I Curnn.Es H. Caust Baltimore Gas and Electric Company s
Plant GeneralManager Calvert Clifs Nuclear Power Plant Calvert Cl#s Nuclear Power Plant 1650 Calvert Cl#s Parkway L.asby. Maryland 206 7 5
410 $86-2200 Ext. 4101 Excal 410 260 4101 Baltimore December 15,1994 U. S. Nuclear Regulatory Commission Washington. DC 20555 ATTENTION:
Document Control Desk
SUBJECT:
Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 November 1994 Operating Data Reports The subject reports are being sent to you as required by Technical Specification 6.9.1.6.
Should you have any questions, please contact Mr. Bruce Mrowca at (410) 260-3989.
Very truly yours,
/
. /jgtg //
/hMV CllC/FP/bjd Attachments cc:
D. A. Brune, Esquire J. E. Silberg, Esquire L. B. Marsh, NRC D. G. Mcdonald, Jr., NRC T. T. Martin, NRC P. R. Wilson, NRC R. A. Ilartfield, NRC l
R. I. McLean, DNR J.11. Walter, PSC P. Lewis, INPO K. Larson, ANI 9412210125 941130 3
j 'l PDR ADOCK 05000317 m
R PDn 1
g hb 2 fY YNdC I
l l
I occ*************************************************************************
UNIT l' OPERATING DATA REPORT coo *************************************************************************
Docket No. 50-317 December 15, 1994 Prepared by Frank Piazza Telephone:(410)260-3821 OPERATING STATUS
- 1. UNIT NhME Calvert Cliffs Unit 1
- 2. REPORTING PERIOD NOVEMBER 1994 3.
LICENSED THERMAL POWER (MWT) 2700
- 4. NAMEPLATE RATING (GROSS MWe) 918
- 5. DESIGN ELECTRICAL RATING (NET MWe) 845
- 6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 865
- 7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 835 8.
CHANGE IN CAPACITY RATINGS NONE
- 9. POWER LEVEL TO WHICH RESTRICTED N/A
- 10. REASONS FOR RESTRICTIONS N/A Ynar-Cumulative This month to-Date to Date
- 11. HOURS IN REPORTING PERIOD 720 8,016 171,517
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 5,167.7 122,136.7
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 3,019.4
- 14. HOURS GENERATOR ON LINE 720.0 4,914.1 119,492.5
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,937,868 12,846,903 303,161,722
- 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 645,255 4,226,113 100,699,659
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 619,677 4,045,493 95,849,775
- 19. UNIT SERVICE FACTOR 100.0 61.3 69.7
- 20. UNIT AVAILABILITY FACTOR 100.0 61.3 69.7
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 103.1 60.6 67.7
- 22. UNIT CAPACITY FACTOR (USING DER NET) 101.9 59.7 66.1
- 23. UNIT FORCED OUTAGE RATE 0.0 12.7 8.9
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):
N/A
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:
N/A
UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-317 '
UNrrNAME Calvert Onffs-U1 '
DATE December 15.1994 COMPLEIED BY Frank Piazza TELEPHONE (4101 260-3821 REPORTMONTII Novensber1994 MEUIOD OF S1IUITING LICENSEE CAUSE& CORRECTIVE DURATION DOWN EVENT SYFIEM COMPONENT ACDONTO (IIOURS)
REASON 2 REACIOR3 REPORT
- CODE 4 CODE 5 PREVENTRECURRENCE NO.
DATE TYPEI l
There were no sigmficant power reductions for this month.
i
)
1 F: Forced 2 Reason-3 Method:
4 IEEE Standard 805-1984 S: Scheduled A-Equipment Failure 1 - Manual B - Maintenance or Test 2-Manual Scram.
C-Refueling 3 - Automatic Scram.
