ML20078P043

From kanterella
Jump to navigation Jump to search
Forwards Revised 830228 Semiannual Radioactive Effluent Release Rept,1982. Rev Corrects Error in Table 8-CA Re Cumulative Joint Frequency Distribution.Error Caused by Computer Software Problem
ML20078P043
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 03/15/1983
From: Clayton F
ALABAMA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20078P046 List:
References
NUDOCS 8311030177
Download: ML20078P043 (1)


Text

. [

Malling Address A11DIma Powc' Oompany J

600 Nerth 18t5 Street

  • Post Office Dox 2641 Birminghern, Alabama 35291 A

e Telephone 205 783-6081 F. L. Clayton, Jr.

Sanior Vice President g3h3g3 %grgf flintridge Building the southern electrc system March 15, 1983 DocketNo.50-348/b Docket No. 50-364 cc Mr. James P. O'Reilly j

$c Regional Administrator 5::

,,if hi5 U. S. Nuclear Regulatory Commission

-~

co

i o 101 Marietta Street, N.W., Suite 3100 Atlanta, GA 30303 t' m 2
>

c, m O@

Re:

Joseph M. Farley Nuclear Plant Radioactive Effluent Release Report d

Dear Mr. O'Reilly:

A revision is enclosed to the Joseph M. Farley Nuclear Plant Semi-Annual Radioactive Effluent Release Report.for the second half of 1982 which was submitted in accordance with the Unit 1 and Unit 2 Technical Specifications, Section 6.9.1.8. on February 28, 1983. The enclosure replaces Table 8-CA, Cumulative Joint Frequency Distribution, Farley Nuclear Plant - Annual,1982, in the subject report. The previously submitted table was in error due to a computer software problem.

Yours very truly, s >

4Ld d

F. U. Clayton, Jr.

/

I FLCJr/KWM:nac Enclosure xc: Director, Office of Nuclear Reactor Regulation

/

Director, Office of Inspection 5

and Enforcement

[ [/

Mr. R. A. Thomas I

LigGI Mr. G. F. Trowbridge Mr. W. H. Bradford 8g

[ pf Mr. E. A. Reeves File /G-12 8311030177 830315 Q-N PDR ADOCK 05000348 PDR{

. OFFICIAL COPY R