OPERATING DATA REPORT DOCKET NO.
50-263
' DATE 11-1-94 COMPLETED BY H.
H.
Paustian TELEPHONE 612/295-5151 OPERATING STATUS
] Notes
]
- 1. Unit Name :
Monticello
]
]
- 2. Reporting period:
October
]
]
- 3. Licensed Thermal Power (MWt):
1670
]
]
4.
Nameplate Rating (Gross MWe) :
569
]
]
- 5. Design Electrical Rating (Net MWe):
545.4
]
]
- 6. Maximum Dependable Capacity (Gross MWe):
564
]
]
~~
- 7. Maximum Dependable Capacity (Net MWe) :
536
)
]
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe) :
N/A
- 10. Reasons For Restrictions, If Any: __N/A THIS MONTH YR.-TO-DATE CUMULATIVE
- 11. Hours In Reporting Period 745 7296 204577
- 12. Number ef Hours Reactor Was Critical 223.4 6234.9 165610.6
- 13. Reactoi Reserve Shutdown Hours 0.0 0.0 940.7
- 14. Hours Generator On-Line 174.7 6148.0 162748.7
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 272496 9962158 251226938
- 17. Gross Electrical Energy Generated (MWH) 91571 3351334 84905997
- 18. Net Electrical Energy Generated (MWH) 85518 3206735 81225528 l
- 19. Unit Service Factor 23.5%
84.3%
79.6%
- 20. Unit Availability Factor 23.5%
84.3%
79.6%
- 21. Unit Capacity Factor (Using MDC Net) 21.4%
82.0%
74.1%
- 22. Unit Capacity Factor (Using DER Net) 21.0%
80.6%
72.8%
- 23. Unit Forced Outage Rate 0.0%
3.1%
3.6%
- 24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)
_None
- 25. If Shut Down At End Of Report Period, Estimated Date Of Startup:N/A
- 26. Units In Test Status (Prior to Commercial Operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
]DR412220132 941213 ADOCK 0500o263 p
PnR
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-263
-UNIT Monticello-DATE 11-1-94 COMPLETED BY H. H.
Paustian i
TELEPHONE 612/295-5151 MONTH OF October f
DAY.
AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1
-2.
17
-5.
2
-3.
18
-3.
i 3
-2.
19
-4.
4
-3.
20
-9.
l 5
-4.
21
-5.
6
-3.
22
-8.
7
-3.
23
-11.
8
-3.
24 12.
l 9
-3.
25 296.
t f
10
-3.
26 552.
l 11
-2.
27 554.
12
-3.
28 557.
i 13
-3.
29 556.
14
-3.
30 556.
t 15
-7.
31 554.
16
-5.
1 INSTRUCTIONS i
on this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
[ NIT SIRTID0VNS AND POVER REDUCTIONS DOCITT Ho. 50-263
(.
INIT NAME Nonticello DATE ~11-01-94 REPORT H0tml October COMPLETED BY il. H. Paustian TELEPHONE 612/295-5151 7 tio.
Date Ty(peDeration Reason Method LER System Comp.
Cause & Corrective 1)
(hours)
(2) of No.
Code Code Action to Shutdovn (4)
(5)
Prevent Recurrence (3) 6 10-01-94 S
570.3 C
1 N/A Plant shutdown for 1994 (EOC16) refueling outage.
t 1
2 F: Forced Reason:
3 4
Hethod:
S: Scheduled A-Equipment Failure (Explain) 1-Manual Draft IEEE Standard B-Haintenance or Test C-Refueling 2-Manual Scram 805-1984(P805-DS)
D-Regulator Restriction 3-Automatic Scram 5
E-Operator Training & License Examination 4-Other (Explain)
IEEE Standard 803A-1983 F-Administrative G-Operational Error (Explain)
Il-Other (Explain)
- - - - - - - - - - - ~ - - - -