ML20079C129

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for May 1991 for Farley Nuclear Plant Unit 1
ML20079C129
Person / Time
Site: Farley 
Issue date: 05/31/1991
From: Dennis Morey, Woodard J
ALABAMA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9106180444
Download: ML20079C129 (5)


Text

_ _ _ _ _

8) mt ea no,a., cm u,y e in.c o, s ce,q., e,r.,,,,

U;t1 C" t u [t:_ e 1 l t',

htf'I' ti t f, PT, S I, g!,. l 1 d 1$ '.)l T e ;y l v + ' o > !.<, >

r e, m

AN!!Xilllil POWCf Op$. f*$

June 11, 1991 g

e r,r n., F,;.,..

Docket No. 50-348 U. S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D. C.

20555 Joseph M. Farley Nuclear Pltnt Unit 1 Monthlv Operatina Data Report Attached is the May 1991 Monthly Operating Report for Joseph M. Farley Nuclear Plant Unit 1, as required by Section 6.9.1.10 of the Technical Specifications, if you have any questions, please advise.

Respectfully submitted, n!)./b ff~-

J. D. Woodard AEJ:edb3014 l

Attachments cc: Mr. S. D. Ebneter Mr. S. T. Hoffman Mr. G. F. Maxwell 9106180444 M0531 _

/f PDR ADOCK 05000 ME

/

FDr p

\\

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS May 1991 The cycle 10-11 refueling outage continued into the month of May.

Power operation began at 2314 on 5-19-91.

The generator was taken off. ne at 1231 on 5-20-91 to perform a turbine overspeed trip test.

The unit returned to power operation at 1456 on 5-20-91.

At 0050 on 5-24-91, with the unit operating at approximately 78 per cent power, a reactor trip occurred when the two-out-of-three coincidence was satisfied for over-temperature-delta-temperature (0 TDT). Work in progress on pressurizer pressure instrument P1456 required channel 2 of OTDT to be placed in the tripped condition. At the same time, a portable instrument was attached to a resistance temperature detector (RTD) in channel 1 for an unrelated test. Attaching the test instrument to the channel 1 RTD caused a second channel of 0 TDT to enter the tripped condition and the coincidence for a reactor trip was satisfied.

The unit returned to power operation at 0413 on 5-25-91.

The following major safety-related maintenance was performed during the month:

1.

The number one seal on the IB reactor coolant pump was inspected.

2.

Miscellaneous corrective and preventive maintenance was performed on the diesel generators.

l l

l l

l l

l

~

~

OPERATING DA'IA REIORT DOCKET No. 50-348

~

DATE June 5,1991 COMPLL'IED BY D. N. Morey

'IELEPIKEE75 TEM 56 OPERATING STA'IUS Notes

1. Unit Name:

Joseph M. Farley - Unit 1

1) Cumulative data since
2. Reporting Period:

May 1991 12-1-77, date of

3. Licensed Thermal Power (tMt):

2,652 commercial operation.

4. Nameplate Rating (Gross FMe):

860

5. Design Electrical Rating (Net FMe):

829

6. Maximum Dependable Capacity (Gross eMe):

856.4

7. Maximum Dependable Capacity (Net tMe):

814.0

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Not FMe):

N/A

10. Reasons For Restrictions, If Any:

N/A

'Ihis Month Yr-to-Date Cumalative

11. Hours In Reporting Period 744 3623 118,319
12. Number Of Hours Reactor Was Critical 305.9 1913.8 90,868.1
13. Reactor Reserve Shutdown Hours 0.0 0.0 3.650.0
14. Hours Generator On-Line 259.0 1866.6 89,25B T
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (IMH) 467,378 4,706,621 Tl8,340,602
17. Gross Electrical Energy Generated (TMH) 143,180 1 522,880 73,573,218
18. Net Electrical Energy Generated (FMH)

~ 120,768 1,121,562 59,425,094

19. Unit Service Factor 34.8 51.T 75.4
20. Unit Availability Factor 34.8 51.5 75.4
21. Unit Capacity Factor (Using MDC Net) 19.9 48.2 72.6
22. Unit Capacity Factor (Using DER Net) 19.6 47.3 70.8
23. Unit Forced Outage Rate 9.6 1.4 7.3
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A

25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
26. Units In Test Status (Prior to Commercial Operation):

Forecast Ach.ieved INITIAL CRITICALITY 08/06/77 08/09/77 INITIAL ELECTRICITY 08/20/77 08/18/77 COMMERCIAL OPERATION 12/01/77 12/01/77 Form 2/34

DOCKET to.

