_
t?3,hm $1reet WMc Piam NNnota 10(,91 914 Mi 0846
- > NewYorkPower u,,,, o,...
4# Authority l;=gr" Septemboi 27,1991 JPN 91-054 U.S. Nuclear Rogutatory Commission ATTN: Document Control Desk Mall Station F1137 Washington, D.C. 20555
SUBJECT:
James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Revision 4 of the Second Interval IST Program for Pu_mps and Valves Rotorencos:-
1.
NRC Gonoric Lotter 8944 datnd April 3,1989, *Guldanco on Developing Acceptablo inservico Testing Programs.*
l 2.
NRC Memorandum to all Uconsoos, dated October 25,1989, F
- Minutos of the Public Mooting on Generic Lottor 89-04.*
3.
NYPA lottor, C.A. McNolli to the NRC (JAFP 83-0598) dated June 8,1983,'NRC Bullctin No. 83-03 Chock Valvo Failures in Raw Water Systems of Diesel Gonorators.*
4.
NYPA letter, J.C. Brons to NRC (JPN 90-027) dated March 30,1990, " Final Response to NRC Generic Lottor 89-04 Regarding Guidance on Developing Acceptablo inservico Testing Programs.*
DearSir:
NRC Generic Letter 89-04 requires licensees who revise their IST programs to submit those revisions to the NRC (References 1 & 2). Attachment I is Revision 4 of the IST Program, which reflects various olant modifications, changes in Emo,guncy
' Service Water testing and improvements based upon self assessmont. The Authority L
submits the revisod IST Program in accordanco with the requiromonts in NRC Gonoric 1
l Lottor 89-04.
NRC Genoric Lotter 89-04 also requires licensees to submit all open roliof requests for NRC review (References 1&2). Attachment 11 provides the status of all rollof requests that are included in Revision 4 of the IST Program. They aro categorized as opprovod, pro-approved (as defined Reference 1), withdrawn by the Authority, or requiring NRC review. The Authority requests that the NRC review the opon relief 1
9110070183 910927 y
i ADDCKOSOOg{j3 l
DR I
l
1 l
approval of the open relief roquests, in accordance with 10 CFR 50.55a(g), this IST Program will be applicable through July 27,1995 or until rovisod.
Durir g your review, pleaso rioto that the Emergency Servico Water valvo tosting committed to in Refotonco 3, will be tracked as part of the FitzPatilck Surveillanco Testing Program and therefore has boon dolotud from the IST Program.
Curtont plant drawings are boing updated and will be cubmittod at a lator dato.
Those rovisod drawings will not affoct tho IST Program. Pleato use the plant drawings submittod with Rotorenco 4 when reviewing Revision 4 of the IST program, if you have any further questions, pleaso contact Mr. J. A. Gray, Jr.
Vory truly yours, S.+
p/
wa
_ Ralph. Bo lo
[Exoc ivo ico President CNu ar Generation cc:
Regional Administrator U.S. Nuclear Regulatory Commission 475 Allondale Road King of Prussia, PA 19406 Offico of the Resident inspector U.S. Nuclear Rogulatory Commission P.O. Box 13S Lycoming, NY 13093 Mr. Brian C. McCabo Project Ditoctorato 11 Division of Reactor Projects l/II U.S. Nuclear Regulatory Commission Mall Stop 14 B2 Washington, D.C. 20555
..,..