JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2

' NARRATIVE

SUMMARY

OF OPERATIONS SEPTEMBER, 1983 During the raonth of September, there was one-unit shutdown on September 16, 1983 which initiated the Cycle II - III refueling outage.

The following safety-related maintenance was performed in the month of September:

1. Performed miscellaneous maintenance on diesel generators.
2. Repaired 2C CCW pump.
3. Performed vibration analysis on 2A CCW pump.
4. Cleaned out 2A, 2B and 2C charging pump oil coolers and service water lines.
5. Commenced core offload.

av 8310180134 831004 PDR-ADOCK 05000364 R PDR

r OPERATING DATA REPORT DOCKET NO. 50-364 DATE 10/4/83 COMPLETED BY W. G. Hairston, III TELEPHONE (2051899-5156 OPERATING STATUS J seph M. Farley - Unit 2 Notes X. Unit Name:

2. Reporting Period: September, 1983 1) Cumulative data since 2652 7/30/81, date of
3. Licensed Thermal Power (MWt):

860 commercial operation.

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):

829

6. Maximum Dependable Capacity (Gross MWe):

854.7 813.7

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A f 9. Power Level To Which Restricted. If Any (Net MWe): N7A

10. Reasons For Restrictions. If Any: N/A This Month Yr to-Date ~ Cumulative

. I1. Hours in Reporting Period 720 6,551 19,032

, 12. Number Of Hours Reactor Was Critical 383.1 6,214.I 16,998.6 0.0 0.0 N

13. Reactor Reserve Shutdown Hours
14. Hours Generator On.Line 383.0 6.214.0 16.816.4
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 937.869 16,355,802 41,777,616 288,648 5,153,680 13,826,914
17. Gross Electrical Energy Generated (MWH) _
18. Net Electrical Energy Generated (MWH) 269.658 4.897.656 13.I13,706
19. Unit Service Factor 53.2 94.9 88.4
20. Unit Availability Factor 53.2 94.9 88.4
21. Unit Capacity Factor (Using ilDC Net) 46.0 91.9 84.7
22. Unit Capacity Factor (Using DER Net) 45.2 90.? 83.1
23. Unit Forced Outage Rate 0.0 0.0 5.0
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Eachi:

N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup: October 24. 1983
26. Units in Test Status (Prior to Commercial Operationi: Forecast Achieved i

INITIA L CRITICA LITY 5/6/81 5/8/81 -

INITIAL ELECTRICITY 5/74/R1 5/25/A1 COMMERCIAL OPERATION 8/1/81 7/30/81 (u!!7 i

-we,...__-_-.___.. - _ _

~

DOCKET NO, 364 UNIT 2-1

^

DATT. 10/4/83 _

W. G. Hairston, III CO5tPLETED BY

- TELEPHONE (205)899-5156 september, 1983 MONT11

-DAY AVERACE DAILY POWER LEVEL DAY- AVERAGE DAILY POWER LEVEL (MWe Net) (SIWE-Net) 774 37 0 I.

775 13 0 2 4 770 g9 0

., 3 746 gg 0 4

738 0 5 21 734 0 6 _ 22 722 0 7 23 g 709 24 0 702 33 o 9

693 26 0 10 gg 687 27 0 g2 678 3 0 g3 679 a

, O 680 0 I4 30 IS 31 16 612 i

f l

EISTRUCTIONS On this form:t. list the sversge daily unit power levelin MWe Net for each day in she reporting rnurith. Compute to

, the neste:t whole me;swatt.

l-t (9(77) 1 l

l

DOCKETNo. 50-364 UNIT Sil01 DOWNS AND POWER REDUCTIONS J.M. Farley-Unit 2 UNIT NAM E

  • DAIE Y4 /_83 COMPLETED lly W.G.Hairston,III REPORT MONill September. 1983 TELLPilONE ~(765)899-5156 ,

"L

, ,hg Licensee ,E.t, . Cause & Corrective No. Date g 3j g 3 s[5 Event gg go3 Action to F y.c 5 ygc Report # -

in U o u

Pacvent Recur:ence t

c5 001 830916 s 337.0 C 1 N/A N/A N/A Unit was taken off line for the Cycle II - III refueling outage.

