Forwards Inservice Insp-Exam Summary:Prairie Island Nuclear Generating Plant,Unit 2,830829-1001. Integrity of Sys Maintained
ML20079E543
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 01/09/1984
From: Musolf D
NORTHERN STATES POWER CO.
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20079E547 List:
References
NUDOCS 8401170353
Download: ML20079E543 (2)


Text

a a.

s W

Northern States Power Company 414 Nicollet Mall Minneapolis. Minnesota 55401 Telephone (612) 330-5500 January 9,1984 Director Office of Nuclear Reactor Regulation U S Nuclear Regulatory Commission Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60 Unit 2 Inservice Inspection Summary Report Attached for your review are four copies of the report, " Inservice Inspection-Examination Summary, Prairie Island Nuclear Generating Plant - Unit 2, August 29, 1983 to October 1, 1983." This is the second inservice inspection conducted for inspection period three.

This report identifies the components examined, the examination methods used, the examination number and summarires the examination results of each of the following areas:

l.

Plant Systems a) Pressure retaining components and supports of the reactor coolant and associated systems classified as ASME Class 1 and ASME Class 2.

b) Augmented examination of main steam and feedwater systems specified in FSAR.

c) Seismic Bolting Program.

2.

Eddy Current Examination of Steam Generator Tubing. Five tubes in No. 21 steam generator and fifteen tubes in No. 22 steam generator were mechanically plugged.

The evaluation of the results from the inservice examinations indicated that the integrity of the systems has been maintained.

hCK050002B2 353 84ojo9 o

PDR

\\bg

\\

/-

r..

NORTHERN CTATEJ POWER COMPANY Dir of NRR January 9, 1984 Page 2 e

This report is being submitted in accordance with the Prairie Island ASME 9 ode'Section XI Inservice and Testing Program. As noted in that program, submittal of the attached summary is intended to satisfy the inspection reporting requirements contained in IWA-6220 of Section XI of the ASME Code.

David Musolf Manager - Nuclear Support Services DMM/ dab Attachment c: Regional Administrator-III, NRC (2 copies of attachment)

- NRR Project Manager, NRC ( l copy of attachmerit)

NRC Resident Inspector (w/o attachment)

G Charnoff (w/o attachment)

H Baron, Chief Boiler Insp., State of MN (1 copy of attachment)

S Tack. Hartford Ins. (1 copy of attachment) a s