Forwards Info Re Seismic & Dynamic Qualification Test Program,Per FSAR Commitment.Seismic & Environ Test Schedule for non-NSSS Supplied Components Summarized
ML20078M517
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 10/05/1983
From: Mittl R
Public Service Enterprise Group
To: Schwencer A
Office of Nuclear Reactor Regulation
References
NUDOCS 8310250215
Download: ML20078M517 (23)


Text

-

4 i

. Pubhc Service Electrtand Gas (Mmmny 80 Park Plaza, Newark, NJ 07101/ 201430-8217 MAILING ADDRESS / P.O. Box 570, Newark, NJ 07101 Robert L. Mitt! General Manager Nuclear Assurance and begulation October 5, 1983 Director of Nuclear Reactor Regulation Unites States Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, MD 20014 Attention: Mr. Albert Schwencer, Chief Licensing Branch 2 Division of Licensing Gentlemen:

HOPE CREEK GENERATING STATION DOCKET NO. 50-354 FINAL SAFETY ANALYSIS REPORT EQUIPMENT QUALIFICATION Pursuant to Final Safety Analysis Report commitment con-tained in the Supplemental Requests Appendix , Item (5) -

Equipment Qualification, to provide information on the seis-mic and dynamic qualification test program; enclosed is a summary of the seismic and environmental test schedule for Non-NSSS supplied components. This test schedule includes iteras being tested, vendor and testing laboratory involved, date and location of the test, the description of the pro-gram, and the status of the qualification program. A similar schedule for NSSS supplied components will be sub-mitted in January 1984.

Information concerning qualification programs which have been completed is not included in this test schedule.

Please note that some of the information concerning test i location and dates is not available at this time and will be provided when the information is known.

Should you have any questions in this regard, do not hesi-tate to contact us.

Very truly yours, i

a kf O

0$o000$4 I PDR Q 8

I I

Encl.

The Energy Peopk) 944312 {4M) 7 83

- . . . . . . . _ . _ . ~ ------.

P r

Director-of. 10/5/83  !

l- Nuclear .' Reactor Regulation 1

I ,.

~ CC: D.-H.' Wagner - w/ encl.

USNRC Licensing Project Manager  ;

t b

8 f

v i -

e

BQ8 1-2 f

f 4

L

. . _ . - _ . _ _ _ - _ . . _ _ _ ..-___......c-..__.._.._,,_._.__....-.;___...

gy, y .,. _ , Aus 31 '830 2 4 9 2 8 0 -

SEISMIC QUALIFICATION TEST SCIIEDULE ,

ELECTRICAL S!!EET 1 OF 18 P.O. DESCRIPTION ITEMS BEING VENDOR OR TESTING LO PTION REMARKS TO F NO. OF P.O. TESTED LABORATORY TIIE TEST POUR FRAME LINE E-109 (Q) SK.V. BROWN BOVERI/WYLE Test S K-350 performed completed SWITCilGEAR SWITCllGEAR

  • Type test and analysis Test E- 112A(Q) MOTOR WESTINGIIOUSE comple ted SACS MOTORS were performed ERM CAL Type test and analysis Test E-ll2B (Q) INDUCTION MOTOR G.E. were performed comple ted MOTORS

,E-ll7 (Q) LOAD CENTERS TRAt1 bRMER& Seis& tests were Ten LOAD CENTER G.E./WYLE performed comple ted lst QUARTER Test AGED DEVICES , , ,

Seismic tests will be procedure WILL BE OF 1984

E-118 (Q) 480V. CUTTLER llAMMER performed in accordance will be INSTALLED IN ,

M.C.C. '

Tile M.C.C. LATER the end of['83 ENCLOSURE lst QUARTER . . . Test D.C. OF 1984 Seismic tests will be procedure E-120 (Q) DISTRIBUTION PANEL GOULD Performed in accordance will be PANELS with IEEE 344-1975 submitted by Sept. 1983 I

Aus 31 '830 2 4 9 2 8 0 -

' SEISMIC QUALIFICATION TEST SCIIEDULE ,

ELECT"ICAL SilEET 2 OF 18 4

P.O. DESCRIPTION ITEMS BEING VENDOR OR TESTING LOC T ON F PTION REMARKS NO. OF P.O. TESTED LABORATORY " ^

Tile TEST

' D.C. Seismic tests were E-121 (Q) SWITCilGEAR SWITCIIGEAR G.E./WYLE performed in accordance Test

