structural l

Special RVWExi7]

If Compatible p--

W/ Exist go,,,gg,,;,, g Revise Dwas & l Inter e

l2BVM-41 Eng j

Ident if l Discipline

-Construct RVW l

Exist l Sketch Division 2BVM-41 l RVW Install q:, A Text or Speciell of Dwes RVW I

c c

Not Compatible

^

s..

l RVW IFurnish Per I issue issue R.I.

^

j Effects l DSN 2BVM-41 I Dwas y

l Criteria Rev

~l l

on Cable to l

Environment to Elect DSN Dwgs I Constr I

l.

[RVS 2BVS-931

_ -_g l p _

_-l SQC SEG RVW If "Fix" l

g l

l fo Describe Exist & l NAD's RI's 2BVS-931.' !

RVW Per Barriers A Determine l

l g Establish E Future f "Fix" Per f

SEG l

Criterie Install 2BVS-931 Dispo.sition' l

Not Covered Per or Special l A Revise ~

l on Boston 2BVS-931 l Dwas as RE's g

Required L _ -.

P e ci al j

S

C3 -3 5,Q50 i

d

I' i

Section 5 i

l Training

!i h:

l ;-

  • Determine Training Requirements a) Scope of training l

b) Frequency ll c) Who - SECO i'

SQC l

SWEC, Boston & SEG Design, Construction l'

  • Prepare training packages for instruction (includes work l-practice review results) 1 l
  • Monitor the implementation of training program elements

= Integrate the results of the workshop practices review I.

O es-33,eri

j.

Section 6 Control Systems Components of the System e

a) Tracking Documents

1. Cable Separallon Status Report (Modified CSSR)
2. Request for Information I

b) Drawings c) Project Specific Procedures (includes Site Procedures)

1. Field Construction Procedures (FCP 420,421,430,431,440...)
2. Ir.spection Procedures (IP 8.33, 8.34, 8.41, 0.52...)
3. BVPS.2 Manus.1 Procedures 2BVM.41 e
4. BVPS.2 Specifications f

a 28VS 931, Installation

5. SECO Procedures 4

1 t

I ne

./4/

a 0

Z a

O WW 3

&(

  • Z Z*

O =E

==J w < a.

n. > E s

eso N

>e Z-M s n.

W m u.

o.

ssa O w.ee.

a Q. IY!

3m W d E LM !!!

gg u. O Q 4&p g>$ 4 e

Se=

m_Q t

N th 8

8 8

%nt Som %s3 e

W

)mme n.

O J @

o e

O e-h me me F e en a a

a ew 4

  • E e e

e o. en ea e e

e em E o

awe Z

e=e ew en

==

as as as as an as as as av ae ao se m ao se as an en a

en e.

me se as n e to e e e e e e e 9

e e e e e e e e e e e e e O

e.

.ao.

e e

e e se ao e e en a

e.

a.

4 en e

se se er s.

es e

4 m

vm e.

e se e.

o no m.

se se o o e se me e

en

=. O a"*

e so e.

a.

en y

e e e o

se 6

, e.

.o

.o o

- as ao es 4

ao e.

e o

.a

.en

- e==

o es e

en se as a

.e

.e e

e e

e

.s 3

3 3

1

.e me e,

w e

w n

E e

E E E E O 3

e h

e og e.g

[

e.e.

me ao e

3 e

e w

3

.e I

e an e *

  • a m

a en 3

E w

d 3

w

'i O e e e

  • 3 E

e e

e

.s 9

E e

E 3

3 3

e E

se W

en se es se E

m m

B

.d e.

D E

O s

e e

t 3

3 S

E

.E G

o O

e.

e e

a E

e e,

E E

3 3

m o

se an e

e E

e E

es e e g

g e

E e

e a=

3 E

O e,

g me se um o

g g

me 3

g

- e me o

3 e

E E

ars em so

=

E

.

w a w====

gm O O

O e

p p

a-

.s en a

e w =

e,.

