Forwards Info Re Seismic & Dynamic Qualification Test Program,Per FSAR Commitment.Seismic & Environ Test Schedule for non-NSSS Supplied Components Summarized
ML20078M517
Person / Time
Site: Hope Creek 
Issue date: 10/05/1983
From: Mittl R
Public Service Enterprise Group
To: Schwencer A
Office of Nuclear Reactor Regulation
References
NUDOCS 8310250215
Download: ML20078M517 (23)


Text

4 i

Pubhc Service Electrtand Gas (Mmmny 80 Park Plaza, Newark, NJ 07101/ 201430-8217 MAILING ADDRESS / P.O. Box 570, Newark, NJ 07101 Robert L. Mitt! General Manager Nuclear Assurance and begulation October 5, 1983 Director of Nuclear Reactor Regulation Unites States Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, MD 20014 Attention:

Mr. Albert Schwencer, Chief Licensing Branch 2 Division of Licensing Gentlemen:

HOPE CREEK GENERATING STATION DOCKET NO. 50-354 FINAL SAFETY ANALYSIS REPORT EQUIPMENT QUALIFICATION Pursuant to Final Safety Analysis Report commitment con-tained in the Supplemental Requests Appendix Item (5) -

Equipment Qualification, to provide information on the seis-mic and dynamic qualification test program; enclosed is a summary of the seismic and environmental test schedule for Non-NSSS supplied components.

This test schedule includes iteras being tested, vendor and testing laboratory involved, date and location of the test, the description of the pro-gram, and the status of the qualification program.

A similar schedule for NSSS supplied components will be sub-mitted in January 1984.

Information concerning qualification programs which have been completed is not included in this test schedule.

Please note that some of the information concerning test i

location and dates is not available at this time and will be provided when the information is known.

Should you have any questions in this regard, do not hesi-tate to contact us.

Very truly yours, i

a kf 0$o000$4 O

I PDR Q

8 I

I Encl.

The Energy Peopk) 944312 {4M) 7 83

. ~ ------.

P r

Director-of. 10/5/83 l-Nuclear.' Reactor Regulation 1

I,.

~ CC:

D.-H.' Wagner - w/ encl.

USNRC Licensing Project Manager t

b 8

f v

i -

e BQ8 1-2 f

f 4

L

..-___......c-..__.._.._,,_._.__....-.;___...

Aus 31 '830 2 4 9 2 8 0 gy, y.,. _,

SEISMIC QUALIFICATION TEST SCIIEDULE ELECTRICAL S!!EET 1 OF 18 P.O.

DESCRIPTION ITEMS BEING VENDOR OR TESTING PTION LO TO F

REMARKS NO.

OF P.O.

TESTED LABORATORY TIIE TEST POUR FRAME LINE E-109 (Q)

SK.V.

BROWN BOVERI/WYLE Test S K-350 performed SWITCilGEAR completed SWITCllGEAR Type test and analysis Test E-112A(Q)

MOTOR WESTINGIIOUSE SACS MOTORS were performed comple ted ERM CAL Type test and analysis Test E-ll2B (Q)

INDUCTION MOTOR G.E.

were performed comple ted MOTORS

,E-ll7 (Q)

LOAD CENTERS TRAt1 bRMER&

Seis& tests were Ten LOAD CENTER G.E./WYLE performed comple ted Test lst QUARTER AGED DEVICES OF 1984 Seismic tests will be procedure WILL BE

E-118 (Q) 480V.

CUTTLER llAMMER performed in accordance will be INSTALLED IN M.C.C.

the end of['83 Tile M.C.C.

LATER ENCLOSURE lst QUARTER Test D.C.

OF 1984 Seismic tests will be procedure E-120 (Q)

DISTRIBUTION PANEL GOULD Performed in accordance will be PANELS with IEEE 344-1975 submitted by Sept. 1983 I

Aus 31 '830 2 4 9 2 8 0

' SEISMIC QUALIFICATION TEST SCIIEDULE ELECT"ICAL SilEET 2 OF 18 4

P.O.

DESCRIPTION ITEMS BEING VENDOR OR TESTING PTION LOC T ON F

REMARKS NO.

OF P.O.

TESTED LABORATORY

^

Tile TEST D.C.

Seismic tests were E-121 (Q)

SWITCilGEAR SWITCIIGEAR G.E./WYLE performed in accordance Test M.C.C.

M.C.C.

with IEEE 344-1975 completed 2nd QUARTER Panel box is analyzed.

