Text

Ctation Sespport Department '

'i GL 89-10, Supplement 6 j

2 c.

_A V

PECO ENERGY

= o n t;;;; L e,,

965 Chesterbrook Boulevard i

Wayne, PA 19087-5691 l

December 21,1994 Docket Nos. 50-353 License Nos. NPF-85 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555

Subject:

Limerick Generating Station, Unit 2 Response to Generic Letter 89-10, Supplement 6, "Information on i

Schedule and Grouping, and Staff Response to Additional Public Ouestions" l

References:

1)

Letter from D. R. Helwig (PECO Energy Company) to NRC dated December 28,1989 i

2)

Letter from D. R. Helwig to NRC dated March 16,1992 3)

Letter from G. A. Hunger, Jr. (PECO Energy Company) to NRC dated April 14,1994

Dear Sir:

NRC Generic Letter (GL) 89-10, Supplement 6, "information on Schedule and Grouping, and Staff Responses to Additional Public Questions," sbtes that if a licensee intends to extend its current schedular commitment for verify'og the capability of motor operated valves (MOVs) within the scope of GL 89-10, the following information shall be submitted at least 80 days prior to the current commitment date, to assist the staff in evaluating the licensee's justification for extending the GL 89-10 test program for capability verification and establishing appropriate audit / inspection piens and schedules:

(1) the completion status of the licensee *s GL 89-10 program as of l

the current commitment date; I

i cDOD7b W N O N 353' P

PDR l

t J

i

)

December 21,1994

. Page 2 i

i (2)'

for those MOVs whose capability wBI not be varified b' dynamic f

testing by the current wimnui,- date, i

(a) for each valve: the valve type, size, safety function, design-basis differential pressure and flow, and the available valve factor (or similar capability measure), and a discussion of the relative risk significance of the valves involved-(b) coiinmetion that the functionality of these MOVs has been established using the best available information; and (c) the schedule for completing both the MOV tacting and any i

needed corrective actions.

PECO Energy Company (PECO Energy) expects to have completed all of its MOV testing commitments and have all valves set up with the best available data, as documented in the referenced letters, by the end of the Limerick Generating Station (LGS), Unit 2 refueling outage 2R03. However, new data obtained from outage testing must be assessed ar.d compared to the best l

available information used to set up the LGS Unit 2 MOVs to ensure that tlw l

most appropriate test data have been applied. Therefore, the purpose of this.

j letter is to request a 90 day schedule extension beyond the originally committed i

completion date to perform this additional assessment /recorciliation.

l We are providing the following information pursuant to GL 89-10, Supplement 6, to support our extension request:

(1)

The current schedule commitment for LGS Unit 2 is the end of the upcoming refueling outage 2R03, which is the third refueling outage since the issuance of GL 89-10. As inc"',ated above, PECO Energy expects to have completed all of the actions in accordance with its commitments by the end of this outage, i

currently expected to be late February 1995.

Many individual tasks are required to complete PECO Energy commitments to confirm the capability of each of the MOVs in the LGS Unit 2 GL 89-10 Program by the end of 2R03. These activities include: static testing, revising switch settings, modifications, and dynamic testing, some of which will be done during power ascension at the end of the outage. In addition, j

efforts are underway to collect industry test information. In order to provide sufficient time for a thorough and accurate assessment of the resuits of these efforts, PECO Energy is hereby requestirq a 90 day extension of the GL 89-10 Program for LGS Unit 2.

L d

h,

[ f.

[

t i

O ' &.i -

December 21,1994.-

l?;%-

. p80s 3

~,p

+

(2)

As discussed below, all testing commitments and capability q

verticationslare expected to be completed by the end of 2R03; therefore, the valve specific information, as addressed in GL 89-10 g

Supplement 6, item 2, need not I e submitted. Valves tested 1

6 during the outage will have their operability confirmed and an assessment of.their design basis capability performed prior to the end of the outage. Assessment / reconciliation of outage test i

L

'resuks to other applicable valves may take up to 90 days beyond the completion of the outage. However, these other applicable valves will have been set up prior to the end of the refueling 1

outage using assumed bounding design parameters established with the best available dynamic test data, and will be considered capable based on that data. Should any valve be found not capable as a result of the subsequent reconciliation, non-conformance reports will be initiated and appropriate actions taken.

If you have any questions or require additional information regarding this extension request, please contact us.

Sincerely, i

L(A..d.l'<agjv G. A. Hunger, Jr.,

Director - Licensing

Attachment:

Affidavit cc:

T. T. Martin, Administrator, USNRC, Region 1 I

N. S. Perry, Senior Resident inspector, USNRC, LGS I

i

e COMMONWEALTH OF PENNSYLVANIA l

i

SS.

. COUNTY OF CHESTER I

W. H. Smith, lil, being first duly swom, deposes and says:

That he is Vice President of PECO Energy Company; that he has read the i

response to Generic Lotter 89-10, Supplement 6, and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his

)

knowledge, information and belief.

$ //

~

Vice Presidy Subscribed and sworn to before me this J/

day of 1994.

i h')kitL

?

/

[

Notary Fjo6lic"

}

m sb** Sa' am.

Mycon E@

995

- - -