50-348 UNIT 1

DATE June 5, 1991 COMPLETED BY D. N. Morey TELEPHOtE (205)899-5156 MOtml May DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

17 0

2 0

18 0

3 0

19 0

4 0

20 68 5

0 21 161 6

0 22 193 7

0 23 390 8

0 24 0

9 0

25 231 10 0

26 607 11 0

27 652 12 0

28 793 13 0

29 791 14 0

30

_ 90 7

15 0

31 789 16 0

INSTRUCTIONS On this format, list the average daily unit power level in IMe-Net for each day in the reporting month.

C<mpute to the nearest whole megawatt.

Form 13/21

i DocxzT 10.

50-348 UNIT SFJTDOWNS AND POWER REDucTIcts UNIT IDME J. M. FARIZ1 - INTT 1 CATE Jurna 5,1991 C M ET D. W. PCRET TEInKEE (2051899-5156 REPORT PEMETH mar i

I I

I I

i 1 nEnoo or i LicEz tE l l

l cucE a conEm..

l' w I acrz= m l

l l

l DuRArzm I lsnurrrm l Evurr I srsTzx !

5 1

t ro.

I nArE l TTrE l(nouRsi l Reason 2lDoWNREAcToR lREroRTe lcooE' lcDoE l

r,rvEN: am. -

3 2

lThe cycle 10-11 refueling outage continued from l

l001 l410501 l

5 l 455.2 l

C l

1 l

N/A j N/A l

N/A j

l l

l l

l l

l l

l l910308.

I i

i 1

I I

I I

i i

i l

lThegeneratorwastakenofflineforaturbine l002 l910520 l

5 l

2.4 l

B l

N/A l

N/A l

N< A l

N/A The reactor remained critical l l

l l

l l

l l

l j

loverspeedtriptest.

I I

1 1

I I

I I

I I

Iduri n this test.

I I

I I

i i

I I

i l

i l

lAt0500on5.-24-91,withtheunitoperatingat jo03 l 910524 l r l

27.4 l

H l

3 l91-006-00 l JC l

TT l

l l

l l

l l

l l

l lswroximately78percentpower,areactortrip loccurredwhenthetwo-out-of-threecoincidencewasl l

l l

l l

l l

l l

l l

l l

l l

l l

l l

l satisfied for over-temperature 41ta-touperature 1

1 I

I i

i i

l i

Imrvri. wrm in progress - pressurizer pr.ssure l l

l l

l l

l l

l l

l instrument FT456 reqaired channel 2 of oTDT to be l Atthesametime.l l

l l

l l

l l

l l

lplacedinthetrippedcondition.

l l

l l

l l

l l

l l

la portable instrument was attached to a resistance 2n channel 1 for an l

l l

l l

l l

l l

l l temperature detector (RTDI l

l l

l l

l l

l l

junrelatedtest. Attaching the test instrumant to l l

l 1

1 I

I I

i 1

Ithe channel 1 nTD c=us+d a sec=4 ch=1 et cTr? I I

I I

i I

i l

i i

Ito enter the trimed condition and the coincidence l l

l l

l l

l l

l l

l

[for a reactor trip was satisfied.

I 1

I I

I I

i i

i i

i l

j l

l l

l l

l l

l l m e event was caused by incorrect h tation.

The l

l l

l l

l l

l l

l lThe applicable drawings will be corrected.

l l

l l

l l

l l

l l

lunitreturnedtopoweroperationat0413on I

l l

1 1

I I

I I

i 15-2s91.

I i

i l

i I

i i

l 1

I I

l i

I I

I I

I I

I I

Exhibit G-Instructions Method:

F: Forced Reason:

for Preparation of Data 1-Manual S: Scheduled A-Equipment railure (Explain)

Entry sheets for Licensee 2-Manual Scram.

B-Maintenance or Test Event Report (IZR) File (!PJRIn-3-Automatic scram.

C-Refueling 0161) 4-other (Explain)

D-Regulatory Restriction E-q>erator Training & License Examination Exhibit I -Same Source F-Administrative G. operational Error (Explain)

H-other (Explain)

__-