ML20079C947

From kanterella
Jump to navigation Jump to search
Forwards Peach Bottom Atomic Power Station Unit 2 Reactor Containment Bldg Integrated Leak Rate Test Rept
ML20079C947
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 06/20/1991
From: Miller D
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20079C948 List:
References
NUDOCS 9106260375
Download: ML20079C947 (1)


Text

r 6

,,dQCN 91-14094 9

PillLADELPillA ELECTHIC COhll%NY l'r.ACil IKWIIMI A'IUMIC POwl'R S'! ATION R D.I,ihn 208 lelM Delta, lynny lvania 17314 nau surnw-ins esim aa or s uitte w a (?!?) 45(r7014 D.16. MUler, Jr. 1 Vice henident June 20, 1991 Docket Nos. 50 277 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 SUBJEQ Peach Bottom Atomic Power Station Unit 2 Rnctor Containment Building integrated Leak Rate Test Gentlemen:

Attached is the Peach Bottom Atomic Power Station Unit 2 Reactor Containment Building Integrated Leak Rate Test (ILRT) for the ILRT performed in hf arch 1991. This submittal is in accordance

I Sincerely, 1

I HT DBM//AAF/h)JWHRM/MJb:dit Attachment ec: R.A. Burricelli, Public Service Electric & Gas T.M. Gerusky, Commonwealth of Pennsylvania J.J. Lyash, USNRC Senior Resident inspector R.I. McLean, State of Maryland T.T. Martin, Administrator, Region I, USNRC II.C. Schwemm, Atlantic Electric J. Urban, Delmarva Power INPO Records Center 1CC147. doc /

i 0106260375 910620 PDR ADOCK 05000277 g p PDR

. -, , _ . . -