Text
F
. Southem Nuclear Oper: ting 0:mpany P:st Offico Box 1295 Birmingh m, Altbama 35201 Telephone (205) 868 5131 Southern Nudear Operating Company oe. uor.y Vice President Farfey Project the Southem electHC System Decenber 13, 1994 Docket Nos.
50-348 50-364 U. S. Nuclear Regulatory Commission ATrN: Dowment Control Desk Washington, D.C. 20555 Joseph M. Farley Nuclear Plant Monthly Occrating Data Recoil Gentlemen:
l Attached are the November 1994 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.
If you have any questions, please advisc.
Respectfully submitted, h hlq[ Dave Morey RWC:jgp(mor) Attachments cc: Mr. S. D. Ebncter Mr. B. L. Siegel Mr. T. M. Ross 9412200087 941130 ~ /IY I PDR ADOCK 05000348 QC i R PDR
Joseph M. Farley Nuclear Plant Unit 1 Narrative Summary of Operations - November 1994 There were no unit shutdowns or major power reductions during the month. There was no major safety related maintenance performed during the month.
50-348 OPERATING DATA REPORT DOCKET NO. December 5,1994 f'. DATE R. D. Hill /, COMPLETED BY Mll / TELEPilONE j / l I
- 1) Cumulative data sincel2-01-77, Notes OPERATING _ STATUS Joseph M. Farley Unit 1 November 1994 date of commercial operation.
Unit Name: 2,652 1. Reporting Period: 860 LicensedThermal Power (MWt): 2. 829 Nameplate Rating (Gross MWe): 3. 855.7 Design Electrical Rating (Net MWe): 4. Maximum Dependable Capacity (Gross MWe): Number 3 Thro 812 5. Maximum Dependable Capacity (Net MWe): 6. If Changes Occur in Capacity Ratings (Items N/A 7. 8. Last Report,Give Reasons: N/A N MWe): N/A Power Level To Which Restricted,if Any ( et
- 10. Reasons For Restrictions,If Any:
9. Cumulative Yr.to Date This Month 149,016.0 118,512.8 720.0 6,848.9 3,650.0 720.0 0.0 116,709.9 j
- 11. Iloursin Reporting Period 12. Number Of Ilours Reactor W 0.0 6,803.3 0.0 j
720.0 0.0 { _ 300,16_2,997_.4_/
- 13. Reactor Reserve Shutdownllours 0.0 M,670,592.2 96,763,748.0 17
- 14. llours Generator On line 1,909,440.0 91,381,868.0 l
- 15. Unit Reserve Shutdown llours 5,441,714.0 78.3
[ I 626,942.0
- 16. Gross Thermal Energy Generated (MWI )
il) 596,054.0 84.9 78.3 l
- 17. Gross Electrical Energy Generated (MW18. Ne 100.0 84.9 75.3 l 100.0 83.6 74.0 /
- 19. Unit Service Factor 102.0 81.9 6.0 /
- 20. Unit Availabilty Factor 99.9 0.0
/
- 21. Unit Capacity Factor (Using MDC Net) 0.0
/
- 22. Unit Capacity Factor (Using DER Net) h (Type, Date, and Dur
- 23. Unit Forced Outage Rate 24. Shutdowns Scheduled Over N
_/' N/A Achieved N/A E i ated Date of Startup: Forecast
- 25. If Shut Down at End Of Report Period, st m l Operation):
08/09/77
- 26. Units In Test Status (Prior To Commercia 08/06/77 08/18/77 08/20/77 12/01/77 l
Initial Criticality 12/01/77 l initialElectricity i Commercial Operation
OPERATING DATA REPORT DOCKET NO. 50-348 DATE December 5,1994 COMPLETED BY R. D. Ilill TELEPIIONE (205) 899-5156 OPERATJNG_ STATUS 1. Unit Name: Joseph M. Farley - Unit 1 Notes 2. Reporting Period: November 1994
- 1) Cumulative data sincel2-01-77, 3.