5 IEEE Standard 803A-1983 D-Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Reduced Imd F-Administrative 9 - Other G - Operational Error H - Other
f t '
AVERAGE DAILY UNIT POWER LEVEL oe**********************************************************************
Docket No. 50-317 Calvert Cliffs Unit No. 1 December 15, 1994 Prepared by Frank Piazza Telephone: (410) 260-3821 NOVEMBER 1994 Average Daily Power Level Average Daily Power Level Day (MWe-Net)
Day (MWe-Net) 1 856 17 863 2
858 18 863 3
858 19 844 4
858 20 851 5
859 21 852 6
860 22 864 7
861 23 865 8
861 24 865 9
860 25 865 10 861 26 865 11 862 27 865 12 862 28 866 13 861 29 866 14 861 30 832 15 861 16 861
9 1
DOCKETNO.50 317
' CALVERT CLIFFS - UNIT 1 December 15,1994
SUMMARY
OF OPERATING EXPERIENCE November 1994 The unit began the month at 100% reactor power. On 11/1994 at 0210 power was reduced to %%
for waterbox cleaning and amertap adjustments. Power was returned to 100% power (860 MWe) at
}
1205 on 11/19/94 and continued operating at 100% through the end of the month.
l
)
I I
I l
1 i
l
December 8,1994 NFM 94-345 Page 2 of 3 REFUELING INFORMATION REOUEST-1.
Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No.1.
2.
Scheduled date for next refueling shutdown: March,1996.
3.
Scheduled date for restart following refueling: May,1996.
4.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Yes.
a.
License amendment to reflect the new electrical distribution system configuration.'
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
April 1995*
6.
Important licensing considerations associated with the refueling.
Physical modifications required to bring Calvert Cliffs in compliance with the Station Blackout rule will be completed in the 1996 Unit I refueling outage.
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
(a) 217 (b) 1394 (Note 2)
Spent fuel pools are common to Units 1 and 2.
8.
(a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
(a) 4710 (Note 1)
(b)0 9.
The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load.
March 2007 NOTE 1:
4710 total licensed site storage capacity.
(1830 pool + 2880 ISFSI)
NOTE 2:
192 Spent Fuel Assemblies in the ISFSI.
Entry has changed since last reported.
m
oc********it*****************************************************************
UNIT 2 OPERATING DATA REPORT co**************************************************************************
Docket No. 50-318 December 15, 1994 Prepared by Frank Piazza Telephone:(410)260-3821 OPERATING STATUS
- 1. UNIT NAME Calvert Cliffs Unit 2
- 2. REPORTING PERIOD NOVEMBER 1994 3.
LICENSED THERMAL POWER (MWT) 2700
- 4. NAMEPLATE RATING (GROSS MWe) 911
- 5. DESIGN ELECTRICAL RATING (NET MWe) 845
- 6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 870 7.
MAXIMUM DEPENDABLE CAP'Y (NET MWe) 840 8.
CHANGE IN CAPACITY RATINGS NONE 9.
POWER LEVEL TO WHICH RESTRICTED N/A
- 10. REASONS FOR RESTRICTIONS N/A Year-Cumulative This month to-Date to Date
- 11. HOURS IN REPORTING PERIOD 720 8,016 154,872
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 616.2 7,256.2 113,293.0
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1,296.6
- 14. HOURS GENERATOR ON LINE 599.1 7,183.1 111,706.7
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,574,473 18,630,746 285,496,289
- 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 531,121 6,187,937 94,343,806
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 510,129 5,932,953 90,176,087
- 19. UNIT SERVICE FACTOR 83.2 89.6 72.1
- 20. UNIT AVAILABILITY FACTOR 83.2 89.6 72.1
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 84.3 88.6 70.5
- 22. UNIT CAPACITY FACTOR (USING DER NET) 83.8 87.6 68.9
- 23. UNIT FORCED OUTAGE RATE 16.8 8.7 59
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):
March 17,1995
- 25. IF UNIT IS SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:
N/A
UNITSHUTDOWNS AND POWER REDUCTIONS DOCKETNO.
50 318 UNITNAME Calvert NU2 DATE December 15.19M COMPLETED BY Frank Piazza TELEPHONE (410) 260 3821 REPORTMONTH Novensber1994 METHOD OF SHUTIING LICENSEE CAUSE & CORRECHVE DURATION DOWN EVENT SYSTEM COMPONENT AC110N TD NO.
