Describes Addl Mgt Initiatives Implemented to Change QA Plans.Joint Final Insp of Sys & Components Released Prior to Start Proposed
ML20078M248
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 07/29/1983
From: Koester G
KANSAS GAS & ELECTRIC CO.
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
KMLNRC-83-100, NUDOCS 8310250084
Download: ML20078M248 (5)


Text

r

~

KANSAS GAS AND ELECTRIC COMPANY THE ELECTAiC COMPANY GLENN L MOESTER vect reasios=v. nuctram July 29, 1983 Mr. W.C. Seidle, Chief Reactor Projects Branch 2

]g gg U.S. Nuclear Regulatory Commission Region IV s

611 Ryan Plaza Drive, Suite 1000 i

Al)G I E

Arlington, Texas 76011

.O KMLNRC 83-100 Re: Docket No. STN 50-482 Ref: 1) Letter KMLNRC 83-019, dated March 2, 1983 from GLKoester, KG&E, to JTCollins, NRC

2) Letter KMLNRC 83-045, dated April 21, 1983 from GLKoester, KG&E, to RCDeYoung, NRC Subj : Wolf Creek Generating Station System Turnover Quality Action Plan

Dear Mr. Seidle:

As discussed recently with you and Mr. Gagliardo, we are implementing certain additional management initiatives to increase our assurance that the quality objectives for our Wolf Creek Generating Station will receive additional emphasis. These plans were presented to your Resident Inspectors on Monday, July 18, as you requested.

The additional reanagement initiatives consiot of the following actions and/

or changes to existing plans:

1) Acceptance inspections of the DIC (Daniel) scope of work for systems, subsystets and components relm sed prior to turnover to Startup.

The existing plan consists of DIC performing its in-proceas inspections followed by a final inspection prior to submittal to KG&E Construction Management for its Construction /Startup acceptance inspection. DIC will continue to perform its in-process inspections through completion of a specific work scope; however, we are modifying the final acceptance inspection activity as follows:

Instead of the series approach of first the DIC final inspection and then the KG&E Construction /Startup final inspection, DIC and KG&E will conduct a joint finsl h

a 8310250084 830729

[

PDR ADOCK 05000482 1

,b A

PDR pb (N '

I )

l v

201 N. Market -Wichita, Kansas - Mail Address: RO. Bor 208 I Wichita, Kansas 67201 -- Telephone: Area Code (316) 261-6451

i Mr. W.C. Seidle KMLNRC 83-100 July 29, 1983 inspection. Authority and accountability for the joint final inspections will be maintained separate with KG&E retaining final authority. Unacceptable elements of the work will be returned to the DIC Quality process for corrective action.

The above modification will provide KG&E the opportunity to enter the completion inspection process earlier and at a level of. detail that will provide for more prompt identification of problems and entry into the DIC corrective action program.

This approach will also result in one exception list of common data and wording for improved communications. The identified exceptions will.be tracked through to satisfactory resolution and will provide high visibility to both DIC and KG&E management regarding the level of performance being achieved. This will provide improved information for senior project management for management involvement, guidance and follow-up on corrective actions as might be required.

This plan modification will be implemented on safety-related systems and will be continued until quality results demonstrate

- that this extra effort by KGEE can be reduced, or terminated.

KG&E QA will continue its verification functions as currently performed; however, QA's final verification function will be conducted prior to system turnover to startup, rather than after turnover. On systems now turned over to startup, the QA verifications will be completed on a priority compatible with the schedule for conduct of pre-operational tests.

2) Consolidation of DIC and KG&E Construction QC personnel into one Combined Review Group for the final review and acceptance of DIC Construction quality documentation.

The Combined Review Group will report to DIC senior management; however, KG&E will' place lead personnel in three of the work disciplines --- welding, including piping and piping hangers, electrical and civil. In the other two work disciplines ---

piping / mechanical and material receiving --- KG&E personnel

.will be assigned to the assistant lead positions. The Combined Review Group will be made up of approximately 50% DIC personnel and 50% KG&E personnel.

As an additional check on the effectiveness of the above modified approach, the KG&E Construction QC Group will continue to perform spot check verifications of the documentation accepted by the Combined Review Group to provide additional assurance of program effectiveness. KG&E QA will continue its Quality Assurance program activities on this work.