Licensed Thermal Power (MWt): 2,652 date of commercial operation. 4. Nameplate Rating (Gross MWe): 860 5. Design Electrical Rating (Net MWe): 829 6. Maximum Dependable Capacity (Gross MWe): 855.7 7. Maximum Dependable Capacity (Net MWe): 812 8. If Changes occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A 9. Power Level To Which Restricted, If Any (Net MWe): N/A
- 10. Reasons For Restrictions,if Any:
N/A This Month Yr.to Date Cumulative
- 11. Ilours in Reporting Period 720.0 8,016.0 149,016.0
- 12. Number OfIlours Reactor Was Critical 720.0 6,848.9 118,512.8
- 13. Reactor Reserve Shutdown Ilours 0.0 0.0 3,650.0
- 14. Ilours Generator On-line 720.0 6,803.3 116,709.9
- 15. Unit Reserve Shutdown llours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1,909,440.0 17,670,592.2 300,162,997.4
- 17. Gross Electrical Energy Generated (MWII) 626,942.0 5,748,702.0 96,763,748 1
- 18. Net Electrical Energy Generated (MWil) 596,054.0 5,441,714.0 91,381,868A
- 19. Unit Service Factor 100.0 84.9 78.3
- 20. Unit Availabilty Factor 100.0 84.9 78.3 102.0 83.6 75.3
- 21. Unit Capacity Factor (Using MDC Net) 99.9 81.9 74.0
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 0.0 0.0 6.0
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A
- 25. If Shut Down at End Of Report Period, Estimated Date of Startup:
N/A
- 26. Units in Test Status (Prior To Commercial Operation):
Forecast Achieved initial Criticality 08/06/77 08/09/77 luitial Electricity 08/20/77 08/18/77 Commercial Operation 12/01/77 12/01/77 l
x DOCKET No. 50-348 UNIT 1 DATE December 5,1994 COMPLETED BY R. D.11i11 TELEPHONE (205) 899-5156 MONTil November ' DAY AVERAGE DAILY POWER LEVEL ' DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 828 17 829 2 833 18 828 3 831 19 827 4 826 20 828 t 5 824 21 823 6 824 22 829 7 827 23 833 825 24 834 l 8_ 9 824 25 834 10 822 26 829 r 11 830 27 324 12 830 28 827 13 828 29 829 14 827 30 832 15 827 31 N/A 16 826 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net fbr each day in the reporting period. Compute to the nearest whole megawatt.
UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-348 UNIT NAME J. hl. Farley - Unit 1 DATE December 5,1994 CONIPLETED BY R. D. Ilill REPORT MONTil November DELEPIIONE (205) 899-5156 w=_. ll htETilOD OF LICINSEE CAUSE AND CORRECTIVE DURATION SIIUTTING EVENT SYSint CO\\tPONENT ACTION TO n !!JO. DATE TYPE (1) IlOURS REASON (2) DOWN REACTOR (3). REPORTS CODE (4) CODE (5) PREVENT RECURRENCE kThere were no Shutdowns or power reductions during the month. h I lj i i t I: 2. 3: 4: 5: F: Forced Reason N1cthod Exhibit G-Instructions for Exhibit I - Same Source S: Scheduled A - Equipment Failure (Explain) 1 - hianual Preparations of Date Entry 3 - hiaintenana or Test 2 - hianual Scram Sheets for Licensee Esent C - Refueling 3 - Automatic Scram Report (LER) File (NUREG-016I) D - Regulatory Restriction 4 - Other (Explain) E - Operator Training & License Examination F - Administrative G - Operational Error (Exp;ain) II-Other (Explain)
E Joseph M. Farley Nuclear Plant Unit 2 Narrative Summary ofOperations November 1994 There were no unit shutdowns during the month. At 1630 on 11/15/94, the Unit was ramped down to 80 percent reactor power to investigate control circuitry for the 2A condensate pump motor, which failed to restart during check valve testing. The 2A condensate pump was returned to service and the unit was returned to 100 percent reactor power at 0130 on i1/16/94. There was no major safety related maintenance performed during the month. l
OPERATING DATA REPORT DOCKET NO. 50-364 DATE December 5,1994 COMPLETED HY R. D. Ilill TELEPIIONE (205) 899-5156 l i OPERATING STATUS 1. Unit flame: Joseph M. Farley - Unit 2 Notes 2. Reporting Period: November 1994
- 1) Cumulative data since 07-30-81, 3.