& M.C.C. & M.C.C. with IEEE 344-1975 completed 2nd QUARTER Panel box is analyzed. Testing is E-122 (Q) RELAYS PANELS LATER COMSIP/ACTON P"

b t t ,

f en he seco d j prequalified by the quarter of j manufacturer 1984 i SK.V. No seismic I E-129 (Q) POWER test require j CABLES ELECTRICAL PENETRATION Generic seismic tests Test E-135 (Q) PENETRATIONS ASSEMBLY NESTINGliOUSE/ACTON -

were performed completed lst QUARTER Test DRY TYPE ,

Seismic tests will be procedure TRANSFORMER OF 1984 TRANSFORMERS performed in accordance will be i E-139 (Q) & PANEL GOULD

& DIST ~

PANELS LATER Sept. 1983 6

^

latteried were tested .

BAfECEL used disconnect t E-150 (Q) BATTERIES FUSE Test l

DISCONNECT / N1 ches were tested and completed

'"" Y**

SWITCli i

AUG 31. *83 0 2 4 9 2 8 0 ,

4

) SEISMIC QUALIFICATION TEST SCllEr 2E .

l . ELECTRICAL SIIEET 3 OF 18 P.O. DESCRIPTION ITEMS BEING VENDOR OR TESTING LO PTION

, NO. OF P.O. TESTED LABORATORY TC F REMARKS Tile ' ST D STATE ieismic tests were Test BATTERY iE-151 (Q) CIIARGERS BATTERY C&D/ACTON >erformed completed CIIARGERS NSTRUMENT See remarks ual W ca por E-153A(Q) PANELS by analysis i

1 1

l BREAKERS, FUSE, NSTRUMENT PUSE BLOCKb, & Pesting and analysis

' E-15 3B (Q) rest ANEM PERMINAL BLOCK ECS/NTS acre performed ompleted l

i t

i Seismic test "T " will be performed in lE-154 (Q) C* S STATIC END OF 1983 Test plan it UNINTERRUPTIBLE CYBEREX/WYLE IlUNTSVILLE accordance with IEEE under redek POWER SUPPLY (ALA) 344-1975 l

l 600V d-157 (Q) CONTROL 90 seismic

, CABLE S test require (

i 600V

E-158 (0) POWER No seismic j CABLES test require (

i j . .

as 31 'a30 2 4 9 2 80 '

SEISMIC QUALIFICATION TEST SCilEDULE ,

ELECTRICAL SHEET 4 OF 16 4

DATE AND DESCRIPTION P.O. DESCRIPTION ITEMS BEING VENDOR OR TESTING

NO. OF P.O. TESTED LABORATORY g OF THE PROGRAM i

i

)

io seismic jE-170 (Q) CO-AXIAL & test required TRIAXIAL CABLES i

i SIIIELDED 90 seismic

!E-171 (Q) INSTRUMENT test requirei

{ CABLES I

}

{ .

)

i i '

l t

m at '830 2 4 9 2 8 0 1 -

SEISMIC QUALIFICATION TEST SC11EDULE ,

CONTROL SYSTEMS SIIEET 5 OF 18 P.O. DESCRIPTION ITEMS BEINC VENDOR OR TESTING LO TO F REMARKS NO. OF P.O. TESTED LABORATORY TIIE TEST Analysis was performed qua e con Wol

! BAILEY ONE SECTION "

jJ-200 (Q) CONTROL OF V3RTICAL BAILEY /WYLE e ly on o e. o leted PANELS BOARD & CONSOLE Analysis was performed i usina testina results.

Test sched.

12 packages are already ' #U"^ "'

1 BOARD generically qualified. pa kage will

" " LATER Remaining will be

,J-200 (Q) COMPONENTS be available l (62 Packages) seismically tested or by Sept. 198.

analyzed.

Panel box is analyzed. Tests are 1

" ^ The panel devices will forcasted REMOTE OP 1984 lJ-201 (Q) CONTROL LATER COMSIP/ACTON be tasted, if are not for the 2nd i PANELS prequalified by the quarter of manufacturer 1984.

i

! Generic seismic tests were performed in J-301 (Q) TRANSMITTERS TRANSMITTERS WESTINGIIOUSE . accordance with

.I'e s t completed 1 IEEE 344-1975 i

l '

Generic seismic test PANEL ,

ANEL were performed in J-305 (Q) MOUNTED INSTRUMENTS WESTINGiiOUSE accordance with Test

INSTRUMENTS IEEE 344-1975 coiaple ted

)'

) 11 2

II ANALYZER '

Generic seismic tests 2

ENGINEERING and analysis were l J-359 (Q) ANALYZER &

COMSIP/ ANALYSIS & performed in accordance Test completed i REMOTE CONTROI TEST Co. with IEEE 344-1975

nAngL I,

as 31 '8302 4 9 2 80 -

SEISMIC QUALIFICATION TEST SCilEDULE .

