Suppls 831123 Application to Amend Licenses DPR-77 & DPR-79,allowing Completion of post-accident Sampling Mod Per NUREG-0737,Item II.B.3.Expeditious Review of Application Requested to Allow Mod During Feb 1984 Refueling Outage
ML20079E784
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 01/10/1984
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: Adensam E
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, TASK-2.B.3, TASK-TM NUDOCS 8401170423
Download: ML20079E784 (2)


Text

_ _ _ _ - _ _ _ _ -

TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 374ol 400 Chestnut Street Tower II January 10, 1984 Director of Nuclear Reactor Regulation Attention:

Ms. E. Adens im, Chief Licensing Branch No. 4 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Ms. Adensam:

In the= Matter of

)

Docket No.

50 -327 Tennessee Valley Authority

)

50-328 By my November 23, 1983 letter to you, we requested NRC approval of a proposed license amendment for the Sequoyah Nuclear Plant, units 1 and 2.

}

The proposed license amendment would allow completion of the modification associated with Postaccident Sampling (PAS) in order to comply with the

(

operating license conditions, 2.C.(23).F for unit 1 and 2.C.(16).g for unit 2 and the requirements of Item II.B.3 of NUREG-c737. The details of the i

f design and compliance with the design criteria of NUREG-0737 were provided in the November 23, 1983 letter. The justification for approval of the proposed license amendment, along with the significant hazards consideration determination pursuant to 10 CFR 50.92, was provided by my December 21, 1983 letter to you.

As a result of recent conversations with the NRC and our reevaluation of the requirements, we plan to complete installation of the equipment associated with this modification with the exception of supplying power to the containment isolation valves on the sampling lines. However, NRC approval will be required for completion of the modification and for operation of the equipment. Please note that NRC approval must be received in sufficient time to allow completion of the modification, in a timely manner, during the forthcoming refueling outage for unit 1, presently scheduled to begin the first of February 1984. Also, time is needed to perform any needed post-modification tests. We therefore request that you j

continue the review of this item in an expeditious basis.

i 8401170423 7

POR ADOCK 0 PDR p]v(

0 1983-TVA SOTH ANNIVERSARY An EquM Opportunity Employer

.___- - - Director of Nuclear Reactor Regulation January 10, 1984 If you have any questions concerning this matter, pleare get in touch with Jerry Wills at FTS 858-2683 Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, Manager Nucicar Licensing Sworn togday of 01 ndue 1984 subscribed before me this [O -

Notary Public A#

My Commission Expires.

cc:

U.S. Nuclear Regulatory Commission Region II Attn:

Mr. James P. O'Reilly Administrator 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30303 t

i l

l l