Testing is P"

E-122 (Q)

RELAYS PANELS LATER COMSIP/ACTON b

t t

f en he seco d j

prequalified by the quarter of j

manufacturer 1984 i

SK.V.

No seismic I E-129 (Q)

POWER test require CABLES j

ELECTRICAL PENETRATION Generic seismic tests Test E-135 (Q)

NESTINGliOUSE/ACTON PENETRATIONS ASSEMBLY were performed completed Test DRY TYPE lst QUARTER TRANSFORMER OF 1984 Seismic tests will be procedure TRANSFORMERS i E-139 (Q)

PANEL GOULD performed in accordance will be

& DIST

~

PANELS LATER Sept. 1983

^

BAfE 6

latteried were tested.

CEL used disconnect t E-150 (Q)

BATTERIES FUSE Test l

/

N1 ches were tested and DISCONNECT completed SWITCli Y**

i

AUG 31. *83 0 2 4 9 2 8 0 4

)

SEISMIC QUALIFICATION TEST SCllEr 2E l

ELECTRICAL SIIEET 3 OF 18 P.O.

DESCRIPTION ITEMS BEING VENDOR OR TESTING PTION LO TC F

REMARKS NO.

OF P.O.

TESTED LABORATORY Tile '

ST D STATE BATTERY ieismic tests were Test iE-151 (Q)

BATTERY C&D/ACTON CIIARGERS

>erformed completed CIIARGERS NSTRUMENT ual W ca por E-153A(Q)

See remarks PANELS by analysis i

1 1

l BREAKERS, FUSE, NSTRUMENT

' E-15 3B (Q)

PUSE BLOCKb, &

Pesting and analysis rest ANEM ECS/NTS acre performed ompleted l

PERMINAL BLOCK i

t i

Seismic test "T

lE-154 (Q)

STATIC END OF 1983 will be performed in Test plan it C* S UNINTERRUPTIBLE CYBEREX/WYLE IlUNTSVILLE accordance with IEEE under redek l

POWER SUPPLY (ALA) 344-1975 l

600V d-157 (Q)

CONTROL 90 seismic CABLE S test require (

i 600V

E-158 (0)

POWER No seismic j

CABLES test require (

i j

as 31 'a30 2 4 9 2 80 '

SEISMIC QUALIFICATION TEST SCilEDULE ELECTRICAL SHEET 4 OF 16 4

DATE AND P.O.

DESCRIPTION ITEMS BEING VENDOR OR TESTING DESCRIPTION NO.

OF P.O.

TESTED LABORATORY OF THE PROGRAM g

i i

)

io seismic jE-170 (Q)

CO-AXIAL &

test required TRIAXIAL CABLES i

i SIIIELDED 90 seismic

!E-171 (Q)

INSTRUMENT test requirei

{

CABLES I

}

{

)

i i

l t

m at '830 2 4 9 2 8 0 1

SEISMIC QUALIFICATION TEST SC11EDULE CONTROL SYSTEMS SIIEET 5 OF 18 P.O.

DESCRIPTION ITEMS BEINC VENDOR OR TESTING REMARKS LO TO F

NO.

OF P.O.

TESTED LABORATORY TIIE TEST Analysis was performed qua e con Wol BAILEY ONE SECTION jJ-200 (Q)

CONTROL OF V3RTICAL BAILEY /WYLE e

ly on o e.

o leted PANELS BOARD & CONSOLE Analysis was performed i

usina testina results.

Test sched.

12 packages are already

  1. U"^

1 BOARD generically qualified.

LATER pa kage will

,J-200 (Q)

COMPONENTS Remaining will be be available l

(62 Packages) seismically tested or by Sept. 198.

analyzed.

1 Panel box is analyzed.

Tests are

^

REMOTE The panel devices will forcasted OP 1984 lJ-201 (Q)

CONTROL LATER COMSIP/ACTON be tasted, if are not for the 2nd PANELS prequalified by the quarter of i

manufacturer 1984.

i Generic seismic tests were performed in J-301 (Q)

TRANSMITTERS TRANSMITTERS WESTINGIIOUSE

.I'e s t accordance with completed 1

IEEE 344-1975 i

l Generic seismic test PANEL ANEL were performed in J-305 (Q)

MOUNTED INSTRUMENTS WESTINGiiOUSE accordance with Test INSTRUMENTS IEEE 344-1975 coiaple ted

)'

)

11 II ANALYZER Generic seismic tests 2

2 ENGINEERING and analysis were l J-359 (Q)

ANALYZER Test COMSIP/ ANALYSIS &

performed in accordance completed i

REMOTE CONTROI TEST Co.

with IEEE 344-1975 nAngL I,

as 31 '8302 4 9 2 80 SEISMIC QUALIFICATION TEST SCilEDULE CONTROL SYSTEMS SilEET 6 OF 18 j

P.O.

