Monthly Operating Rept for Dec 1983
ML20079E249
Person / Time
Site: Farley 
Issue date: 12/31/1983
From: Clayton F, Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8401170197
Download: ML20079E249 (7)


Text

-

1

.i JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE

SUMMARY

OF OPERATIONS DECEMBER, 1983 During the month of December, there was one (1) automatic shutdown which occurred on December 31, 1983.

The following safety-related maintenance was performed in the month of December:

1.

Performed miscellaneous maintenance on diesel generators.

- 2.

Repaired 2A condensate pump.

~3.

Performed scheduled PM on 2C diesel generator.

8401170197 831231 PDR ADDCK 05000364 R

pon

w-OPERATING DATA REPORT DOCKET NO.

50-364 DATE 1-6-84 COMPLETED BY W. G. Hairston, III TELEPHONE (9nn R44-5156 OPFRATING STATUS Notes

1. Unit Name:

Joseph M. Farlev - Unit 2 1)

Ve ta since

2. Reporting Period:

December, 1983 d

2

3. Licensed Thermal Power (MWt):

c mmercial operation.

8

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):

A90

6. Maximum Dependable Capacity (Gross MWe):

854.7 813.7

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A N/A

9. Power Level To Which Restricted,if Any (Net MWe):

N/A

10. Reasons For Restrictions,If Any:

This Month Yr to.Date Ctimulative 744

11. Hours In Reporting Period R 7An 91 9A1
12. Number Of Hours Reactor Was Critical 736.7 7.758.3 18.542.8
13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
14. Hours Generator Or. Line 735.4 7,696.4 16,798.8 0.0 0.0 0.0
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 1;017 961 10 016 n1n 45,337,844 l
17. ' Gross Electrical Energy Generated (MWH) 628.638 6.313.642 14,986,876
18. Net Electrical Energy Generated (MWH) 598.760 5.983.976 14,200,0.26
19. Unit Service Factor 98.8 87.9 86.1 98.8 87.9 86.1
20. Unit Availability Factor
21. Unit Capacity Factor (Using MDC Net)

OR o RA n R9 9

22. Lnit Capacity Factor (Using DER Net) 47 1 R? 4 RO.6 t
23. Unit Forced Outage Rate 1.0 1.9 5.3
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Eacht:

N/A

25. If Shut Down At End Of Report Period. Estimated Dste of Startup:

NiA

26. Units In Test Status tPrior to Commercial Operation):

Forecast Achiesed 5/6/81 5/8/81 1.NiilAL calTICAL TY INITIAL ELECTRICITY 5/24/81 5/25/81 COsiMERCI AL OPERATION 8/1/81 7/30/81 cu n

T DOCKET NO.

50-364

/

- o.

UNIT 2

DATE 1/6/84 W.G. Hairston, III COMPLETED BY TELEPHONE (205) 899-5156 December, 1983

.\\lotml DAY AVERAGE DAILY POWER LEVEL DAY' AVERACE DAILY POWER LEVEL (MWe-Net)

(3tw.get) 824 833 g,

g7 837 2

826 13 791 3

19 838 824 3

g 3 c; 4

817 836 3

21 837 743 6

808 7

23 753 834 g

4 749 9

s-829 10 742 3

gu 834 i

27 12 -

8'28 3

825 832

(

13 830 3

0I 819 l

-14 30 l

836

_15 31 523 i

837 l

16 i

I l

l l

IN57RUCIONS

[

On ettis form:r. list the 2verage daily unti power levelin MWe-Net for esch i:y in the reporting month. Compute to

, the neste:t whole rneg: wast.

(9(77) t

UNIT SilU1 DOWNS AND POWER REDUCTIONS DOCK ET NO. 50-364 UNIT NAME J.M. Farley-Unit 2 DA1E 1/6/83 REPORT MONTil December, 1983 COMPLETED llY W. G. Hairston, III TEl.EPilONE (205) 899-5156, "h

e _.

r.

3 u, =

5

~.