CONTROL SYSTEMS SilEET 6 OF 18 j

P.O. DESCRIPTION ITEMS BEING VENDOR OR TESTING LO TO F REMARKS NO. OF P.O. TESTED LABORATORY THE TEST THE N N i

RADIATION DETECTORS, SEPT . 8 3 'IO Seismic tests will be Test 7

FARWER J-371 (Q) MON'TORING I CONTROL PANELS TEC/ AND 1st QUARTER Performed in accordance procedures

& DUCT OF 1984 with IEEE 344-1975 are under

SYSTEMS IIENDRICKS SAMPLING CINCINNATI review l SECTION (OMTO) 1 J-483 (Q) LEVEL SWITCilES FCI/WYLE Generic seismic tests Test SWITCllES were performed in completed accordance with IEEE 344-1975 P D J-525 (Q) G UGE A ACTION DRESSER / p Generic seismic tests Test PRESSURE a were performed comple ted
SWITCil i

j TilERMOCOUPLES TIIERMOCOUPLE

& Generic seismic tests i J-556 (Q) &

RTD WEED /NTS were performed Test l RTD completed ASSEMRT.TRS 1

s I

I CONTROL VALVE WITil Generic seismic tests Test

} J_601 (Q) VALVES I ACCESSORIES MASONEILAN completed j '

were performed.

SOLENOID DAYTON enedc seismic tests

-603 (Q) " " "

VALVES VALVES VALCOR/T. BROWN , t J IEEE 344-1975 1

aus 31 's30 2 4 9 2 80 .

SEISMIC QUALIFICATION TEST SCllEDULE ,

CONTROL SYSTEMS SIIEET 7 OF 18 P.O. DESCRIPTION ITEMS BEING VENDOR OR TESTING LO ESCRIPTION REMARKS TO F NO. OF P.O. TESTED LABORATORY Ti!E TEST

BUTTERFLY VALVES & FISHER Generic seismic tests Test I VALVES / YLE ACTUATORS CONTROLS were performed. completed l

PRESSURE PRESSURE AMERICAN Seismic tests were Test

J-610 (Q) REGULATORS MAROTTA/ENVIR.Co.

REGULATORS performed completed 2

J-703 (Q) FLO C ECK ALVE

^ N! e r est CllE completed VALVES N RUMENT Qua Med jJ-705 (Q)

VALVES NONE NONE UONE See Remarks by analysis i

1

} '

enedc seismic tests SEISMIC SEISMIC and analysis were Test

- 07 (Q) INSTRUMENTS INSTRUMENTS NEMETRICS/WW.E performed completed M A ene seismic tests J-730 (Q) FLEXIBLE IIOSE Test ilOSE BELLOWS / AETL were performed completed i ASSEMBLY

u 31 'a3 0 2 4 9 2 8 0 -

SEISMIC QUALIFICATION TEST SCIIEDULE ,

CONTROL SYSTEMS SilEET 8 OF 18 P.O. DESCRIPTION ITEMS BEING VENDOR OR TESTING LO T ON F REMARKS NO. OF P.O. TESTED LABORATORY "

TIIE TEST est SAFETY RELIEF VALVE ' POSITION p{ cedure (Q) INDICATION LATER NDT/WYLE 11U ILLE itted by SYSTEM (ALA) end of 1983 TION AND LOOSE PART LOOSE PARTS Generic seismic tests J-803 (Q) MONITORING MONITORING ROCKWELL/WYLE and analysis were Test SYSTEM performed completed CABINETS

~

EMERGENCY ANALOG AND eismic tests will be Test RESPONSE DIGITAL REMOTE S' '& END OF 1983 ,

J-818 (Q) FACILITIES UNITS COMPLETE RO U CINCINNP.TI 1erf rmed in accordance procedure is DATA ACQ. WITII ALL CABLES

" "" dith IEEE 344-1975 under review (ogiro}

SYSTEM AND CARD ASSY

\

w

aus at 'a3024 9 2 80 .

1 j SEISMIC QUALIFICATION TEST SCllEDULE .