DESCRIPTION ITEMS BEING VENDOR OR TESTING LO TO F

REMARKS NO.

OF P.O.

TESTED LABORATORY THE N N THE TEST i

RADIATION DETECTORS, SEPT. 8 3 'IO Seismic tests will be Test 7

FARWER MON'TORING CONTROL PANELS 1st QUARTER Performed in accordance procedures J-371 (Q)

I TEC/ AND SYSTEMS

& DUCT OF 1984 with IEEE 344-1975 are under IIENDRICKS SAMPLING CINCINNATI review l

SECTION (OMTO) 1 J-483 (Q)

LEVEL SWITCilES Generic seismic tests FCI/WYLE Test SWITCllES were performed in completed accordance with IEEE 344-1975 P

D J-525 (Q)

A ACTION DRESSER /

Generic seismic tests G UGE p

Test were performed PRESSURE a

comple ted SWITCil i

j TilERMOCOUPLES TIIERMOCOUPLE i J-556 (Q)

Generic seismic tests WEED /NTS Test were performed l

RTD RTD completed ASSEMRT.TRS 1

s I

I

} J_601 CONTROL VALVE WITil Generic seismic tests Test (Q)

I ACCESSORIES MASONEILAN VALVES were performed.

completed j

enedc seismic tests SOLENOID DAYTON

-603 (Q)

VALVES VALVES VALCOR/T. BROWN t

J IEEE 344-1975 1

aus 31 's30 2 4 9 2 80 SEISMIC QUALIFICATION TEST SCllEDULE CONTROL SYSTEMS SIIEET 7 OF 18 P.O.

DESCRIPTION ITEMS BEING VENDOR OR TESTING ESCRIPTION LO TO F

REMARKS NO.

OF P.O.

TESTED LABORATORY Ti!E TEST BUTTERFLY VALVES &

FISHER Generic seismic tests Test I

/

YLE VALVES ACTUATORS CONTROLS were performed.

completed l

PRESSURE PRESSURE AMERICAN Seismic tests were Test

J-610 (Q)

REGULATORS REGULATORS MAROTTA/ENVIR.Co.

performed completed 2

J-703 (Q)

FLO C ECK

^

N!

est CllE ALVE e

r VALVES completed N

RUMENT Qua Med jJ-705 (Q)

VALVES NONE NONE UONE See Remarks by analysis i

1

}

enedc seismic tests SEISMIC SEISMIC

- 07 (Q)

NEMETRICS/WW.E and analysis were Test INSTRUMENTS INSTRUMENTS performed completed M

A J-730 (Q)

FLEXIBLE ene seismic tests Test IIOSE BELLOWS / AETL were performed ilOSE completed i

ASSEMBLY

u 31 'a3 0 2 4 9 2 8 0 -

SEISMIC QUALIFICATION TEST SCIIEDULE CONTROL SYSTEMS SilEET 8 OF 18 P.O.

DESCRIPTION ITEMS BEING VENDOR OR TESTING REMARKS LO T ON F

NO.

OF P.O.

TESTED LABORATORY TIIE TEST est SAFETY RELIEF p{ cedure VALVE ' POSITION (Q)

INDICATION LATER NDT/WYLE 11U ILLE itted by SYSTEM (ALA) end of 1983 TION AND LOOSE PART Generic seismic tests LOOSE PARTS J-803 (Q)

MONITORING MONITORING ROCKWELL/WYLE and analysis were Test SYSTEM CABINETS performed completed

~

EMERGENCY ANALOG AND eismic tests will be Test

RESPONSE

DIGITAL REMOTE J-818 (Q)

RO U S'

END OF 1983 1erf rmed in accordance procedure is FACILITIES UNITS COMPLETE CINCINNP.TI dith IEEE 344-1975 under review DATA ACQ.

WITII ALL CABLES (ogiro}

SYSTEM AND CARD ASSY

\\

w

aus at 'a3024 9 2 80 1

j SEISMIC QUALIFICATION TEST SCllEDULE MECllANICAL SilEET 9 OF 18 i

l P.O.

