Monthly Operating Rept for Dec 1983
ML20079E235
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 12/31/1983
From: Clayton F, Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8401170191
Download: ML20079E235 (6)


Text

'

OPERATING DATA REPORT DOC';ET NO. 50-348 DATE 1/6/84 COMPLETED BY W.G.Hairston, III TELEPHONE f.2.0sT R44-s156 OPERATING STATUS J 8ePh M. Farley - Unit 1 Notes

1. Unit Name:
2. Reporting Period: _ n-mk- 105n 1) Cumulative data since 2 a
3. Licensed Thermal Power (MWt): 96s?

g e om

4. Nameplate Rating (Gross MWe): 860
5. Desaga Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe):

844.6 803.6

7. Maximum Dependable Capacity (Net MWe): .
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

n/A

9. Power Level To Which Restricted,If Any (Net MWe): v/^
10. Reasons For Restrictions,if Any: ,,

N/A This Month Yr..to.Date Cumulative 744 8,760 53,328

!1. Hours In Reporting Period

12. Number Of Hours Reactor Was Critical 744.0 6 97s.7 - 3s.123.2 0.0 36.2 3.650.7
13. Reactor Reserve Shutdown Hours
14. Hours Generator On.Line 744,0 _

6,835.2 34,103.4

15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1,973,088 i7 gii,a77 86,101,526
17. Gross Electrical Energy Generated (MWH) 630,428 si577.426 27,343,010 599,810 5.260.842 25,701,062
18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor 100.0 78.0 64.0
20. Unit Availability Factor 100.0 78.0 64.0
21. Unit Capacity Factor (Using MDC Net) 100.3 74.7 60.0 47 ? 7? 6 50*1
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 0.0 1.3 15.3
24. Shutdowns Scheduled OSer Next 6 Months (Type. Date,and Duration of Eachk Refueling / maintenance outage, 2/10/84. approximately 8 weeks.
25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
26. Units In Test Statur (Piior to Commercial Operation): Forecast Achiesed i.Niii.4 L CRITICALITY 8/6/77 8/9/77 INITIAL. ELECTRICITY 8/20/77 8/18/77 COMMERCIAL OPER ATION 12/1/77 12/1/77 8401170191 831231

{DRADOCK 05000348 PDR (mT7

" DOCXIT NO. 50-348 I

UNIT DATT. 1/6/84 COMPLETED BY W C- hirarnn, III TELEPHONE (205) 899-5156 310NTil nu omsoe, tung DAY AVERAGE DAILY POWER LEVEL ' DAY' AVERAGE DAILY POWER LEVEL (MWe Net) (5tWe-Net) 807 g7 809 1,

an? 13 809 2

796 19 809 3

~

801 20 807 4

799 21 807 5 -

799 806 6 , 22 809 n 806 7

809 810 g 24 809 25-807 9

10 804 26 810 800 811 It 27 802 3 804 12 13 808 29 809 806 809 14 30 809 33 810 IS 16 809 INmUGONS On this formst. list the 2versge d:aly unit power levelin MWe-Net for esch d:y in the reporting month. Compute to

, the neare:t whole messwatt.

(9(77)

J

. ,. ~ .- -. .

1 I! NIT SilU1 DOWNS AND POWER REDUC 110NS DOCKETNO. sn TAR UNIT NAME .T v N1oy mit i DATE 1/6/83 COMPLETED ilY W G- Unirsenn- III REPORT MONTil _ December. 1983 TEl.LPilONE (90s3 Roo_sisA i

F,

- E E

-, Eg };; }E' Licensee Ev, f*'. Cause & Corrective No. Date R 5g 2 s a}: Event p go8 Action to I-yE 5 jj ;f, =

a Repori a _

mU u

o Prevent Recurrence t

b THERE WERE NO I NIT SHUTDOW) S OR SIGNI 7ICANT POWER RF DUCTIONS IN THE MONTH OF DECEMBER.

l 1

I 2 -

3 4 F: forceil Reason: Method: Exhibit G Instsuctions S: Stheduled ATituipment 17ailuie (Explain) 1 Manual for Picparation of Data ll41aintenance oi Test 24f annal Scram. Entry Sheets for I.itensee C Refueling 3. Autoinalic Scram. Event Report (1.ERI file INUREG-D llegulatosy Restrit. lion 4-Other (Explain) 0161) 1 -Ope:atos Tsaining A license Exainination F.Adininistiasive 5 G Opesatioisal Estor (limplain) lislubis I Same Source

('J/77) ll Othes (E xplain)

JOSEPH M. FARLEY NUCLEAR PLANT l' UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS DECEMBER, 1983 During the month of December, there were no unit shutdowns or significant power reductions. On December 25, 1983, the IC steam generator atmospheric relief valve lifted. It is believed that this was caused by freezing in the associated instrumentation. The valve was placed in manual control and closed.

The fallowing safety-related maintenance was performed in the month of December:

1. Performed miscellaneous maintenance on die:el generators.
2. Repacked 1A service water pump.
3. Repacked #10 river water pump.
4. Overhauled #8 river water pump.
5. Performed scheduled PM on 1C diesel generatnr.

l l

1 Meiling Address

% Alabama Power Company 600 North 18th Street Past Offica Box 2641 Birmingham. Alabama 35291 Telephone 205 783-6081 F. L Clayton, Jr.

%%;'*e"J'?f!"' AlabamaPower the southem electnc system January 15, 1984 Docket No. 50-348 Director, Office of Management Infornation and Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the December,1983 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 1, required by Section 6.9.1.10 of the Appendix A Technical Specifications. As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a

" Narrative Summary of Operating Experience" is included in the attached report.

If you have any questions, please advise.

Yours very truly,

. . Clayto , J r.

(

FLCJ r/KWM:nac Enclosures l

l xc: Mr. Ted Cintula (1 copy)

! Director, IE (10 copies)

! Director, RII (1 copy) o

. L

m '

F l JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS DECEMBER, 1983 During the month of December, there were no unit shutdowns or significant power reductions. On December 25, 1983, the IC steam generator atmospheric relief valve lifted. It is believed that this was caused by freezing in the associated instrumentation. The valve was placed in manual control and closed.

The following safety-related maintenance wr3 performed in the month of December:

1. Performed miscellaneous maintenance on diesel generators.
2. Repacked 1A service water pump.
3. Repacked #10 river water pump.
4. Overhauled #8 river water pump.
5. Performed scheduled PM on IC diesel generator.