|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217D1261999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Monticello Nuclear Generating Plant.With ML20216E7031999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Monticello Nuclear Generating Plant.With ML20210Q6611999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Monticello Nuclear Generating Plant.With ML20209F7901999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Monticello Nuclear Generating Plant.With ML20195H0351999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Monticello Nuclear Generatintg Plant.With ML20206N1721999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Monticello Nuclear Generating Plant.With ML20205P5701999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Monticello Nuclear Generating Plant.With ML20205G7391999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Monticello Nuclear Generating Plant.With ML20199F6211998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Mngp.With ML20198B2531998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Monticello Nuclear Generating Plant.With ML20195D2381998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Monticello Nuclear Generating Plant.With ML20154L3471998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Monticello Nuclear Generating Plant.With ML20153B0861998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Monticello Nuclear Generating Plant.With ML20237B8461998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Monticello Nuclear Generating Plant ML20236R1941998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Monticello Nuclear Generating Plant ML20249A5861998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Monticello Nuclear Generating Plant ML20247K3971998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Monticello Nuclear Generating Plant ML20217F6431998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Monticello Nuclear Generating Plant ML20216H6481998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Monticello Nuclear Generating Plant ML20203B2821998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Monticello Nuclear Generating Station ML20198P2201997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Monticello Nuclear Generating Plant ML20203J7131997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Monticello Nuclear Generating Plant ML20199H8181997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Monticello Nuclear Generating Plant ML20217K2081997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Monticello Nuclear Generating Plant ML20216H7771997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Monticello Nuclear Generating Plant ML20217K2741997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Monticello Nuclear Generating Plant ML20149E2921997-06-30030 June 1997 Monthly Operating Rept for June 1997 for MNGP ML20141C2841997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Monticello Nuclear Generating Plant ML20137W2621997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Monticello Nuclear Generating Plant ML20136H1671997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Monticello Nuclear Generating Plant ML20134M7071997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Monticello Nuclear Generating Plant ML20133J1401996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Monticello Nuclear Generating Plant ML20132A8771996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Monticello Nuclear Generating Plant ML20134L2761996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Monticello Nuclear Generating Plant ML20128Q7831996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Monticello Nuclear Generating Plant ML20117M8161996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Monticello Nuclear Generating Plant ML20116M2991996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Monticello Nuclear Generating Plant ML20115H5651996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Monticello Nuclear Generating Plant ML20112J1921996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Monticello Nuclear Generating Plant ML20112A3121996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Monticello Nuclear Generating Plant ML20107E9831996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Monticello Nuclear Generating Plant ML20106H0591996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Monticello Nuclear Generating Plant ML20100G5031996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Monticello Nuclear Generating Plant ML20096C8061995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Monticello Nuclear Plant ML20095G0231995-11-30030 November 1995 Monthly Operating Rept for Nov 1997 for Monticello Nuclear Generating Plant ML20094L1921995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Monticello Nuclear Generating Plant ML20093E6241995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Monticello Nuclear Generating Plant ML20092F4121995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Monticello