L

m

~

Mr. W.C. Seidle-KMLNBC'83-100 July 29, 1983 The above-modified approach will increase KG&E management involven.ent at an earlier-time and at a detail level in the

- review process, thus providing early awareness of potential problems.so that prompt and adequate corrective actions can

.be taken. This approach ~also results in the production of one exception list which will bei tracked to satisfactory j

resolution. Additionally, the improved communic 4tions will

~~ enhance the quality and efficiency of this final review

process, j

s

'3) We are changing the Hanger Assessment Group..from reporting to'KG&E Construction to Bechtel Project Engineering's Assistant Project Engineer in residence at the Site..Although this group now consists of Bechtel engineering' personnel, we believe it to be more appropriate and quality effective to have-this group under the technical direction of Bechtel Engineering.

4) Completion of documentation review of DIC Construction of pipe and supports prior to turnover.to Startup.

~

Our present approach requires that the quality documentation review for all pipe pressure boundary elements, including

. welded attachments and non-pressure boundary elements to be complete prior to turnover. We are changing our approach 1

to allow the documentation review for non-pressure boundary support elements to be completed after turnover. Although this approach presents some economical risk should we have l..

to rework certain supports, we consider it a prudent manage-ment approach to allow us to move forward in a timely manner with the pre-operational test program. The documentation not reviewed prior to turnover will be identified as an

~

exception for.each. support assembly and then scheduled and l

. tracked.to satisfactory c10seout prior to the start of hot functional integrated testing. To provide a contingency to the timely completion of this work,'we have set an arbitrary completion deadline of 30. days prior to the start of hot functional testing.

[

We will also apply this same approach to the review of 1 ocumentation on supports for HVAC systems.

j d

e l

l

5) I&E Bulletin 79-14 Pipe Configuration - Supports inspection l

walkdowniand associated engineering adequacy evaluation.

I I-Bechtel Project Engineering will conduct walkdowns in order I

to have the engineering' organization who performed the L

ip

,,_.mw-...

_,_.4

.,,,._m.mr,,#-..

..m.

.w,.v,---,,_._xvv..

,,.y y.

,-.n..

c,., 4.w.

y 7

0'

-Mr. W.C. Seidle KMLNRC 83-100 July 29,1983 analysis-and the design and who is familiar with the

-intended design functions of this walkdown. In addition to this inspection activity serving as an additional check

.on the' adequacy of construction, it also provides our -

engineer with an additional check of his analysis and design... both of which will provide added assurance on quality and on high unit load factor and availability.

We will also perform this activity on certain safety-related systems not included in the scope of the 79-14 program and non safety-related systems that are important to achievement

'of high unit load factor and availability and on selected portions of our radwaste systems to minimize potential maintenance problems during plant operation.

6) Final acceptance criteria.

In the past various organizational elements of our overall project structure have been making a multiplicity of

. interpretations of Bechtel's specifications and approved

~ construction drawings.

This has resulted in each organizational element creating its own acceptance inspection criteria. To resolve.this inefficient approach, we have requested that Bechtel Engineering select from.their various drawings and specifications the important' quality characteristics criteria that should be used in the acceptance inspection process. Bechtel-has completed this selection for pipe, pipe supports, mechanical equipment and electrical. Bechtel is completing this selection for the remaining cLvil work. This effort establishes l

standard-inspection criteria and removes personnel in the l

various organizational elements from acting in the role of l

our engineer. This modification in approach will provide significant benefits to our' quality program by placing j'

additional emphasis on major quality characteristics and reducing emphasis on minor quality characteristics.

The above Bechtel effort applies to both inspections of l

hardware and review of quality documentation.

L I

Wo believe the above management initiatives will provide.significant benefits to'our quality program in the final phase of the project.

In addition to tho 3.

added emphasis placed on our first project objective of obtaining a safe and reliable operating unit, we also expect-schedule and cost benefits from re-emphasizing the "Do it right the first time" fundamental of management.

n. -

Mr.-W.C.'Seidle KMLNRC 83-100 July 29, 1983 We believe these initiatives are critical and prudent and will enhance our overall. quality program as we prepare the unit for safe and reliable operation.

We want to express our appreciation to you and your Resident Inspectors for your constructive observations and comments.

Yours very truly,

/S/b Glenn L. Koester Vice President - Nuclear GLK:bb cc: RCDeYoung HRoberds/WSchum KRBrown/WCadman DTMcPhee JMulholland i

4 u--e, 9

,mp-t-

-+Ww.

Tr N

q e-

- --- 9wW

--wg e-gy y-w-

->**=-mw

-7me ee---e?-y 7

-qrw9

&-n y-m