==

o e

s g

e m

D D

9 D

ad se en e

.e a

en e

a ne me E

e m

=

e sr E

e as as w

as

    • P W

9 o e S

a e.

m m

6.

w w e ed E

3 3

3 3

o

- w e

e a

e e

9 of G

G S

to g

as m

m o

N-e 3

3 3

3 t

.,s, 3 e D

O g

e a O

e E E E

w 5

g E e 3

3 es es e

e E

e E

3 e

e e.

e.

e.

e.

e, e

e e

y g

E

.es 3

3 3

e w

w e

p 3

e m

E E

g no.

e en e E e e.

e. -

t g.o

.o

.o.

.o.

,e e o o

.o

.o e

,a

,se o

o t

E e -

a.

,=

.a

.o. e o e

=

I m

e.

en m

e.

a.

m a

me a.

s.

a.

en an so a.

e.

a.

en e.

=

en e.

se e

.o e

en e

U

=

[.-

E E

E E

E

- o en

=

ao me me er ao o e o

o o==

en

- e o

4

. m _

.. e e e

.o e.

e o e E

E E

E E

E E

E E

E E

E E

O O

p a

se a.

O p

p p

p p

ee e

en e e e o e.

E e

E e

E E

e o

s e

e.

e e a e

e e e

a e e e e e e =

e e

e e

en e

a e

e m

a e

s,.

.e e e e a

en e e e e e o

e

.c.

= a e

w w v w

.s W

E D"

a en a

en m

.e

= w I

e a

w w w w w w E

w 3

==

m e e e a

  • 3 3

=

3 3

3 3

3 3

==

3 3

3 3

3 3

3 3

3 3

e.

'e% %

ao ao me ao se as

  1. e ' %

as 5,

e%

e

,, e 5

m a E

E E

E E

E E

E e

e e

s=

u o u o e

. = a u o

.E.

E E

E a

. e e

.E

.e

.E E

o E

e E

e E

E o o o o m

e o o o e e = e =

m m

an e o - o e N

e e

m e o =

e o o e

m em m

an a.

m a

e em m

a e.

a.

e.

en a

o a

en ao p

p em p

g g

w w w a

w I

a a se a

m

.e a

w I e

=-

w

.e

==.

w w

= = = = w

w - =

a as

.s W

w ao g

==w w

.I w

w 6.-

ee w

l

=

5

=

ao

=

ao g

4 m

e e o -

a.

e m

e w o o o o o o 2

2 o - - -

e.

.e o.

= e a

ec = o e a e o e o o E o - -

es o

a.

-e

- o o.

o.

o.

o.

a.

o.

o.

e.

o.

o.

o.

a.

s a o e o o e o e o

=e e

w a.

S.

o o.

o, o.

o.

e.

o.

o.

o.

3 o

.o

- - 3 o a o.

o.

o -

N==

N

%- e o e o o o na D

.o.

.e.

o S e

.o.

o o.

N

  • e

.e

.o, o

o g

M M

O e.

l 4e

~

~

-,r

-c.

- -,, - ~


,..-n,

-. - -, - - - - _ _ - -. - - - - - - -, - - +

(, N. -

Section 7 RECORDS

  • Raceway Tlckets
  • Cable Pull Tickets
  • Engineering & Design Coordination Reports (E&DCR's)
  • Nonconformance and Dispositions (N&D's)
  • Records Management Program
  • Specifications / Purchase Orders e. Qualification Reports
  • Raceway Status Record
  • Electrical Cable Schedule Information System (ECSIS)
  • Cable Separation Status Report
  • Test Reports / Analyses

~~

a i

4 Section 8

~

l Schedule l

Level 1 Netw6rk (Implementation Schedule for R.G.1.75) l Level 2,3 Networks, detalling the following:

t a) The Design Group effort f

' b) The Installation Process c) The evaluation of potential hazard areas, addressing fire, jet j

Impingement, pipe whip, flooding, etc.