Nuclear Generating Plant ML20087H3011995-07-31031 July 1995 Monthly Operating Rept for Jul 1995 for Monticello Nuclear Generating Plant ML20086K1731995-06-30030 June 1995 Monthly Operating Rept for June 1995 for Monticello Nuclear Generating Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H2061999-10-12012 October 1999 Safety Evaluation Supporting Amend 106 to License DPR-22 ML20217D1261999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Monticello Nuclear Generating Plant.With ML20216E7031999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Monticello Nuclear Generating Plant.With ML20210Q0521999-08-0404 August 1999 Safety Evaluation Approving Relief Request 10 to License DPR-22 Per 10CFR50.55a(g)(6)(i).Inservice Exam for Relief Request 10,Parts A,B,C,D & E Impractical & Reasonable Assurance of Structural Integrity Provided ML20210Q6611999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Monticello Nuclear Generating Plant.With 05000263/LER-1999-007, :on 990610,HPCI Test Return Valve Was Unable to Close Against Max Expected Differential Pressure.Caused by Failure to Accurately Predict Valve Performance.Procedure Revised.With1999-07-0909 July 1999
- on 990610,HPCI Test Return Valve Was Unable to Close Against Max Expected Differential Pressure.Caused by Failure to Accurately Predict Valve Performance.Procedure Revised.With
05000263/LER-1999-006-01, :on 990602,during Quarterly Surveillance Hcpi Was Declared Inoperable.Caused by Drain Pot Alarm.Revised HPCI Surveillance Test Procedure.With1999-07-0202 July 1999
- on 990602,during Quarterly Surveillance Hcpi Was Declared Inoperable.Caused by Drain Pot Alarm.Revised HPCI Surveillance Test Procedure.With
ML20209F7901999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Monticello Nuclear Generating Plant.With 05000263/LER-1999-005, :on 990508,personnel Inserted Manual Scram When Pressure Transient Closed Air Ejector Suction Isolation Valves & Tripped off-gas Sys.Caused by Recombiner Catalyst Migration.Catalyst Was Removed.With1999-06-0707 June 1999
- on 990508,personnel Inserted Manual Scram When Pressure Transient Closed Air Ejector Suction Isolation Valves & Tripped off-gas Sys.Caused by Recombiner Catalyst Migration.Catalyst Was Removed.With
ML20195H0351999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Monticello Nuclear Generatintg Plant.With 05000263/LER-1999-004-01, :on 990422,low Reactor Water Level Scram,Group 2 & 3 Isolations & Subsequent HPCI Became Inoperable.Caused by Feedwater Controller Power Supply Failure.Three Power Supplies Replaced & Connections Cleaned.With1999-05-24024 May 1999
- on 990422,low Reactor Water Level Scram,Group 2 & 3 Isolations & Subsequent HPCI Became Inoperable.Caused by Feedwater Controller Power Supply Failure.Three Power Supplies Replaced & Connections Cleaned.With
05000263/LER-1999-003-01, :on 990412,HPCI & Division 1 ECCS Equipment Were Declared Inoperable Due to Svc Water Pump Failure.Pump Shaft Was Mechanically Freed,Check Valve Was Repaired & Pump Was Successfully Tested.With1999-05-12012 May 1999
- on 990412,HPCI & Division 1 ECCS Equipment Were Declared Inoperable Due to Svc Water Pump Failure.Pump Shaft Was Mechanically Freed,Check Valve Was Repaired & Pump Was Successfully Tested.With
05000263/LER-1999-002-01, :on 990329,event Sequence That Results in Available ECCS Being Reduced to Less than That Assumed in Current Safety Analysis.Caused by Failure of Edg.Plant Operating Procedures Revised.With1999-05-11011 May 1999
- on 990329,event Sequence That Results in Available ECCS Being Reduced to Less than That Assumed in Current Safety Analysis.Caused by Failure of Edg.Plant Operating Procedures Revised.With
ML20206N1721999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Monticello Nuclear Generating Plant.With ML20205N0861999-04-12012 April 1999 Safety Evaluation Re Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20205P5701999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Monticello Nuclear Generating Plant.With ML20205C1651999-03-19019 March 1999 Safety Evaluation Supporting Amend 105 to License DPR-22 ML20204H4951999-03-18018 March 1999 SER Concluding That Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Monticello.Therefore Staff Concludes Licensee Adequately Addressed Action Required in GL 96-05 05000263/LER-1999-001-02, :on 990215,HPCI High Steam Flow Isolation During Quarterly Surveillance Test Was Noted.Caused by Inadequate Surveillance Procedure.Revised Surveillance Procedure.With1999-03-17017 March 1999
- on 990215,HPCI High Steam Flow Isolation During Quarterly Surveillance Test Was Noted.Caused by Inadequate Surveillance Procedure.Revised Surveillance Procedure.With