MECllANICAL SilEET 9 OF 18  !

i P.O. DESCRIPTION ITEMS BEING VENDOR OR TESTING LO ESCRI N ON REMARKS l TO F NO. OF P.O. TESTED LABORATORY TIIE TEST STAND BY eismic Mst for Hope l . SWITCII PANELS WYLE Creek (RRS) requirements80-018 (Q) DIESEL TERM DOXES GENERATOR completed.

I Envir & seismic test j completed on a generic M-018 (Q) "

COMPONENTS COLT basis enveloping flope i

creek. requirements.

I i.

M-018 (Q) " ENGINE, COLT Analysis I

(

' Seismic test for Hope

" PANELS Creek (RRS) requirements lM-018 (Q) (CONTROL)

LE ,

completed.

4 3

'b 0 Analysis lM-020 (Q) WATER SCREENS SEPT.26,1983 l . CONTROL Test planned as shown.

M_020 (Q) PANEL ROYCE MIDCO LA,Ca.

AUG 31 '83 0 2 4 9 'd 6 0 .

SEISMIC QUALIFICATION TEST SCllEDULE ,

MECIIANTCAL SilEET 10 OP 1 R P.O. DESCRIPTION ITEMS BEING VENDOR OR TESTING LO t ON F REMARKS NO. OF P.O. '"ES TE D LABORATORY TIIE TEST M-047 (Q) EE Gened c test completed COMB ER M R

" No seismic testing for Vendor to M-047 (Q)

SKID llope creek SKID planned qualify by similt -ity .

No seismic test planned Vendor may

" " as yet. Probable time qualify by M-047 (Q) CO!NROL PANEL period is 2nd quarter similarity 1984 Vendor is in llYDROGEN POWER

"~ ^(OI RECOMBINER PANEL as yet. a new EQ ROCKWELL program.

s CONTAINMENT M-048 (Q) INST. GAS COMPRESSOR Analysis COMPRESSOR MOUNTED ^

  • M-048 (Q) SKID Test date is not DEVICES fi"#1i*"d IIENDRICKS S b lII

AUG 31 '830 2 4 9 2 8 0 SEISMIC QUALIFICATION TEST SCIIEDULE

! MECHANTCAL SilEET 11 OF 18 P.O. DESCRIPTION ITEMS BEING VENDOR OR TESTING LO T ON P REMARKS NO. OF P.O. TESTED LABORATORY "

TIIE TEST CONTAINMENT

M-048 (Q) INST. GAS MOTOR WESTINGIIOUSE Generic test COMPRESSOR SACS
M-069 (Q) IIEAT Analysis EXCl!ANGES s-070 (Q) SACS PUMPS FUEL POOL "

M-071 (Q) IIEAT ~~

EXCHANGER s

SELF Gen ric report, test M-076 (Q) CLEANING MOTOR WESTINGIIOUSE completed.

STRAINER M-076 (Q) Analysis

as31830249280 -

SEISMIC QUALIFICATION TEST SCHEDULE .

MECllANICAL SilEET 12 OF 18 P.O. DESCRIPTION ITEMS BEING VENDOR OR TESTING LO DESCRIPTION TO OF THE N G M REMARKS NO. OF P.O. TESTED LABORATORY TIIE TEST i

SERVICE

M-080 '(Q) WATER Analysis PUMPS i

IIORIZONTAL "

M-082 (Q) CENTRIFUGAL PUMPS 1

M-082 (Q) PUMP MOTOR WESTINGilOUSE op e i

I I

, DIESEL FUEL jM-092 (Q) OIL TRANSFER " "

PUMPS (FOR T E PUMP) ,

~

1

M-G92 (0) Analysis i

I.

< e-

} DIESEL FUEL M-105 (Q) OIL STORAGE TANKS i

I i

am at 83024 9280 -

. SEISMIC QUALIFICATION TEST SCllEDULE '

MECilANICAL SilEET 13 OF 18 P.O. DESCRIPTION ITEMS BEING VENDOR OR TESTING LO TO P REMARKS j NO. OF P.O. TESTED LABORATORY THE N G N Tile TEST 1

NUCLEAR Static deflection test . .

3 for demonstrating elsmig jM-141 (Q) SERVICE 9 i RELIEF VALVES " operability'" Completed by a s M-147 (Q) ""

NER l 4

I M-150 (Q) i

PRESSURE RELIEF .