DATE TYPEI (HOURS)
REASON 2 REACIUR3 REPORT #
CODE 4 CODES PREVENTRECURRENCE 94-013 941027 F
120.9 A
3 31864-006 EL IPBU Unit tripped on 10/27B4 at 2353 froma 100% reactor power due to loss of electncal load. The cause of the trip was due to a Pearsar Protection Systema (RPS) actuation froma as input signal froma the Main Generator daifercatial ground devices. The A phase transition links to the Isophase Bus Doct had failed.
These links were replaced and the unit was again paralleled to the grid on 11AiS4 at 005L 3 Method-4 TFFF Standard 805-1984 1 F: Forced 2 Reason-S: Scheduled A-Equipment Failure 1 - Manual B-Maintenance orTest 2 - Manual Scram.
C-Refueling 3 - AutomaticScram.
5 IEEE Standard 803A-1983 D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Reduced Ioad F-Administrative 9 - Other
AVERAGE DAILY UNIT POWER LEVEL co**********************************************************************
Docket No. 50-318 Calvert Cliffs Unit No. 2 December 15,1994 Prepared by Frank Piazza Telephone: (A'0) 260-3821 NOVEMBER 1994 Average Daily Power Level Average Daily Power Level Day (MWe-Net)
Day (MWe-Net) 1 0
17 869 2
0 18 868 3
0 19 844 4
0 20 847 5
0 21 868 6
474 22 868 7
863 23 868 8
867 24 868 9
868 25 868 10 867 26 868 11 868 27 869 12 868 28 868 13 868 29 869 14 868 30 834 15 867 16 867 1
l 1
DOCKETNO.50 318
'CALVERT CLIFFS - UNIT 2 December 15,1994 H
SUMMARY
OFOPERATING EXPERIENCE November 1994
(
The unit began the month shutdown in mode 3 due to a reactor trip which occurred 10/2794 for a loss of electricalload. De cause of the trip was due to a failure of the A phase transition links to the Isophase Bus Duct. The links were replaced and the unit was again paral eled to the grid at 0051 on 11/6/94. Power was slowly escalated at the request of the dispatcher due to low demand on the grid.
Power was returned to 10C% at 0200 on 11/7N4.
l.
1 On 11/1894 at 2315 power was reduced for Temperature Coefficient testing. Reactor power was reduced to %.6% for the testing. De power was again returned to 100% at 2140 on 11/20N4 and l
remained there through the end of the month.
l
i
~
Doomnber 3,1994
'NFM 94-345 Page 3 o(3 REFUELING INFORMATION REOUEST l
1.
Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2 2.
Scheduled date for next refueling shutdown March 17,1995.*
3.
Scheduled date for restart following refueling: May 201995.*
4.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
l i
Yes.a a.
Revision of the Design Features section to adopt Improved Standard Technical Specifications format.
b.
License amendment to extend allowed out of service times for control room HVAC and emergency diesel generator to support Station Blackout modifications.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
s.
Submitted December 8,1993 b.
Submitted September 23,1994*
6.
Important licensing considerations associated with the refueling.
i I
An esemption from 10 CFR 50.46,10 CFR 50.44, and Appendis K to 10 CFR 50 is required to load four lead fuel assemblies. The exemption was submitted November 1,1994.a l
7.
The number of fuel assemblics (a) in the core and (b) in the spent fuel storage pool.
I (a) 217 (b) 1394 (Note 2) j Spent fuel pools are common to Units 1 and 2.
8.
(a) 'lhe present licensed spent fuel pool storage capacity, and (b) the size of any increase in i
licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
(a) 4710 (Note 1)
(b)0 9.
- lhe projected date of the last refbcling that can be discharged to the Spent Fuel Pool assuming the l
present licensed capacity and maintaining space for one full core off-load.
March 2007 NOTE 1:
4710 total licensed site storage capacity.
l (1830 pool + 2880 ISFSI)
NOTE 2:
192 Spent Fuel Assemblies in the ISFSI.
Entry has changed since last reported.
a
~-
...