ML20205G7391999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Monticello Nuclear Generating Plant.With ML20202F7901999-01-25025 January 1999 1999 Four Year Simulator Certification Rept for MNGP Simulation Facility ML20199E4871999-01-0606 January 1999 SER Accepting Licensee 951116,960214 & 0524 Responses to NRC Bulletin 95-002, Unexpected Clogging of Residual Heat Removal Pump Strainer While Operating in Suppression Pool Cooling Mode ML20205H0561998-12-31031 December 1998 Northern States Power Co 1998 Annual Rept. with ML20199F6211998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Mngp.With ML20198P0691998-12-28028 December 1998 Safety Evaluation Concluding That NSP Proposed Alternative to Paragraph III-3411 of App III to 1986 Edition of Section XI of ASME Code Provides Acceptable Level of Quality & Safety.Alternative Authorized ML20198M8221998-12-24024 December 1998 Safety Evaluation Supporting Amend 104 to License DPR-22 ML20198M6901998-12-23023 December 1998 Safety Evaluation Supporting Amend 103 to License DPR-22 ML20198D0751998-12-10010 December 1998 Safety Evaluation Supporting NSP Proposed Change to EOPs to Use 2/3 Core Height as Potential Entry Condition Into Containment Flooding ML20198B2531998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Monticello Nuclear Generating Plant.With ML20195E3691998-11-12012 November 1998 Safety Evaluation Concluding That Licensee USI A-46 Implementation Has Met Purpose & Intent of Criteria in GIP-2 & Staff Sser 2 for Resolution of USI A-46 ML20195D2381998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Monticello Nuclear Generating Plant.With ML20198J4451998-10-22022 October 1998 Rev 2 to SIR-97-003, Review of Test Results of Two Surveillance Capsules & Recommendations for Matls Properties & Pressure-Temp Curves to Be Used for Monticello Rpv 05000263/LER-1998-005-01, :on 980921,HPCI Was Removed from Service to Repair Steam Leak in Drain Trap by Pass.Caused by Localized Erosion of Valve Body.Valve Was Declared Inoperable & Was Replaced with Manual Valve1998-10-21021 October 1998
- on 980921,HPCI Was Removed from Service to Repair Steam Leak in Drain Trap by Pass.Caused by Localized Erosion of Valve Body.Valve Was Declared Inoperable & Was Replaced with Manual Valve
05000263/LER-1998-004-02, :on 980909,manual Scram Was Inserted Following Pressure Transient Closed Air Ejector Suction Isolation Valves & Trips Offgas Recombiners,Occurred.Caused by Seat Leakage.Leaking Valve Seat Was Reworked1998-10-0909 October 1998
- on 980909,manual Scram Was Inserted Following Pressure Transient Closed Air Ejector Suction Isolation Valves & Trips Offgas Recombiners,Occurred.Caused by Seat Leakage.Leaking Valve Seat Was Reworked
ML20154L3471998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Monticello Nuclear Generating Plant.With ML20153F0511998-09-21021 September 1998 Rev 2 to MNGP Colr,Cycle 19 ML20153E9361998-09-0808 September 1998 Rev 1 to MNGP Colr,Cycle 19 ML20153B0861998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Monticello Nuclear Generating Plant.With ML20151T0981998-08-28028 August 1998 Safety Evaluation Supporting Amend 101 to License DPR-22 ML20237B8461998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Monticello Nuclear Generating Plant ML20236W5041998-07-21021 July 1998 ISI Exam Summary Rept - Refueling Outage 19 ML20236R1941998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Monticello Nuclear Generating Plant ML20249A5861998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Monticello Nuclear Generating Plant 05000263/LER-1998-003-01, :on 980417,transgranular Stress Corrosion Cracking Was Identified in Control Rod Drive Lines.Caused by chloride-induced Transgranular stress-corrosion Cracking. Affected Sections of Two Lines Replaced1998-05-14014 May 1998
- on 980417,transgranular Stress Corrosion Cracking Was Identified in Control Rod Drive Lines.Caused by chloride-induced Transgranular stress-corrosion Cracking. Affected Sections of Two Lines Replaced
05000263/LER-1998-002-02, :on 980415,main Steam Isolation Valve Position Setpoint Outside Allowed Range,Was Found.Caused by Previous Testing Technique & Use of Particular Switch Model.Eight New Position Switches W/Less Deadband Installed1998-05-14014 May 1998
- on 980415,main Steam Isolation Valve Position Setpoint Outside Allowed Range,Was Found.Caused by Previous Testing Technique & Use of Particular Switch Model.Eight New Position Switches W/Less Deadband Installed
ML20247K3971998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Monticello Nuclear Generating Plant 05000263/LER-1998-001-02, :on 980323,discovered Containment Isolation Valve Leakage Exceeded TS Limit.Caused by Foreign Matl Found on Valve Seat.Repaired Subject Valves & Developed Process to Ensure Cleanliness of Testing Equipment1998-04-22022 April 1998
- on 980323,discovered Containment Isolation Valve Leakage Exceeded TS Limit.Caused by Foreign Matl Found on Valve Seat.Repaired Subject Valves & Developed Process to Ensure Cleanliness of Testing Equipment
ML20217E9611998-04-20020 April 1998 Safety Evaluation Supporting Amend 100 to License DPR-22 ML20217D8731998-04-13013 April 1998 Rev 0 to MNGP Colr,Cycle 19 ML20217F6431998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Monticello Nuclear Generating Plant 1999-09-30
[Table view] |
Text
OPERATING DATA REPORT DOCKET NO.