Licensed Thermal Power (MWt): 2,652 date of commercial operation. 4. Nameplate Rating (Gross MWe): 860 5. Design Electrical Rating (Net MWe): 829 6. Maximum Dependable Capacity (Gross MWe): 863.6 7. Maximum Dependable Capacity (Net MWe): 822 8. If Charges Occur in Capacity Ratings (ltems Number 3 Through 7) Sinc <: Last Report, Give Reasons: N/A 9. ~ Power Level To Which Restricted, If Any (Net MWe): N/A
- 10. Reasons For Restrictions,if Any:
N/A This Month Yr.to Date Cumulative
- 11. Ifours in Reporting Period 720.0 8,016.0 116,929.0 12.14 umber OfIfours Reactor Was Critical 720.0 8,002.0 100,955.7 l
- 13. Reactor Reserve Shutdown llours 0.0 0.0 138.0 j
- 14. Ilours Generator On-line 720.0
~~ ~7,984.8 99,546.6
- 15. Unit Reserve Shutdown llours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWil) 1,905,342.7
, _, 21,094 765.8 254,630,118.6
- 17. Gross Electrical Energy Generated (MWil) 630,463.0
- 18. Net Electrical Energy Generated (MWII) 601,187.0
_, 6,94'.,268.0 83,491,729.0
- 19. Unit Service Factor 100.0
_, 6,6;4,524.0 79,189,613.0 99.6 85 1
- 20. Unit Availabilty Factor 100.0 99.6 85.1
- 21. Unit Capacity Factor (Using MDC Net) 101.6 100.4 82.6 1
- 22. Unit Capacity Factor (Using DER Net) 100.7 99.5 81.7
- 23. Unit Forced Outage Rate 0.0 0.4 3.9
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling /Liaintencnce outage, March 10,1995. Approxi nately 39 days.
- 25. If Shut Down at End Of Report Period, Estimated Date of Startup:
N/A ~
- 26. Units in hst Status (Prior To Commercial Operation):
Forecast Achieved initial Criticality 05/06/81 05/08/81 Initial Electricity 05/24/81 05/25/81 Commercial Operation 08/01/81 07/30/81 i I
~. .( ~ 1 3 DOCKET NO. 50-364 I UNIT 2 DATE December 5,1994 COMPLETED BY R. D.11111 TELEPHONE (205) 899-5156 ' MONTli < November i DAY' AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) f 1 838 17 838 2 843 18 834 3 841 19 836 c 4 829 20 837 5 824 21 832 i 6 835 22 840 7 836 23 844 8 832 24 847 9 830 25 846 r 10 829 26 839 l i 11 839 27 832 a 12 839 28 836 13 837 29 839 i 14 835 30 844 i 15 797 31 N/A i 16 831 t INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawr.tt. l
UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-364 UNIT NAS1E J. hl. Farley - Unit 2 DATE December 5,1994 CON 1PLETED BY R. D. Ilill REPORT N10NTil Novemher TELEPIIONE (205) 899-5156 ~_ 51ETilOD OF LICENSEE CAUSE ANDCORRECTIVE l I; DURATION SIIUTTING EVENT SYSTE%t CONtPONENT ACT10N TO EDDE ( t) CODE (5) PRETTNT RECURRENCE } llJO DATE TYFI. (1) ~iK3RS, REASON (2),DOWN REACTOR (& REPORT 8 -SD P At 1630 on 11/15/94, the Unit was ramped down to 80 percent 003 11/15/94 F 9.0 B N/A N/A i reactor power to investigate control circuitry for the 2A f,[ condensate pump motor, which failed to restart during check valv f testing. The 2A condensate pump was returned to sen-ice and the [ unit was returned to 100 percent reactor power at 0130 on 11/1634. k 4 d i: I l p I: 2: 3: 4: 5: F: Forced Reason hiethod Exhibit G-Instructions fer Exhibit I-Same Source S: Schedu!cd A - Equipment hilure (Explain) 1 - hianual Preparations of Date Entry B - Afaintenance or Test 2 - 51anual Scram Sheets for Licensee Event C - Refueling 3 - Automatic Scram Report (LER) File (NUREG-0161) D - Regulatory Restriction 4 -(hher (Explain) E -Operator Training & License Examination F-Administrative G -Operational Error (Explain) 11-Other (Explain) - -}}