ML20078S656

From kanterella
Jump to navigation Jump to search
Clarifies Notification of Change in Licensed Operator Status,Effective 941130,re License SOP-3803-5
ML20078S656
Person / Time
Site: Millstone Dominion icon.png
Issue date: 12/22/1994
From: Miller D
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
MP-94-681, NUDOCS 9412290087
Download: ML20078S656 (2)


Text

i D

Northeast H pe Ferry Rd. (Route 156). Waterford, CT 06385 jI NuclearEnergy n, cone Noacar Po e, siacon Northeast Nuclear Energy Corupany P.O. B a 128 Waterford, Cr 06385-0128 (203) 447 1791 Fax (203) 444 4277 b Northeant Utihties System RE:

10CFR50.74(b)

December 22, 1994 MP-94-681 U.S. Nuclear Regulatory Commission Attention:

Document Control Desk Washington, DC 20555 1

REFERENCE:

Facility Operating License No. DPR-65 Docket No. 50-336 Notification ofJChange in Licensed Operator status In a letter dated December 8,

1994, m Northeast Nuclear Energy Company (NNECO) informed the NRC that there no longer existed the need to maintain the Millstone Unit No. 2 Senior Operator License of Dennis B.

Mooney, SOP-3803-5.

We stated that this-change in status was effective November 30, 1994.

Additionally, we l

referenced 10CFR50.74(a) as the reference for the notification to the NRC.

The purpose of this letter is to clarify that the notification regarding Mr. Mooney's Senior Operator License should have been made pursuant to 10CFR50.74 (b), in that effective November 7,

1994, Mr. Mooney was no longer employed by NNECO.

We regret any confusion that our original letter may have caused.

Should you have any questions regarding this, please contact Mr.

G.

H.

Bouchard, Director, Millstone Unit No.

2, at (203) 444-4302.

Very truly yours, NORTHEAST NUCLEAR ENERGY C PANY

/

J

'l Donald 'B. M121er, Jr.

f

' Senior Vice President Millstone Station cc:

See Page 2.

(1)

D.

B.

Miller, Jr.

letter to U.S.

Nuclear Regulatory Commission, "RE:

10CFR50.74 (a), " dated December 8, 1994.

&h

[ ggd 00 622 5 REY.1.H 9412290087 941222 PDR ADOCK 05000336

_v__ _ _

eor q

g

U.S.' Nuclear Regulatory Commission Page 2 9

cc:

T. T. Martin, Region I Administrator P. D. Swetland, Senior Resident Inspector, Millstone Unit Nos. 1, 2,

and 3 G. H. Bouchard, Director, Millstone Unit No. 2 M. J. Wilson, Manager, Nuclear Licensing R. W. Heidecker, Manager, Operator Training, Millstone Unit Nos. 1 and 2

---