50-263
' DATE 11-1-94 COMPLETED BY H.
H.
Paustian TELEPHONE 612/295-5151 OPERATING STATUS
] Notes
]
- 1. Unit Name :
Monticello
]
]
- 2. Reporting period:
October
]
]
- 3. Licensed Thermal Power (MWt):
1670
]
]
4.
Nameplate Rating (Gross MWe) :
569
]
]
- 5. Design Electrical Rating (Net MWe):
545.4
]
]
- 6. Maximum Dependable Capacity (Gross MWe):
564
]
]
~~
- 7. Maximum Dependable Capacity (Net MWe) :
536
)
]
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe) :
N/A
- 10. Reasons For Restrictions, If Any: __N/A THIS MONTH YR.-TO-DATE CUMULATIVE
- 11. Hours In Reporting Period 745 7296 204577
- 12. Number ef Hours Reactor Was Critical 223.4 6234.9 165610.6
- 13. Reactoi Reserve Shutdown Hours 0.0 0.0 940.7
- 14. Hours Generator On-Line 174.7 6148.0 162748.7
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 272496 9962158 251226938
- 17. Gross Electrical Energy Generated (MWH) 91571 3351334 84905997
- 18. Net Electrical Energy Generated (MWH) 85518 3206735 81225528 l
- 19. Unit Service Factor 23.5%
84.3%
79.6%
- 20. Unit Availability Factor 23.5%
84.3%
79.6%
- 21. Unit Capacity Factor (Using MDC Net) 21.4%
82.0%
74.1%
- 22. Unit Capacity Factor (Using DER Net) 21.0%
80.6%
72.8%
- 23. Unit Forced Outage Rate 0.0%
3.1%
3.6%
- 24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)
_None
- 25. If Shut Down At End Of Report Period, Estimated Date Of Startup:N/A
- 26. Units In Test Status (Prior to Commercial Operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
]DR412220132 941213 ADOCK 0500o263 p
PnR
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-263
-UNIT Monticello-DATE 11-1-94 COMPLETED BY H. H.
Paustian i
TELEPHONE 612/295-5151 MONTH OF October f
DAY.
AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1
-2.
17
-5.
2
-3.
18
-3.
i 3
-2.
19
-4.
4
-3.
20
-9.
l 5
-4.
21
-5.
6
-3.
22
-8.
7
-3.
23
-11.
8
-3.
24 12.
l 9
-3.
25 296.
t f
10
-3.
26 552.
l 11
-2.
27 554.
12
-3.
28 557.
i 13
-3.
29 556.
14
-3.
30 556.
t 15
-7.
31 554.
16
-5.
1 INSTRUCTIONS i
on this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
[ NIT SIRTID0VNS AND POVER REDUCTIONS DOCITT Ho. 50-263
(.
INIT NAME Nonticello DATE ~11-01-94 REPORT H0tml October COMPLETED BY il. H. Paustian TELEPHONE 612/295-5151 7 tio.
Date Ty(peDeration Reason Method LER System Comp.
Cause & Corrective 1)
(hours)
(2) of No.
Code Code Action to Shutdovn (4)
(5)
Prevent Recurrence (3) 6 10-01-94 S
570.3 C
1 N/A Plant shutdown for 1994 (EOC16) refueling outage.
t 1
2 F: Forced Reason:
3 4
Hethod:
S: Scheduled A-Equipment Failure (Explain) 1-Manual Draft IEEE Standard B-Haintenance or Test C-Refueling 2-Manual Scram 805-1984(P805-DS)
D-Regulator Restriction 3-Automatic Scram 5
E-Operator Training & License Examination 4-Other (Explain)
IEEE Standard 803A-1983 F-Administrative G-Operational Error (Explain)
Il-Other (Explain)
- - - - - - - - - - - ~ - - - -