Forwards General Physics Corp,Through Cygna Energy Svcs Engineering Div Rept EOI-471, SWS Operational Performance Insp (Swsopi) for Ggns. GGNS Found to Have Implemented 5 Actions of GL 89-13
ML20078S128
Person / Time
Site: Grand Gulf 
Issue date: 02/15/1995
From: Hutchinson C
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20078S131 List:
References
GL-89-13, GNRO-95-00019, GNRO-95-19, NUDOCS 9502230373
Download: ML20078S128 (3)


Text

"

Ent:rgy Operation,Inc.

j4 e

ENTERGY

~~

en a> 7se J

Port Gbson, MS 39150 Te: 601437 2800 C. R. Hutchinson vce bese f.JpFahDrs Grand GuF Ne bm Suitcn i

February 15, 1995 U.S. Nuclear Regulatory Commission Mail Station P1-37 f

Washington, D.C.

20555 Attention:

Document Control Desk

Subject:

Grand Gulf Nuclear Station Docket No. 50-416 License No. NPF-29 GGNS Service Water System Operational Performance Inspection (SWSOPI) Final Report GNRO-95/00019 P

Gentlemen:

On September 27, 1994, Grand Gulf Nuclear Station (GGNS) submitted to the NRC a request for a reduced-scope Service Water System Operational Performance Inspection (SWSOPI) based upon GGNS performing a self-assessment on the Service Water System.

Information provided in that submittal included the assessment plan, the technical review plans, and resumes for the General Physics' team members.

General Physics Corporation, through its Cygna Energy Services Engineering Division, conducted a SWSOPI at GGNS from October 24, 1994 to November 18, 1994.

The inspection was conducted by a six member inspection team comprised of five reviewers from General Physics and one from Cleveland Electric Illurinating Company, which is a member of the BWR 6 Owner's Group (resume provided as Attachment 2).

The SWSOPI final report for GGNS is provided as Attachment 1.

GGNS was found to have implemented the 5 Actions of Generic Letter 89-13.

Programmatic strengths included the Chemical Treatment Program, the Heat Exchanger Heat Transfer Testing Program, Maintenance Programs, and the Small Bore Pipe Examination and Replacement Program.

Also, consistent with IN 94-79, a need to periodically assess a representative sample of the large bore Standby Service Water piping weld joints was identified.

0$b0 G9502141 9502230373 950215 PDR

f. DOCK 05000416 a

PDR j

??

s i

O l

l i

February 15, 1995 GNRO-95/00019 Page 2 of 3 l

l i

Other miscellaneous observations identified during the SWSOPI l

are discussed in detail in the body of the report.

i GGNS is addressing the observations identified in the final report, and any actions taken will be documented and maintained on site.

If you have any questions regarding the e

report, please contact Rita Jackson at 601-437-2149.

Yours truly,

@/db CRH/RRJ/

f attachments:

1.

SWSOPI Final Report i

2.

Resume for Cleveland Electric Team Member cc:

Mr. J. E. Tedrow (w/a)

Mr. H. W. Keiser (w/a)

Mr. R. B. McGehee (w/a)

Mr. N. S. Reynolds (w/a)

Mr. H. L. Thomas (w/o)

Mr. Stewart D. Ebneter (w/a) l Regional Administrator U.S. Nuclear Regulator? Commission l

Region II j

101 Marietta St.,

N.W.,

Suite 2900 Atlanta, Georgia 30323 Mr.

P. W. O'Connor, Project Manager (w/2)

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission i

Mail Stop 13H3 Washington, D.C.

20555 l

I i

i

[

G9502141

y e.-

a to GNRO-95/00019 Grand Gulf Nuclear Station Service Water System Operational Performance Inspection Final Report i

G9502141