',l d) Fire togets for specified barrier configurallons, if required I

l Schedules will be coordinated with Appendix R and fire stop i

l and seals installation activities Note: For Detailed Schedule see Attachment 2

d n

a a

i d

ref lOi t

o n

r y

o eC r

i h

a t

Ht n

i f

o mdn t

oi m

r t

o a

n a

uC r

P o

a S

t s

p a

n ir e

a a

S d

l p

n P

mwA o

e C

N~

A 6

5 0,

5 3

!i;5 !!!4

,!t 3

1 l

i i

i

~

FSAR 1

PSAR IEEE-384-1974 j

Cond - Cond 1' Design 1' Design 1" Min.

1" Min.

l Tray Tray NM M

CSA GPLT C-C 30"V 48" 3'O V 5'0-V I

~

12"H V&H 1'O H 3'0-H j

C - NC Not Addressed i

Tray - Cond Not Addressed i

CIFS to Not Addressed t

TraylCond i

CIFSICIFS Not Addressed i;

NC Non Color C

Color NM Non Missile f

M - Missile

~

CSA. Cable Spreading Area

[

GPLT - General Plant CIFS - Cables in Free Space NOTES TO TABLE

1. Separation status recorded for cable cable separations between 5'0" and O' 4".
2. Vertical tray separation measured from bottom of top tray to bottom of bottom tray (tray depth 5") per PSAR,2BVM 41 and 2BVS 931. IEEE Standard 3841974 measures from bottom of top tray to top of bottom tray.

c

Current Status of BVPS-Unit 2 Relative to IEEE-384-1974, R.G.1.75, Rev. 2 Physical Status: From least to most, the raceway Installations that conform to the spatial requirements of IEEE-384,* 'as presently designed or Installed, by building:

l Areas of Areas of l

Least Compilance Most Compilance

=

I Control Bldg.

Reactor Cont.

Service Bldg.

Safeguards Bldg.

Cable Tunnel Auxillary Bldg.

Diesel Generator Bldg.

Cable VaultlRod Primary intake Structure Control I

l Engineering Software Development Status:

l

1. FSAR amended to Indicate commhment to IEEE-384-1974 f
2. 2BVM-41 and 2BVS-931 revised and issued to conform with FSAR commitments. Both documents will be reissued to include design details to j

l Implement and control the design and construction process.

l

3. Engineering sketches are presently being developed, cr are under review, j

to resolve most of the raceway reduced spatial separation. The sketches incorporate the use of tray covers or steel barriers, and will be incprporated in the documents described in 2, above, after approval.

I i

1 i

  • Most reduced spatial separations involve safety to nonsafety raceways.

l

I Part II Preferred Order of Separation Design

  • e o

1 Spatial Separation 1

5 e

5

'E

' A' _ _ _l e

-5 E

', Divisio n

        • 3-e m

4 2

.',A_'._____

I_

's

_ _T,ivi sio n r..

Jg I, Division r.

=

A IE

        • )

c

.a

.a -

=

2 Covers / Bottoms l

ij

[

=

X...

2 e a oo 1

.T 5E M-l 1

C

'A' Division

2. s 3
a. e

,2 c

7 F" N

o e c

'N1 l

2

.x. z t

.e 'B' Division g

[g i=E

\\

3 1*1

's

=j i

E j

i

+-

2

-+

+

se

=

N 1

8 's s

y%

s t:

2 =.

1 3

3g g.

'F 8

$2 I. 2 s

.x _

X...

2.

,(

, _r_

5 Ii

':=

'A' D...ivision +

  • 9r 2'
  • In 2'

5,~ $

C 5

/

c.

g

'C 5 o=

"I l~

a t

  • a 21

,_a Non-1E

.;t a t. j 8:

1' 3

ai Q

E2 J u 1.

r.

x o min 8 3 35,919A

e -

  • O CQ w.W*8 O

e i

wQ 8_ nOc

~

.h "U.O

=

e ~0 a

w ww o

E

  1. 0 3

0 I

@ b I

=

wG h

lllL th ir a.

