Forwards Ref Matls Specified in NUREG-1021, Operator Licensing Examiner Stds. W/O Encl
ML20079A451
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 10/03/1990
From: Miller D
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
RTR-NUREG-1021 NUDOCS 9010150042
Download: ML20079A451 (3)


Text

,.

e.

g

.3 i

PilII.ADELPHIA ELECI'RIC COMPANY PE.ACil BOTIOM ATOMIC POWLR STATION R. D.1 Box 208 Delta, Pennsylvania 17514 0 17) 4 % 7014 ranca mornus-rw towsm or ascatttact D. B. Miller. Jr.

Vice hetident October 3, 1990 Docket Nos.

50 277 50 278 License Nos.

DPR 44 DPR-56 Mr. Thomas T. Martin, Regional Administrator U.S. Nuclear Regulatory Commission Region 1 475 Allendale Road King of Prussia, PA.19406 Subj ect:

Peach Bottom Atomic Power Station, Units 2 and 3 Limited (Fuel Handler) Senior Reactor Operator License

  • Difference" Examination Reference Material Submittal and Information Supporting a Request for Waiver of Examination and Testing Requirements.

Dear Mr. Martin:

NRC letter dated September 19, 1990 from Mr. Richard J. Conte to Mr. D.

M. Smith, Senior Vice President Nuclear, Philadelphia Electric Company (PECo), requested the submittal of Reference Material for the preparation and' review of the Peach Bottom Atomic Power Station (PBAPS) Senior Reactor Operator (Fuel Handler) Licensing examinations which are scheduled for the week of November 26, 1990. As directed, enclosed are the Reference Materials specified in NUREC 1021, " Operator Licensing Examiner Standards," ES 201.

Attachment A to this letter is the Master Reference Material Index.

The September 19,1990 letter also indicated tentative NRC approval of a f acility administered differences examination based on our July 5,1990 letter from Mr. E. A. Till (PEco) to Mr. T. T. Martin (NRC Region I).and the NRC's conclusion that there is no regulatory restriction or impediment to the issuance of multi site Senior Reactor Operator (Fuel llandler) licenses in response to our letter dated June 18, 1990 from Mr. G. A. Ilunger, Jr. (PEco) to the director of Nuclear Reactor Regulation. The NRC conclusion regarding multi site licenses was discussed by Mr. S, Pu11ani (NRC Region I) in a telephone conversation with Mr. R. Andrews (PEco) on September 17, 1990. The facility prepared differences examination will be sent to NRC Region I for review prior to administering at PBAPS.

m 3..

wh*

W od g o(

<.. 0; 9

~,

Additionally, Attachment B, ' Limited Senior License Operator Course Analysis,'

identifies the methodology used to determine the differences between PBAPS and Limerick Generating Station (LCS) fuel handling associated equipment, support systems, procedures, and Technical Specifications.

This analysis in conjunction with our July 5,1990 letter constitutes our -

justification'in support of a request for waiver from an NRC administered examination and the examination requirements to limit the examinations to

" differences" only. The individual operator license applications (NRC form 398s) will request a waiver of the examination and test requirements indicated F..

above in accordance with 10CFR55.47.

The required. training for the identified differexaes is scheduled to L

provide training contact hours as follows:

System _and System procedure 80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br /> classroom differences Normal / Abnormal, Fuel Handling,-

40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> classroom General Plant, Health Physics, and Emergency Operating procedural differences Complete Limited Senior Reactor 56 hours6.481481e-4 days <br />0.0156 hours <br />9.259259e-5 weeks <br />2.1308e-5 months <br /> On The-Job Training Operator (LSRO)* Qualification Manual (DJT)

Comprehensive Audit 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> Written /Walkthrough The differences examination will be developed'from the differences training material..This examination will be submitted to NRC Region I for review on or before November 19, 1990.

The following-schedule of events is provided to confirm agreements made in the telephone conversation between Mr. S. Pu11ani (NRC Region I) and Mr. R.

Andrews (PEco) on September 17, 1990.

I October 3, 1990 Submittal of Reference Materials October 26, 1990 Submittal of draft NRC Form 398s November 9, 1990 Complete Facility Audit exams November 12, 1990 Submittal of final NRC Form 398s l_

November 19, 1990 Difference Examination review by. NRC Week of November 26, 1990 Difference Examinations 1

i l

i 4

a 4

r.

e.

a O

Should you have any questions, please contact me, or have a member of your staff contact E. A. Till, Superintendent Training at (717) 456-3039.

l Sincerely,

/dte Attachments Enclosures ec:

Sonalyst, Inc. (w/ attachments and enclosures)

J. J. Lyash..USNRC Senior Resident Inspector, PBAPS (w/o attachments and enclosures)

R. J. Conte, _ Operations Branch, Region I, NRC (w/o attachments and enclosures)

S. V. Pu11ani, USNRC Region I (w/o attachments and enclosures) t/6ocument Control Desk, USNRC, Washington, D.C.

(w/o attachments and enclosures) 0 e

t 4