Text
,. _
~
k
' ~
EtIllon Support Departmrnt'.
4 10 CFR 50.55a a
)
v PECO ENERGY l13laf, ne7en,,e,,
a 965 Chesterbrook Boulevard -
Wayne, PA 19087 5691 l
February 22,1995 Docket Nos. 50-277 50-278 1
Ucense Nos. DPR-44 DPR-56 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
Peach Bottom Atomic Power Station, Units 2 and 3 Deletion of Revision 1 to Relief Request No. GVRR4 of the l
Second Ten Year Interval of the inservice Testing (IST) Program
Dear Sir:
In your letter dated October 27,1992 (C. L Miller (USNRC) to G. J. Beck (PECO Energy Company)), the U. S. Nuclear Regulatory Commission (USNRC) i approved Revision 1 to Relief Request No. GVRR-6. This relief request was created to consolidate several system-specific relief requests concerning compliance with Generic Letter 89-04, " Guidance on Developing Acceptable inservice Testing Programs", Attachment 1, Position 2 (Alternative to Full Flow Testing of Check Valves). PECO Energy Company is in compliance with j
Generic Letter 89-04, Attachment 1, Position 2, and is hereby deleting Revision i
1 to Relief Request No. GVRR-6. The IST Program will be revised to ensure
[
reference to the compliance with Generic Letter 89-04, Attachment 1, Position 2.
l This issue was discussed with the USNRC in a telephone call on February 14, 1995.
If you have any questions, please contact us.
j i
Very truly yours, t
A. a. 6 g.,.
G. A. Hunger J Director - Ucensing cc:
T. T. Martin, Administrator, Region I, USNRC
$[
W. L Schmidt, USNRC Senior Resident inspector, PBAPS l'
200617 l
IEE**E8cE El888Bn _
L 7
i P
P DR
.>