ML20078R617

From kanterella
Jump to navigation Jump to search
Forwards Reformatted TS Pages,Substituting for Pages Contained in Proposed TS Amends Submitted Prior to 950130 Authorization
ML20078R617
Person / Time
Site: Pilgrim
Issue date: 02/15/1995
From: Boulette E
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20078R621 List:
References
#95-022, #95-22, NUDOCS 9502230051
Download: ML20078R617 (2)


Text

,

. i O 10CFR50.90 BOSTON EDISON  !

.. Piigran Nuclear Power Station i Rocky Hdi Road l Plymouth, Massachusetts 02360  ?

i February 15, 1995 E. T. Bouloote, PhD BECo Ltr. #95 022 t Senior Vice President- Nuclear U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Docket No. 50-293 License No. DPR-35 Reformatted Technical Specification Paaes .

By letter of January 30,1995, the NRC authorized Pilgrim to use reformatted Technical Specifications.

The letter also requested Pilgrim to submit reformatted pages to substitute for pages contained in proposed Technical Specification Amendments submitted prior to the January 30,1995 authorization. .

The pages attached to this letter address this request. Please note that the textual content of the  ;

reformatted pages is identical to textual content of the pages they replace. >

\  !

f[. .0 u n,  ;

E. . Boulette, PhD ETB/PMK/nas/ newts / Reformat i

Attachments: A through D {

\

cc: Mr. R. Eaton, Project Manager Division of Reactor Projects - 1/II Mail Stop: 14D1 )

U. S. Nuclear Regulatory Commission  ;

4 ' 9ite Flint North 1 id55 Rockville Pike j Rockville, MD 20852 U.S. Nuclear Regulatory Commission i Region i 475 Allendale Road King of Prussia, PA 19406 Senior Resident inspector Pilgrim Nuclear Power Station Mr. Robert M. Hallisey, Dkector Radiation Control Prog am 7  !

Center for Communicaale Diseases 0 Mass. Dept. of Public E'ealth O ,

305 South Street Ig I '

Jamaica Plain, MA 02130 tA i

9502230051 950215 i PDR ADOCK 05000293 (

P PDR

. . -_. -. - - . = - - - . - - = ._.

t.y . _ .

9, .-

I i

5 l

i i

i I

f ATTACHMENT A TO BECo Letter #95- 022 f Reactor Pressure to isolate the Shutdown Cooling (BECo Ltr. #2.94.097 dated 9/6/94) i i

Old Paoe # New Paoe # {

45 3/4.2-7 48 3/4.2-11 68 B3/4.2-1 i

l i

I f

i I

l l

_, - --