Application for Amends to Licenses NPF-2 & NPF-8,changing Tech Specs to Allow Use of Reload Fuel Assemblies of VANTAGE-5 Design.Two Repts Withheld
ML20079D601
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 07/15/1991
From: Woodard J
ALABAMA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML19302E789 List:
References
NUDOCS 9107180268
Download: ML20079D601 (4)


Text

_

AlatsN Powet Curt,any 40 invemets Center Pnef Post Ofke box IW5 f Bmungham Akitana M01 16cy,ono 205 M!i%Sti Ra J. D. Woodard Mdf)3fM] POWCI' Wee Plente'il-Ocwar i a w em,eci ""* " " * " "

July 15, 1991 10 CFR 50.90 Docket Nos. 50-348 50-364 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 JOSEPH M. FARLEY NUCLEAR PLANT VANTAGE-5 FUEL DESIGN AMENDMENT Gentlemen:

a order to implement a long-term fuel management strategy for the  !

Joseph M. Farley Nuclear Plant (FNP) Units 1 and 2, Alabama Power Company has decided to use VANTAGE-5 fuel assemblies in future reloads.

In accordance with the provisions of 10 CFR 50.90, Alabama Power Company proposes to amend the Technical Specifications for FNP Unit 1.and L5it 2.

The Technical Specifications for which this change is requested allow the use of reload fuel assemblies of the Westinghouse VANTAGE-5 design.

Currently, FNP Units 1 and 2 utilize the Westinghouse low parasitic (LOPAR) fuel design for core reloads. - The VANTAGE-5 fuel-related technical specification changes are summarized in Attachment 1, and the changes are provided in Attachment 2.

The Westinghouse VANTAGE-5 fuel design provides the operating iharacteristics (by inclusion of specific design features and by use of improved methodologies previously approved by the NRC) required to 4 implement Alabama Power Company's long-term fuel management strategy. The- 4 1

VANTAGE-5 fuel design features include smaller diameter fuel rods, mid-span j' zircaloy grids, the intermediate flow mixer grids, natural uranium oxide l- axial blankets, integral.-fuel burnable absorbers, assemblies modified for extended fuel burnup, and reconstitutable top nozzles. The i

reconstitutable top nozzles and fuel assemblics modified for extended fuel burnup are currently utilized in the LOPAR fuel in both FNP Units 1 and 2. -

In = addition, both the FNP Units 1 and 2 LOPAR fuel assemblies are currently -

operating with the modified debris filter bottom nozzles, which will also be included in the VANTAGE-5 fuel. The new computer code methodologies relative to the current-FNP safety analyses used in the FNP VANTAGE-5 4s safety analyses include NOTRUMP (small-break LOCA) and the improved i I

g gl o

,1oneone 91ons y\

g p nwcx os*ge

U.S. Nuclear Regulatory Commission Page 2 THINC-IV (thermal-hydraulic) computer codes, as well as the Revised Thermal Design Procedure and WRB-1 and WRB-2 DNB correlations. Both the fuel design features and methodologies support the safe, efficient fuel management plan for FNP Units 1 and 2. The ma; gin provided by the VANTAGE-5 fuel design and use of improved methodologies was used to support revised core design parameters that will provide increased design flexibility and meet the Alabama Power Company core design fuel management strategy.

In conjunction with the proposed changes for VANTAGE-5 fuel, Alabama Power Company is requesting additional technical specification changes to support removing and replacing the existing Unit 2 Resistar:e Temperature Detector (RTD) bypass manifold system with fast response RTDs locu ed in the reactor coolant hot leg and cold leg piping. This change has previously been reviewed and approved by the NRC for Unit 1.

Justification for the above changes is included in the Attachments.

Attachment 1 provides a brief description of the proposed changes and the bases for the changes. Attachment 2 provides marked-up and typed Technical Specifications change pages for both Units 1 and 2. Attachment 3 provides the basis for a determination that the proposed changes do not involve significant hazards considerations. Attachment 4 provides a safety assessment which includes details of the safety evaluations / analyses performed to support the transition to a full core of VANTAGE-5 fuel for both FNP Units 1 and 2.