DESCRIPTION ITEMS BEING VENDOR OR TESTING ESCRI N ON LO TO F

REMARKS NO.

OF P.O.

TESTED LABORATORY TIIE TEST STAND BY eismic Mst for Hope l.

(Q)

DIESEL WYLE Creek (RRS) requirements SWITCII PANELS80-018 TERM DOXES GENERATOR completed.

I Envir & seismic test j

completed on a generic M-018 (Q)

COMPONENTS COLT basis enveloping flope i

creek. requirements.

I i.

M-018 (Q)

ENGINE, COLT Analysis I

(

' Seismic test for Hope PANELS lM-018 (Q)

LE Creek (RRS) requirements (CONTROL) completed.

4 3

'b 0

lM-020 (Q)

Analysis WATER SCREENS SEPT.26,1983 l

CONTROL Test planned as shown.

M_020 (Q)

PANEL ROYCE MIDCO LA,Ca.

AUG 31 '83 0 2 4 9 'd 6 0 SEISMIC QUALIFICATION TEST SCllEDULE MECIIANTCAL SilEET 10 OP 1 R P.O.

DESCRIPTION ITEMS BEING VENDOR OR TESTING REMARKS LO t ON F

NO.

OF P.O.

'"ES TE D LABORATORY TIIE TEST M-047 (Q)

EE Gened c test completed COMB ER M

R No seismic testing for Vendor to M-047 (Q)

SKID llope creek SKID planned qualify by similt -ity.

No seismic test planned Vendor may as yet.

Probable time qualify by M-047 (Q)

CO!NROL PANEL period is 2nd quarter similarity 1984 Vendor is in llYDROGEN POWER

"~

^(OI RECOMBINER PANEL as yet.

a new EQ ROCKWELL program.

s CONTAINMENT M-048 (Q)

INST. GAS COMPRESSOR Analysis COMPRESSOR MOUNTED

^

M-048 (Q)

SKID Test date is not IIENDRICKS S

b lII fi"#1i*"d DEVICES

AUG 31 '830 2 4 9 2 8 0 SEISMIC QUALIFICATION TEST SCIIEDULE MECHANTCAL SilEET 11 OF 18 P.O.

DESCRIPTION ITEMS BEING VENDOR OR TESTING REMARKS LO T ON P

NO.

OF P.O.

TESTED LABORATORY TIIE TEST CONTAINMENT

M-048 (Q)

INST. GAS MOTOR WESTINGIIOUSE Generic test COMPRESSOR SACS

M-069 (Q)

IIEAT Analysis EXCl!ANGES s-070 (Q)

SACS PUMPS FUEL POOL M-071 (Q)

IIEAT

~~

EXCHANGER s

SELF Gen ric report, test M-076 (Q)

CLEANING MOTOR WESTINGIIOUSE completed.

STRAINER M-076 (Q)

Analysis

as31830249280 SEISMIC QUALIFICATION TEST SCHEDULE MECllANICAL SilEET 12 OF 18 P.O.

DESCRIPTION ITEMS BEING VENDOR OR TESTING DESCRIPTION LO TO OF REMARKS NO.

OF P.O.

TESTED LABORATORY THE N G M TIIE TEST i

SERVICE

M-080 '(Q)

WATER Analysis PUMPS i

IIORIZONTAL M-082 (Q)

CENTRIFUGAL PUMPS 1

M-082 (Q)

PUMP MOTOR WESTINGilOUSE op e

i I

I DIESEL FUEL jM-092 (Q)

OIL TRANSFER (FOR T E PUMP)

PUMPS

~

1 (0)

Analysis

M-G92 i

I.

e-

}

DIESEL FUEL

' M-105 (Q)

OIL STORAGE TANKS i

I i

am at 83024 9280 SEISMIC QUALIFICATION TEST SCllEDULE MECilANICAL SilEET 13 OF 18 P.O.

DESCRIPTION ITEMS BEING VENDOR OR TESTING LO TO P

REMARKS j

NO.

OF P.O.

TESTED LABORATORY THE N G N Tile TEST 1

3 NUCLEAR Static deflection test jM-141 (Q)

SERVICE for demonstrating elsmig 9

i RELIEF VALVES

" operability'" Completed by a

s M-147 (Q)

NER l

4 I

M-150 (Q) i PRESSURE

!M-177 (Q)

RELIEF l

BLOWOUT i

PANEL

!M-707 (Q)

EXPANSION i

-707A(Q) i l

AIR

!M-711 (Q)

IIANDLING UNITS

AUG 31 '830 2 4 9 2 8 0 SEISMIC QUALIFICATION TEST SCllEDULE MECi!ANTcAL SilEET 14 OF 18 P.O.

