o' L
North Atlantic Energy Service Corpor iion Nort:1 p.0 oe,300 s
h(7 Atlantic Scabrook, NH 03874 (603) 474 9521, Fax (603) 474-2987 L
The Northeast Utilities System Ted C. Feigenbaum j
NYN 95014 Senior Vice president &
Chief Nuclear Officer February 10,1995 United States Nuclear Regulatory Commission Washington, DC 20555 h
Attention:
Document Control Desk
Reference:
Facility Operating License NPF-86, Docket No. 50-443 l
Subject:
Monthly Operating Report Gentlemen:
Enclosed please find Monthly Operating Report 95-01. This report addresses the operating and shutdown experience relating to Scabrook Station Unit I for the month of January,1995 and is submitted in accordance with the requirements of Scabrook Station Technical SpecificationJ14r
,e Very
[yours,
/
Jrt3:
'Or~'
Ted C. Feigenba Enclosure cc:
Mr. Thoma T. Martin Regional Adn:inistrator I
U.S. Nuclear Regulatory Commission Region I
)
475 Alleadale Road King of Prussia, PA 19406 Mr. Albert W. De Agazio, Sr. Project Manager Project Directorate I-4 Division of Reactor Projects U.S. Nuclear Regulatory Commission Washington, DC 20555 Mr. Richard Laura NRC Senior Resident inspector P.O. Ilox 1149 Seabrook, Nil 03874 i
,. e n,. -
9502220188 '750131 PDR ADOCK 05000443
~ /ql R
PDR l
l
OPERATING DATA REPORT DOCKET NO.
50453 UNIT Seabrook 1 DATE 02/10/95 COMPLETED BY P.E. Nardone TELEPilONE 603/474-9521 Ext. 4074 OliRATINGhTAIL'S 1.
Unit Name:
Seabrook Station Unit 1 2.
Reportmg Period JANUARY 1995 3.
Lacerned Thermal Power (MWI).
3411 4.
Nameplate Ratmg (Gross MWe):
1197 5.
Design Electrical Rating (Net MWe):
1148 6.
Maximum Dependable Capacity (Gross MWe):
1200 7.
Maximum Deperslable Capacity (Net MWe):
1150 k.
If Changes Occur ir. Capacity Ratmps (items Numhet 3 through 7) Since Last Not Applicable Report, Give Reasons:
9.
Power Level To Which Restricted, if Any:
Nonc 10.
Reasons I or Restrictions, if Any.
Not Applicable This Month Yr-to-Date Cumulative 11.
Ilours m Reportmg Pernd 744.0 744.0 72697.0
~ 12.
Number of Ilours Reactor Was Crincal 744 0 744.0 34011.0 13.
Reactor Reserve Shutdown llours 0.0 00 953.3 14.
Ilours Generator On Line 744.0 744.0 31888.2 15.
Unit Reserve Shutdown llours 0.0 0.0 0.0 16 Gross Thermal Energy Generated (MWil) 2535836 2535836 1(M372644 17.
Gross Elec. EnerFy Generated (MWil) 8';1406 891406 36315741 18.
Net Electncal Energy Generated (MWil) 857403 857403 34884520
- 19.
Unit Sernce Factor 100.0 100.0 78.2
'20 Unit Availability Factor 100.0 100.0 78.2
- 21.
Umt Capacity 1 actor (Usmg MDC Net) 100.2 100.2 75.4
'22.
l'mt Capactry Factor (Usmg DER Net) 100 4 100.4 75.5
- 23.
Umt Forced Outage Rate 0.0 0.0 6.6 24.
Shutdowns Scheduled Over Next 6 Months (Type. Date.
None Scheduled aiki Durationi of Eacht 25.
If Shut Down At Ers! Of Report Pernsi. Estm'ated Date of Not Apphcable Startup.
' NOTE. " Cumulative
- values based on total hours startmg R.'19'90. date ReFular Full Power Operanon began.
I of 4
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50443
)
UNIT Seabrook i j
i DATE 02/10/95 j
COMPLETED BY P.E. Nardone TELEPilONE (i)3/474 9521 Ext. 4074 MONTil: J ANUARY,1995 l
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net)
I i153 17 l154 2
1153 18 1152 3
1153 19 1152 4
1153 20 1152 5
1152 21 1153 6
1152 22 1153 7
1153 23 1853 8
1152 24 1153 9
1152 25 1153 10 1150 26 1152 11 1151 27 1152 12 1151 28 1152 13 1153 29 1152 14 1152 30 1853 15 1153 31 1152 16 1153 INSTRUCTIONS On this fornuu. list the average daily umt pmer lesei in MWe-Net for each day in the reportmg month. Compute to the nearest whole megawsts, l
2 of 4
UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50443 UNIT 5eabrick I
=
DATE 02/10,95 COMPLETED BY P.E. Nardone TELEPilONE
( & 47 & 9521 Ext.4074 REPORT MONTil JANUARY 1995 NO.
DATE TYPE' DURATION REASON METIIOD OF SIIUTTING LICENSEE ETUT CAUSE & CORRECTIVE ACTION 11) PRE 4DT 2
(IIOURS)
DOWN REACTOR' REPORTF RECURRENCE Page1 ofI No entries for this month.
I 2
3 F: Forced Reawn.
Method:
S: Scheduled A - Eqmpment Failure (Explain) 1 - Manual B - Maimenance or Test 2 - Manual Scram C - Refuehng 3 - Automatic Scram D - Regulatory Restrxton 4 - Conunued from prevkms month E - Operator Training & License Examinaron 5 - Power Reduction (Duration = 0)
F-Admirustranve 9 - Other (Explain)
G - Operatenal Error (Explam)
II - Other (Explain) 3 of 4
REFUELING INFORMATION REQUEST DOCKET NO.
50443 UNIT Seabrook1 DATE 02/10/95 COMPLETED BY P.E. Nardone TELEPilONE 603/474-9521 Ext. 4074 1.
Name of Facility:
Seabrook Unit 1 2,
Scheduled date for next refueling shutdown:
Refueling Outage 4,01/06/96 3.
Scheduled date for restart following refueling: Refueling Outage 4,02/20/96 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
None 5.
Schedule date(s) for submitting licensing action and supporting information:
N/A 6.
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
None 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a) in Core:
193 (b) 208 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
Present licensed capacity:
1236 No increase m storage capacity requested or planned.
9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
Licensed capacity of 1236 fuel assemblies based on two annual and twelve eighteen-month refuelings with full core offload capability.
)
The current licensed capacity is adequate until at least the year 2010.