Attachment 4 also includes Appendices A, B, and C which contain the detailed supporting non-LOCA and LOCA analyses / evaluations and radiological assessment performed for the VANTAGE-5 fuel design.

The technical justification for the instrument uncertainties for the Revised Thermal Design Procedure with RTD bypass loops is provided in Attachment 5 as WCAP-12769 (Westinghouse proprietary class 2) and WCAP-12770 (Westinghouse proprietary class 3). The technical justification for the instrument uncertainties for the Revised Thermal Design Procedure with RTD bypass loops eliminated-is provided in Attachment 6 as WCAP-12771 (Westinghouse proprietary class 2) and WCAP-12772 (Westinghouse proprietary class 3). Affected setpoints, allowable values, and limits were determined using the bounding set of operating parameters and instrument uncertainties associated with either RTD bypass loops installed or eliminated.

Also enclosed with Attachments 5 and 6 are Westinghouse authorization letters (CAW-91-162 and CAW-91-163, respectively) and accompanying affidavits, Proprietary Information Notices, and Copyright Notices.

WCAP-12769 and WCAP-12771 contain information proprietary to_ Westinghouse Electric Corporation which is supported by the affidavits signed by Westinghouse,_the owner of the information. Each affidavit sets forth the basis on which the information may be withheld from public disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b)(4) of Section 2.790 of the Commission's regulations.

, Accordingly, it is respectfully requested that the information which is l proprietary to Westinghouse be withheld from public disclosure in

U.S. Nuclear Regulatory Com".ission Page 3 accordance with 10 CFR Section 2.790 of the Commission't regulations.

Correspondence with respect to the copyright or proprietary aspects of the items listed aboJe or the supporting Westinghouse affidavits should reference letter CAW-91-16 nr CAW-91-163 and should be addressed to R. P. DiPiazza, Manager of Actating Plant Licensing Support, Westinghouse Electric Corporation, P. O. dox 355, Pittsburgh, Pennsylvania, 15230-0355.

Alabama Power Company requests a review of this proposed FNP Un ts 1 and 2 licensing amendment by January 31, 1992, to support the first reload of VANl AGE-5 fuel scheduled for March 1992. It is requested that the Unit 2 changes become effective during the Cycle 8/9 outage in the spring of 1992 and the Unit I changes become effective during the Cycle 11/12 outage in the fall of 1992.

Alabama Power Company has determined that the proposed changes do not involve a significant hazards consideration. In accordance with 10 CFR 50.92, a significant hazards consideration evaiuation is provided as Attachment 3.

Alabama Power Company's Plant Operations Review Committee has revieweC the proposed changes, and the Nuclear Operations Review Board will review the changes at a future meeting. A copy of these proposed changes is being sent to Dr. C. E. Fox, the Alabama State Designee, in accordance with q 10 CFR 50.91 (b)(1). j If you have any questions, please advise.

Respectfully submitted, ALABAMA POWER COMPANY  ;

b

. Woodard JDW: RAH /qps Attachments 1,2,3,4,E,6 SWORN TO AND SUBSCR1620 BEFORE ME cc: Mr. S. D. Ebneter THIS /F DAY OF .48a&/1991 Mr. S. T. Hoffman /

Mr. G. F. Maxwell

"// #()

Dr. C. E. Fox [ J/ll 0- Lh6tdf ht;Nf,hu

~

Pub l My Commission Expires: f'/Y-f9

bc: Mr. R. P. Mcdonald Mr. W. G. Hairston, 111 Mr. D, N. Morey Mr. J. E. Garlington Dr. W. M. Andrews Mr. K. W. McCracken Mr. C. D. Nesbitt Mr. J. W. McGowan Mr. O. Batum Mr. W. R. Bayne Commitment Tracking System (2) i  :

E i'