DESCRIPTION ITEMS BEING VENDOR OR TESTING REMARKS LO T ON OF NO.

OF P.O.

TESTED LABORATORY OF Tile PROGRAM Tile TEST "T

^L M-713 (Q)

MOTORS WESTINGIIOUSE Generic test completed NS M-713 (Q)

FANS O./WYLE Test completed OR M-713 (Q)

ACTUATOR ITT/WYLE M-716 (Q)

FIRE DAMPERS FIRE DAMPERS RUSKIN/WYLE

CONTROk, Testing M-717 (Q)

DAMPERS &

Analysis & Testing completed ACTUATORS No new testing r>1 a n ne d.

VAN AXIAL M-719 Analysis FANS I

Aus at '8302 4 9 280 SEISMIC QUALIFICATION TEST SCIIEDULE MECHANICAL SHEET 15 OF 18 P.O.

DESCRIPTION ITEMS BEING VENDOR OR TESTING TION LO TO F

REMARKS NO.

OF P.O.

TESTED LABORATORY THE PROG M Tile TEST CENTRIFUGAL

!M-723 (Q)

LIQUID Analysis CHILLER BUBBLE TIGHT

'M-72S (Q)

DAMPERS i

\\

BUBBLE TIGIIT DAMPERS Generic qualification limitorque

.M-728 (Q) j CONTROL tests completed limit switch DAMPERS solenoid G

Analysis M-731 (0) fOk,ItG OIL s

"^

L"T M-733 (Q)

TECIINO. C ORP.

Test. completed RS S

CH H

NST.

)M-780 (Q)

Analysis

Ms 31 '830 2 4 9 2 8 0-

,i SEISMIC QUALIFICATION TEST SCHEDULE i

MECHANICAL SHEET 16 OF 1R P.O.

DESCRIPTION ITEMS BEING VENDOR OR TESTING ESCRIPTION j

LO AT O OF REMARKS NO.

OF P.O.

TESTED LABORATORY TIIE TEST ACTON Test plan / procedure not Panel mountei l

PIELD MOUNT COMPSIP/ACTON completed possible devices may M-780 (Q)

IIVAC INST.

INST. AND 2nd QTR 1984 testing 2nd quarter,84 be. _ -

a I

DEVICES PANEL MOUNTED j

DEVICES prequalified l

R M-786 (Q)

Analysis g

i t

AIR FILER HEAER &

A est to M scheduled

!M-786 (Q)

AAF/INDEECO/NUTilERF

[

SYSTEM CONTROL PANEL NUTHERM by Dec. 1933 i

!M-786 (Q)

AIR FILTER DUCT I! EATER AAF/NUTIIERM SYSTEM

)

I M-786 (Q)

FIRE DETECT.

AAP/ WALTER KIDDE/

ST wyle WYLE i

i 8

v i

I I-

ms31s30249280 SEISMIC QUALIFICATION TEST SCHEDULE j

' PLANT DESIGN SHEET 17 OF 18 P.O.

DESCRIPTION ITEMS BEING VENDOR OR TESTING LO O

F REMARKS l

NO.

OF P.O.

TESTED LABORATORY

~

THE TEST i

i i

lP-301 (Q)

VALVES Anal; sis k

l l

Generic test reports Limit switch VALVES are submitted for solenoids

P-301 (Q)

CONTROL various control devices conax conn ACCESS Test completed.

valve oprt i

etc.

I lP-302 (Q)

VALVES AIR ACTUA'IOR Test completed I

l I

]

~

j'-303 (Q)

VALVES LIMITORQUE Generic test report i-ACTUATOR submit.ted-Test completed l

s P-303 (Q)

VALVES PE TIC ROCKWELL/ HILLER ted report Co e 6

i ACTUATOR i,

~

i

)

HUNTSVILLE,

! -305 BUTTERFLY METRIX (Q)

WYLE ALABAMA lP Test completed VALVES ACTUATOR AUG.22-26'83

.)

I

Aus 31 '830 2 4 9 28 0

~

SEISMIC QUALIFICATION TEST SCIIEDULE PLANT DESIGN SIIEET 18 OF 18

^

^"

P.O.

DESCRIPTION ITEMS BEING VENDOR OR TESTING DESCRIPTION b

T E E RKS NO.