!M-177 (Q) BLOWOUT -

l i PANEL

!M-707 (Q) EXPANSION i -707A(Q) i l AIR

!M-711 (Q) IIANDLING UNITS

AUG 31 '830 2 4 9 2 8 0 SEISMIC QUALIFICATION TEST SCllEDULE MECi!ANTcAL SilEET 14 OF 18 P.O. DESCRIPTION ITEMS BEING VENDOR OR TESTING LO T ON OF REMARKS NO. OF P.O. TESTED LABORATORY OF Tile PROGRAM Tile TEST "T ^L Generic test completed M-713 (Q) NS MOTORS WESTINGIIOUSE M-713 (Q) "

FANS Test completed OR O./WYLE M-713 (Q) ACTUATOR ITT/WYLE M-716 (Q) FIRE DAMPERS FIRE DAMPERS RUSKIN/WYLE ,

CONTROk, Testing M-717 (Q) DAMPERS & Analysis & Testing completed ACTUATORS No new testing r>1 a n ne d .

VAN AXIAL Analysis M-719 FANS I .

Aus at '8302 4 9 280 SEISMIC QUALIFICATION TEST SCIIEDULE -

MECHANICAL SHEET 15 OF 18 P.O. DESCRIPTION ITEMS BEING VENDOR OR TESTING LO TION TO F THE PROG M REMARKS NO. OF P.O. TESTED LABORATORY Tile TEST CENTRIFUGAL

!M-723 (Q) LIQUID Analysis CHILLER BUBBLE TIGHT -

'M-72S (Q) DAMPERS i \

BUBBLE TIGIIT DAMPERS Generic qualification limitorque j .M-728 (Q) CONTROL tests completed limit switch DAMPERS solenoid G

M-731 (0) fOk,ItG OIL ,

Analysis s

M-733 (Q)

"^ L"T TECIINO . C ORP . Test. completed RS S CH H NST. Analysis

)M-780 (Q)

Ms 31 '830 2 4 9 2 8 0- -

,i SEISMIC QUALIFICATION TEST SCHEDULE i

MECHANICAL SHEET 16 OF 1R j P.O. DESCRIPTION ITEMS BEING VENDOR OR TESTING LO AT O ESCRIPTION REMARKS OF NO. OF P.O. TESTED LABORATORY TIIE TEST ACTON Test plan / procedure not Panel mountei l

PIELD MOUNT completed possible COMPSIP/ACTON devices may M-780 (Q) IIVAC INST. INST. AND 2nd QTR 1984 testing 2nd quarter,84 I DEVICES PANEL MOUNTED be . _ - a j DEVICES prequalified l

R Analysis M-786 (Q) g i

t AIR FILER HEAER & A est to M scheduled

!M-786 (Q) SYSTEM CONTROL PANEL AAF/INDEECO/NUTilERF NUTHERM by Dec. 1933

[

i

!M-786 (Q) AIR FILTER DUCT I! EATER AAF/NUTIIERM SYSTEM

)

I M-786 (Q) ST FIRE DETECT. AAP/ WALTER KIDDE/

' wyle WYLE i

i 8

v i .

I I-

ms31s30249280 SEISMIC QUALIFICATION TEST SCHEDULE .

j ' PLANT DESIGN SHEET 17 OF 18

, P.O. DESCRIPTION ITEMS BEING VENDOR OR TESTING LO O F REMARKS NO. OF P.O. TESTED LABORATORY " ~

l i

THE TEST i

i lP-301 (Q) VALVES Anal; sis k

l

' Generic test reports Limit switch VALVES are submitted for solenoids

P-301 (Q) CONTROL various control devices conax conn ACCESS Test completed. valve oprt i etc.

I lP-302 (Q) VALVES AIR ACTUA'IOR Test completed I

l I

~

]

j'-303 (Q) VALVES LIMITORQUE Generic test report i- ACTUATOR -

submit.ted-Test completed l s P-303 (Q) VALVES PE TIC ted report ROCKWELL/ HILLER Co e 6 i ACTUATOR i,

~

i

)

HUNTSVILLE, BUTTERFLY METRIX

! -305 (Q) VALVES ACTUATOR WYLE ALABAMA Test completed lP AUG.22-26'83

.)

I

~

Aus 31 '830 2 4 9 28 0 SEISMIC QUALIFICATION TEST SCIIEDULE .