O I=

c 5

.g ri n

e

.2

<r a

LJ E

g I

t E

r l, c0

.e 5

E

.E o-E i+-h -+1 l+.-h--

~

a tg

~~

~~

~

E

~

=

O

!L 3 L3 III' II

/

1 I

o

.i j

(

ft 8

  • lr1 fl.
  • lf1 fl.

/w s

e e

e m

E fi m

.2

.2

.2 i

c O

.=

.2 2

m e

.2

.2

.2

,f Q

Q Q

O g

V W

k b

~

\\

b N

4g a.

I

I Part H Preferred Order Of

. Separation Design i

3 Enclosure.s.

- - - - z:

,A,D...ivision u

\\

1" Min. -

O 'A' Division i

Non-lE 1" Min.

4 Barriers,,

6" or Wall gi 6,, or won f-~~~l 'A' Division k

1" Min.

-C 'B' Division or Non-lE l

YP, p*!-Z l

l' Or Ceiling ji nr

'B'_ Division Or Non-lE I,,,-.---

, _ _ - -. - -o, i

,A, D,ivision a

Either Y er Z Must = 1" Min.

3' N

h 6.

90 g r

'A' Division _"~~~~~ lj *s Non-1E Or 'B' Division s

N v

6 3'

'N Yla Z%

Either Y or Z Must = 1" Min..

m

___..... m

.,_a

..m

.m....m m

I E

b P art JI Preferred Order of

~

Separation Design 5 Protective Wraps

'#' Di i iv s on j,, g;,

or N

,l[~1sg rotective Wrap 3' Min lf,,

P

'B' Division " T~~,

'B' Division Conduit

%g I

'A' Division T~

Betwee'n 3' to 1" ll NonIE 0

_ _( _ _

I

~

^

m

~____

I g

Wall 9

9 e rwe 9

-v

, cv = v+

w w y-ww-w,e--,w rv-ww wwwy-_vy-_v.-iv----m-yew-wa-we---*ew er--e-e--,w

---e--

l i

Port ll Examples iv C NonIE D..A iv O

C Non1H 11" Nom.inal t'

C NonIE

  • e--_

,NonIE n

\\\\\\\\\\T \\\\\\\\\\\\\\\\\\

Cable Spreading Area e

l

, D;iv A

_ gl*

- - - - _,,D'..iy. A a

a n

41" Nominal 27" Nominal 41" Nominal v v

Non1E y

C

"" Non 1E

\\\\ \\\\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\

Cable Spreading Area 9

h F

j.-

i l

Work Practice Review Results in Process of implementation 1

i e Extend conduit to minimize the occurrence t

of less than minimum separation distances l

with raceways of the opposite color or with neutral raceways l

l e Specify methods for exiting raceways with l

cable to limit proximity to nearby redundant cable trays or circuits l

f l

e Review present routing practices e

i e

y

_m.

l Preliminary Results of Work Practice Review Graphic-1 2a

[ Div A 2

[ NonIE Troy Separation is not Addressed A

h

[ Div A

' g

]

[ NonIE Tray separation is Not Addressed Recommended Practice m/

I e

.wr,

-m-----,---

,c

Preliminary Results of i

Work Practice Review Graphic-2 W

.3 Div A 3 r

Wall i

Y Troy Separation Div A 3 Y

is Not g

Addressed Non1E]

[

l NonIE3

[

._ -Q T

Wall Div A 3

[

Troy Separation Div A L

^O" is Not g

Addressed Non1E3 5

Non1E3

[

L es-ps,sesa

L!

l

i,
,l i,

lase i

tapy pt s

p d

u I

e o II cr ug T

d d

e R

r na A

fo n P

so i

tpt a er ca np oe Cs 9

6 8,

5 3-3 8

i i

!l!!,1i

,l

!f:l 1!

d t

w a m O e e a

u u e o-a,. D.c a

g g

C u.n C. O

~7 m

a oem C

e m: ecEae e8..g.

