Forwards Rev 17 to Physical Security/Contingency Plan to Reflect Testing of CCTV Sys,Util Planned Commitment for CCTV Assesment & Use of Roving Patrols as Compensatory Measures. Rev Withheld (Ref 10CFR73.21)
ML20079B279
Person / Time
Site: Browns Ferry  
Issue date: 06/07/1991
From: Wallace E
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9106140184
Download: ML20079B279 (3)


Text

_

SAT:.'.1,\\RD') INiURi4\\ TION

?

4 Ie G ;, 5 1 ),A, 5 sl, $ v w v e r ~ p u m.a n ::

~~

JUN 0 71991 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Hashington, D.C. 20555 Centlement In the Matter of Docket Nos. 50-259 Tennessee Valley Authority 50-260 50-296 BROWNS FERRY NUCLEAW PLANT (BFN) UNITS 1, 2, AND 3 - PHYSICAL SECURITY /CONTINCENCY PLAN (pS/Cp) REVISION 17 Enclosed is the subject item, dated April 9, 1991, and instructions for updating NRC copies 6 through 11.

This revision is submitted pursuant to 10 CFR 50.54(p).

It contains changes to reflect testing of the CCTV system. TVA's planned commitment for CCTV assessment, and reflects the use of roving patrols as compensatory measures.

A milestone schedulo for the completion of TVA's security upgrade project is included as Enclosure 1.

This plan revision was discussed with Orysia Masnyk and Cynthia perny of your Region 11 staff on May 30, 1991.

This letter and the enclosed information are being sent by registered mail.

The signed receipt signifies that you have received this information and acknowledge that it contains safeguards material and should be withhold from public disclosure as defined by 10 CFR 73.21.

This receipt will also be verification to TVA that NRC's copies of the plan have been updated, and the superseded material has been destroyed.

If you have any questions, please telephone C. k. Davis at (615) 751-7509.

Very ttvly yours.

TENNESSEE VALLEY AUTHORITY (a,

t

}

7 ' $,N1I1E i

  • ^

E. C. W

. lace, anager 7 O Nuclear Licensing (f

}'y y y and Regulatory Affairs i

Enclosures (Copies 6-9) v k""' a L't-\\4sh m, s y< NFOD*.*a b

n.

3 cc Sen page 2 Q

9106140}E.4 910607 s

PDR ADUCK 05000259 f

k

i 2

1

/

U.S. Nuclear Regulatory Commission JUN 0 71991 cci Ms. S. C. Black. Deputy Director Project Directorate 11-4 U.S. Nuclear Regulatory Commission One White Flint. North 11555 Rockv1110 Pike Rockville, Maryland 0852 Mr. Thierry M. Ross Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Ruckville. Maryland 20852 NRC Resident inspector Browns Ferry Nuclear Plant Foute 12. P.O. Box 637 Athens. Alabama 35609-2000 U.S. Nuclear Regulatory Commission (Enclosuree - Copies 10 and 11)

Region 11 P.O. Box 2257 Atlanta. Georgia 30301 Mr. B. A. Wilson Project Chief U.S. Nuclear Regulatory Commission Region 11 101 Marietta Street. NW Suite 2900 Atlanta. Georgia 30323

ENCLOSURE 1 DIYSICAL STCURITY UPCPADE PROJECT BROWNS FERRY WUCLEAR PLANT SCitEQykg Critical Events Milestones

1. Engineering complete 9/13/91
2. TVA Board approval to award construction 11/20/91
3. Complete construction 3/31/93 It should be noted that the above is our current schedulc.

Should circumstances occur that requires i chango in the above complottor date, you will be nottfled within 60 days of the chaago with a revised schedulo, t