PLANT DESIGN SIIEET 18 OF 18 P.O. DESCRIPTION ITEMS BEING VENDOR OR TESTING b

^ ^"

DESCRIPTION T " E E RKS NO. OF P.O. TESTED LABORATORY OF TIIE PROGRAM TE S Analysis for butterfly P-305 (Q) BUTTERFLY valves VALVES

" e c P P-305 (Q) E L'IMITORQUE g e ACTUATOR

" MOWR Static deflection test 9-305 (0) OPERATED D. I. F* completed VALVES e-

c; ;7,, . ,, ; ~y . z,, , 3, ,,

,;,2- ~gyrog@g,r;-es7,'f -1 a -

~

~ '

Aus 31 's30'2 4 928 0

~

" ~

~

~'

- - / ** / ENV{RONMENTAL OUALIFICA'? ION;fEST'OCIIEDULE
*? . .- u

,t.

1 f-

/ ', ~ * { 's ' ..  ; . - . '.~~ ,-

~J;ELECTQIChh/CgN;fROIpSYS?BMS , 'l ( , - / .GjlEET 1,OF 3  ;

.. .- - ~ .

P.O. DESCRIPTION ITEMS BEING 'VEN ROP,.5ShING ~

REMARKS LOCAT O F-NO. OF P.O. TESTED ' LABORATORY THW TEST- -

MOTOR CONTROL Test will be performed E-ll8 (Q) 480V. M.C.C. CENTER DEVICES CUTTLER IIAMMER OF l9 in accordance with LATER EEE 323- M LATER Vendor has identified DEVICES OF .cenain Mces Weh r NSTRUMENT E-154 (Q) A. . UN UNINTERRUPTIBLE CYBEREX/WYLE have to be aged prior -

POWER SUPPLY IlUNTSVILLE to the seismic tests.

)

2nd QUARTER Panel devices will be REMOTE J-201 (Q) CONTROL LATER COMSIP/ACTON tested in accordance PANELS with IEEE 323-1974 RADIATION Test will be performed A s A TER in accordance with J-371 (0) MONI'IORING DETEC'IORS TEC HENDRICKS OF M84 IEEE 323-1974 SYSTEM CINCINNATI (O!!IO) e

as 31 83 U 2 4 9280 II .

ENVIRONMENTAL OUALIFICATION TEST SCilEDULE MECIIANICAL SIIEET 2 OF 3

]

P.O. DESCRIPTION ITEMS BEING VENDOR OR TESTING LO TIM NO. OF P.O. TESTED LABORATORY TO P OF THE P E M REMARKS THE TEST i

M-04 7A (Q) Generic test completed hCOMB ER O R ROCKWELL Comp ~nents testing to

" " sta d in 1st qua ner M-047A(Q) SKID ROCKWELL 1984 1

No testing planned

M-047A(Q) CONTROL PANEL Mild environment

! Testing to start in 1st Vendor is in

" " quarter 1984 continuing the process

!M-04 7A(Q)

POWER PANEL R0CKWELL

,, through 1st quarter in of developing

! 1985 a new EQ

! program

, s l CONTAINMENT FARWELL IN PROGRESS SKID MOUNTED To be jM-048 (Q) INSTRUMENT DEVICES

& Aging is being done

GAS COMPRESS HENDRICKS SDRC,OllIO completed by

., COMPRESSOR Nov.1983 j

j No environmental jM-048 (Q) "

COMPRESSOR testing. Seismic 1 qualification by l ,

analysis, i

M-048 (Q) MOTOR WESTINGIIOUSE Generic test completed.

AUG 31 ~83 0 2 4 9 2 8 0 ENVIRONMENTAL OUALIFICATION TEST SCHEDULE

  • MECilANICAL/ PLANT DESIGN SilEET 3 OF 3 P.O. DESCRIPTION ITEMS BEING VENDOR OR TESTING LO DESC M TION REMARKS TO F THE N G M NO. OF P.O. TESTED LABORATORY TIIE TEST FIELD AND 2nd QUARTER . Only inst.

P "

M-780A(Q) IIVAC INST. PANEL MOUNTED COMSIP/ACTON 1984 1 cated in s t ed in S p '83 harsh envir.

INSTRUMENTS.

to be tested.

I M-786 (Q) gy DETFCT N AAP/KIDDE/WYLE WYLE c 19 SYSTEM M-786 (Q) IIEATERS No environmental test

" CONTROL e scheduled by M-786 (Q) PANELS AAF/NUTIIERM Dec. 1983 Rotork is to submit VALVES & ROTORK

- 02/303 ROTORK LATER quotation for ACTUA'IORS ACTUATOR A submergence test