OF P.O.

TESTED LABORATORY OF TIIE PROGRAM TE S

Analysis for butterfly P-305 (Q)

BUTTERFLY valves VALVES e

c P

P-305 (Q)

E L'IMITORQUE g

e ACTUATOR MOWR Static deflection test 9-305 (0)

D.

I. F*

OPERATED completed VALVES e-

c;

7,,

~y

. z,,

, 3,

~

~

,;,2- ~gyrog@g,r;-es7,'f -1 a -

Aus 31 's30'2 4 928 0

~

" ~

~

- / ** /

ENV{RONMENTAL OUALIFICA'? ION;fEST'OCIIEDULE 1

f-

~'

/

', ~

  • { 's '..
  • ?

'. ~ ~

u

,t.

~J;ELECTQIChh/CgN;fROIpSYS?BMS

, 'l

(,

- /.GjlEET 1,OF 3 P.O.

DESCRIPTION ITEMS BEING

'VEN ROP,.5ShING

~

LOCAT O F-

~

REMARKS NO.

OF P.O.

TESTED

' LABORATORY THW TEST- -

MOTOR CONTROL Test will be performed E-ll8 (Q) 480V. M.C.C.

CUTTLER IIAMMER OF l9 CENTER DEVICES in accordance with EEE 323-M LATER LATER Vendor has identified DEVICES OF E-154 (Q)

UNINTERRUPTIBLE CYBEREX/WYLE

.cenain Mces Weh r

NSTRUMENT have to be aged prior A.

UN POWER SUPPLY IlUNTSVILLE to the seismic tests.

)

2nd QUARTER REMOTE Panel devices will be J-201 (Q)

CONTROL LATER COMSIP/ACTON tested in accordance PANELS with IEEE 323-1974 RADIATION Test will be performed A

s A TER J-371 (0)

MONI'IORING DETEC'IORS TEC in accordance with HENDRICKS OF M84 SYSTEM IEEE 323-1974 CINCINNATI (O!!IO) e

as 31 83 U 2 4 9280 II ENVIRONMENTAL OUALIFICATION TEST SCilEDULE MECIIANICAL SIIEET 2 OF 3

]

P.O.

DESCRIPTION ITEMS BEING VENDOR OR TESTING TIM LO TO P

REMARKS NO.

OF P.O.

TESTED LABORATORY OF THE P E M THE TEST i

hCOMB Generic test completed M-04 7A (Q)

ER ROCKWELL O

R Comp ~nents testing to sta d in 1st qua ner M-047A(Q)

SKID ROCKWELL 1984 1

No testing planned

M-047A(Q)

CONTROL PANEL Mild environment Testing to start in 1st Vendor is in quarter 1984 continuing the process

! -04 7A(Q)

M POWER PANEL R0CKWELL through 1st quarter in of developing 1985 a new EQ program s

l CONTAINMENT FARWELL IN PROGRESS SKID MOUNTED jM-048 (Q)

INSTRUMENT Aging is being done To be DEVICES GAS COMPRESS HENDRICKS SDRC,OllIO completed by COMPRESSOR Nov.1983 j

j No environmental jM-048 (Q)

COMPRESSOR testing.

Seismic 1

qualification by l

analysis, i

M-048 (Q)

MOTOR WESTINGIIOUSE Generic test completed.

AUG 31 ~83 0 2 4 9 2 8 0 ENVIRONMENTAL OUALIFICATION TEST SCHEDULE MECilANICAL/ PLANT DESIGN SilEET 3 OF 3 P.O.

DESCRIPTION ITEMS BEING VENDOR OR TESTING DESC M TION LO TO F

REMARKS NO.

OF P.O.

TESTED LABORATORY THE N G M TIIE TEST Only inst.

FIELD AND 2nd QUARTER P

1 cated in M-780A(Q)

IIVAC INST.

PANEL MOUNTED COMSIP/ACTON 1984 s

t ed in S p

'83 harsh envir.

INSTRUMENTS.

to be tested.

I M-786 (Q)

DETFCT N

AAP/KIDDE/WYLE WYLE gy c

19 SYSTEM M-786 (Q)

IIEATERS No environmental test CONTROL e scheduled by M-786 (Q)

AAF/NUTIIERM PANELS Dec. 1983 Rotork is to submit VALVES &

ROTORK

- 02/303 ROTORK LATER quotation for ACTUA'IORS ACTUATOR A

submergence test