Discusses Dcrdr for Units 1 & 2,per
ML20079B921
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 06/11/1991
From: Woodard J
ALABAMA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9106180187
Download: ML20079B921 (1)


Text

._

A%! cm. Plci,rr ; i rp r, o i.....~ o e ca.

Patir rD..'"A

/

(i " - 6.r' AV i i ~

mge,

.a 4

,a n

J. D. Woodud

/\\l{lbillllillk)WCl V. a she-1e

).f.,

4,<

ien r..a June 11 1991 Docket Nos. 50-348 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Vashington, DC 20555 Joseph H. Farley Nuclear Plant Detailed Control Room Design Review (CRDR)

Gentlemen Dy letter dated October 3, 1990, the NRC Staff forwarded a Safety Evaluation for the Farley Nuclear Plant CRDR.

Included in the NRC letter was a request to notify the NRC Staff on completion of the implementation of the required CRDR action for each unit. The completion of Unit 2 modifications were reported by a letter dated January 31, 1991.

Unit 1 modifications were completed during the recent Unit I tenth refueling outage.

The CRDR lluman Engineering Discrepancies (!!EDs) for Units 1 and 2 and proposed resolutions were provided to the NRC in the CRDR Summary Report by letter dated December 29, 1986.

It should be noted that some of the proposed resolutions in the Summary Report have been modifiedl however, all llEDs have been properly dispositioned.

Documentation of the dispositioning of the HEDs is available on site.

If there are any questions, please advise.

Respectfully submitted, fl l,o f j!<L,~A 7,g b

y J. D. Voodard JDV/REHimap 330 cet Mr. S. D. Ebneter Mr. S. T. Iloffman Mr. G. F. Maxwell 90

~

0106180187 910611 pga ADOU 050003 %,.

p FDR

..