8 gT Og cc s

5 ac**2 C

a a

Q 0b Q."U "U '6 '

g g e e c E.c *O 8 a

,Tm aO 833m e

01 6*

5 Nm 0

o m

m

> E o 0 - c.5 0 c

.e

  • E O

C e

e a y =c e.2 2 c

m ee c *O e e

a.O m A eM o

m w-i w

m.E

  • Tc e =.* g 'g D E e

ab

=

V o

e e23 c

3 O

3

=

53 3Iw

- w o

l

~ O an.

am 7

e

)

F r.

g

-ce ggg "c. S e " o g

" gg c "O *,*

b E 4.

EE o'*UC g

g-a GO a*t 0

a

.a

.23m U D3 b

cc

= 'g WvoE'u-E,O, 0-E D

g c: =

o = *.0s=o:go o

U m

M

. o.s. g w

Q s

o ]." a t g c.Eoe='Ee>g e

2:: es e

=

c a

e.

m cmo

  • = g.. -
  • e 6

=

n "g "

g,04 eOg v

l O

Ce Q

gm- *C g Om g8 E

C.

W **

Q O *C W ~O g

w en o m oe ye y

eW

.f e J.2

\\

g Q.$

N V

e g

. Q !ff.g-1T

>- 0. Q.

g o

[

l I

l l

i 1

\\

1 Part IR(Cont.)

l i

Cable Separation Status Report Group Types

\\.

i i

Cables in Free Space (CIFS) i CIFS - CIFS l

1 i

  • CIFS

- Raceway i

1 CIFS Other (sleeves, Junction box, etc.)

1 I

l 83-35,878 i

\\

l i;

l Part M

)

i, Resolutions of cases where less than minimum spatial distances.

occur and specified design modifications t

j Part Dr BVPS-2: Program to Resolve Instances of Reduced Spatial Separations Protective Measures i

i All F.SAR described measures (list of 7 Items) are expected e

to be utill2ed

[

- Steel tray covers and/or bottoms

- Ventilated steel covers (power trays)

L

- Thermal barrier coatings

- Thermalinsulating material

- Steel barriers

- Thermal barriers, ceparating non safety and Class 1E l

cable trays

- Thermal barriers, separating Class 1E from redundant Class 1E cable trays No other protective measures are planned l

i i

{..-

l" l

l l

Part IE Tests and / or Analysis Representative testing, and subsequent l

analysis,.will be used where the previously described methods cannot be applied (i.e.

-l spatial separation, tray covers and/or barriers).

l

(

. L..

Par't M

\\

" Abandoned" Cable We do not abandon cables Generalized topic of redesign of cable or raceway to attain minimum separation requirements

[

a) It is a method or choice to achieve physical separation i

l Features of this method 1.

a) Redesign of cable or raceway will include 1

i redesignation of new status b) Physical routing change will be effected for the existing cable or raceway c) All cable and raceway retain identification d) All cable and raceway remain in the design basis e) Procedures to be developed to address spared cables (terminate, inspect etc.)

i i

s, m

-A 1

~a m

s

,_----,,ma na n

m a-

.a NG3

,y Ub Ub e.e Y

C G

CL ca CC I

9 5

4 4

0,

6 9

-, -. _,,,,,,. ~ - -,....._ -,,

l l

DOCUMENT PAGE

~

~

PU _ LED

~

l l

ANO.pmoiss l

NO. OF PAGES REASON O PAGE ILLEGS2 D wAno copy rn.no A1. PoR cr owa -

3 l

D BE1TER COP (REQUESTED ON -

j C

00 E10 FILM tocoevraD At POR OMR b /d O[ b [

D FEMED ON APERTURE CARO NO i

- - - - - - - _., _ _ _, _ _ _ _ _ _ _ _ _ _