.3 e g

.g 5 X Licensec g -r, g%

Cause & Corrective No.

Date g

3g jg5 Event ts ?

o3 Action to AG gu Pievent Recurrence b

g$ 5 5

35c Report

  • o e

c5 008 831231 F

8.6 H

3 NA NA NA Reactor trip due to low leDel in A steam generator in coincidence with steam flow greater than feed flow.

eL i

2 3

4 F: 1:orced Reason:

hlethod:

Exhibit G Instructions S: Scheduled A Fquipment Failure (Explain) 1 Manual for Preparation of Data ll41aintenance of Test 2 Manual Scram.

Entry Sheets for 1.icensee C-Itefueling 3 Automalic Scram.

Event Repost (1.ER) File INtlRI:G-D-Itegulainey itestriction 4-Other (Explain) 01611 E Operator Training & license Examination i

F Adrninistrasive 5

G Opciational Lisor (Explain)

Esinbis 1 Same Source i

19/77) ll Othes (E xplain) l

J UNIT SilU1 DOWNS AND POWER REDUC 110NS DOCK ET NO.

50-364 UNIT NAhlE J.M. Farley-Unit 2 DATE. 1/6/84 COhlPLETED tlY W.G.Hairston,III(

REPORT A10 Nill Ncevember. 1983 TELEPilONE (205) 899-5156 w.

E E

g

$E 3

j Y}

Licensee

,E-r, D.

Cause & Corrective No.

Date g

3g

,3 g a:

Event g

o.'g Action in yiE 5

j ig g Repor'

  • fu H

in U p,eyen, gee,,,,ng, d

004 831101 F

87.6 A

3 NA IA INSTRU Reactor trip due to failure of universal driver card.

005 831105 S

1.0 B

NA NA NA NA Unit taken off line for performance of the turbine overspeed trip test.

4 4

006 831106 F

13.4 A

3 NA CD INSTRU Reactor trip due to MSIV limit switch failure.

007 831120 F

0 A

4 NA HH MOTORX Power reduction to 76% for repair of condensate pump motor.

f a

a i

2 3

4 F: I orted Reason:

hiethod:

Exlubit G - Instructions S: Scheduled A l'quipment Failure (Explain) 1 -Alanual for Preparation of Data li klaintenance e,i Test 2 klanual Scram.

Entry Sheets for I.icensee C. Refueling 3 Autoinatic Sciam.

Event Report (1.ER) File INURI:G-D-Regulasmy Resisiction 4 Other (Explain) 01611 I:. Operator Training & l.icense Exarninatioa 4

F-Administiatiu 5

G Opciational Leror (Explain)

Exinbit I - Same Source (9/77) ll Olher (E xplain)

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE

SUMMARY

OF OPERATIONS DECEMBER, 1983 During the month of December, there was one (1) automatic shutdown whic?. occurred on December 31, 1983.

The following safety-related maintenance was performed in the month of December:

1.

Performed miscellaneous maintenance on diesel generators.

2.

Repaired 2A condensate pump.

3.

Performed scheduled PM on 2C diesel generator.

.i MeNing Address Alabama Power Company 600 North 18th Street Post Office Bon 2641 Birmingham. Aiabama 35291 Telephone 205 783-6081 F. L Clayton, Jr.

% % " % Q '"'

AlabamaPbwer thesouthem electre: system January 15, 1984 Docket No. 50-364 Director, Office of Management Information and Progran Control U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit 2 Monthly Operating Data Report Attached are two (2) copies of the December,1983 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 2, required by Section

'6.9.1.10 of the Unit 2 Technical Specifications. As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a

" Narrative Summary of Operating Experience" is included in the attached report. Also attached is the revised Unit Shutdowns and Power Reductions page.for the November,1983 Monthly Operating Report which reflects the performance nf the turbine overspeed trip test.

If you have any questions, please advise.

Yours very truly,

. Clayton J r.

FLCJ r/KWM:nac Enclosures xc: Mr. Ted Cintula (1 copy)

Director, IE (10 copies)

Director, RII (1 copy)