Corrected Data to Monthly Operating Rept for Oct 1994 for Monticello Nuclear Generating Plant
ML20078Q386
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 10/31/1994
From: Paustian H
NORTHERN STATES POWER CO.
To:
Shared Package
ML20078Q372 List:
References
NUDOCS 9412220132
Download: ML20078Q386 (3)


Text

OPERATING DATA REPORT DOCKET NO.

50-263

' DATE 11-1-94 COMPLETED BY H.

H.

Paustian TELEPHONE 612/295-5151 OPERATING STATUS

] Notes

]

1. Unit Name :

Monticello

]

]

2. Reporting period:

October

]

]

3. Licensed Thermal Power (MWt):

1670

]

]

4.

Nameplate Rating (Gross MWe) :

569

]

]

5. Design Electrical Rating (Net MWe):

545.4

]

]

6. Maximum Dependable Capacity (Gross MWe):

564

]

]

~~

7. Maximum Dependable Capacity (Net MWe) :

536

)

]

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe) :

N/A

10. Reasons For Restrictions, If Any: __N/A THIS MONTH YR.-TO-DATE CUMULATIVE
11. Hours In Reporting Period 745 7296 204577
12. Number ef Hours Reactor Was Critical 223.4 6234.9 165610.6
13. Reactoi Reserve Shutdown Hours 0.0 0.0 940.7
14. Hours Generator On-Line 174.7 6148.0 162748.7
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 272496 9962158 251226938
17. Gross Electrical Energy Generated (MWH) 91571 3351334 84905997
18. Net Electrical Energy Generated (MWH) 85518 3206735 81225528 l
19. Unit Service Factor 23.5%

84.3%

79.6%

20. Unit Availability Factor 23.5%

84.3%

79.6%

21. Unit Capacity Factor (Using MDC Net) 21.4%

82.0%

74.1%

22. Unit Capacity Factor (Using DER Net) 21.0%

80.6%

72.8%

23. Unit Forced Outage Rate 0.0%

3.1%

3.6%

24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)

_None

25. If Shut Down At End Of Report Period, Estimated Date Of Startup:N/A
26. Units In Test Status (Prior to Commercial Operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

]DR412220132 941213 ADOCK 0500o263 p

PnR

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-263

-UNIT Monticello-DATE 11-1-94 COMPLETED BY H. H.

Paustian i

TELEPHONE 612/295-5151 MONTH OF October f

DAY.

AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1

-2.

17

-5.

2

-3.

18

-3.

i 3

-2.

19

-4.

4

-3.

20

-9.

l 5

-4.

21

-5.

6

-3.

22

-8.

7

-3.

23

-11.

8

-3.

24 12.

l 9

-3.

25 296.

t f

10

-3.

26 552.

l 11

-2.

27 554.

12

-3.

28 557.

i 13

-3.

29 556.

14

-3.

30 556.

t 15

-7.

31 554.

16

-5.

1 INSTRUCTIONS i

on this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

[ NIT SIRTID0VNS AND POVER REDUCTIONS DOCITT Ho. 50-263

(.

INIT NAME Nonticello DATE ~11-01-94 REPORT H0tml October COMPLETED BY il. H. Paustian TELEPHONE 612/295-5151 7 tio.

Date Ty(peDeration Reason Method LER System Comp.

Cause & Corrective 1)

(hours)

(2) of No.

Code Code Action to Shutdovn (4)

(5)

Prevent Recurrence (3) 6 10-01-94 S

570.3 C

1 N/A Plant shutdown for 1994 (EOC16) refueling outage.

t 1

2 F: Forced Reason:

3 4

Hethod:

S: Scheduled A-Equipment Failure (Explain) 1-Manual Draft IEEE Standard B-Haintenance or Test C-Refueling 2-Manual Scram 805-1984(P805-DS)

D-Regulator Restriction 3-Automatic Scram 5

E-Operator Training & License Examination 4-Other (Explain)

IEEE Standard 803A-1983 F-Administrative G-Operational Error (Explain)

Il-Other (Explain)

- - - - - - - - - - - ~ - - - -