I 2 3 4 1:: l'orced Reason: Method: Exhibit G . insitucti .n-S: Scheduled A Equipment Failure (Explain) 1 -Manual for Preparation of I).ii.,

il Maintenance of Test 2 Mannal Scram. Ent:y Sheets for I.icen .. .-

C Refueling 3 Automatic Scram. Event Report (1.ER)I & INtlREG-D Regulatmy Restriction 4 Other (limplain) 0161)

E Operator Training A license Examination F Adminisisative 5 G 0.ciational 6 Essor (Explain) Esinbit I - Same Sone .

('J/17) II Of hes (Explain)

VrF e

i JOSEPH M. FARLEY NUCLEAR ?LANT UNIT 2 NARRATIVE

SUMMARY

OF OPERATIONS SEPTEMBER, 1983

'During the month of September, there was one unit shutdown on September 16, 1983 which initiated the Cycle II - III refueling outage.

The following safety-related maintenance was performed in the month of September:

1. Performed miscellaneous maintenance on diesel generators.
2. Repaired 2C CCW pump.
3. Performed vibration analysis on 2A CCW pump.
4. Cleaned out 2A, 2B and 2C charging pump oil coolers and service water lines.
5. ~ Commenced core offload.

i a

P

)

a l

I OPERATING DATA REPORT DOCKET NO. 50-364 DATE 10/4/83 COMPLETED BY W. G. Hairston, III TELEPHONE (205)899-5156 OPERATING STATUS '

l. Unit Name: J seph M. Farley - Unit 2 Notes
2. Reporting Period: September, 1983 1) Cumulative data since 2652 7/30/81, date of
3. Licensed Thermal Power (MWt):

860 commercial operation.

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):

829

6. Maximum Dependable Capacity (Grcss MWe):

854.7 813.7

7. Maximum Dependable Capacity (N A MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since.Last Report. Give Reasons:

N/A

9. Power Level To Which Restricted. If Any (Net MWe): N7A
10. Reasons For Restrictions.If Any: N/A This Month Yr. to-Date ' Cumulative

~

II. Hours in Reporting Period 720 6,551 19,032 38 6,214 16, 6

12. Number Of Hours Reactor Wu Critical
13. Reactor Reserve Shutdown Hours
14. liours Generator On Line 383.0 6 214.0 16.816.4
15. Unit Reserve Shutdown Hours 0.0 , O.0 0.0
16. Gross Thermal Energy Generated (MWH) 937,869 16,355,802 41,777,616 288,648 5,153,680 13,826,914
17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MWH) 269.658 4.897.656 13.I13,706
19. Unit Service Factor 53.2 94.9 88.4
20. Unit Availability Factor 53.2 94.9 88.4
21. Unit Capacity Factor (Using MDC Net) 46.0 91.9 84.7
22. Unit Capacity Factor iUsing DER Net) 45.2 90.2 83.I
23. Unit Forced Outage Rate 0.0 0.0 5.0 j 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Eacht:

N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup: October 24. 1983
26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIA i. CRITiCAi.lT , 5/6/81 5/8/81 INITIAL ELECTRICITY s/74/R1 5/25/R1 COMMERCIAL OPERATION 8/1/81 7/30/81 pn

DOCKIT NO. 50-364 UNIT 2 Il DATE 10/4/83 I W. G. Hairston, III COMPLETED BY TELEP110NE (205)899-5156 September, 1983 blONTil DAY AVERAGE DAILY POWER LEVEL DAY' AVERAGE DAILY POWER LEVEL (MWe Net) (MWe-Net) 774 0 37 I.

2 775 13 0_,

770 g9 0 3

~

746 0 4 20 738 0 5 _

21 0

6 734 . E 722 23 c

7 -

709 0 g 74 702 25-0 9

693 ;g 0 10 687 0 11 27 678 0 12 3 679 29 0 13

( 0 680 30 l 14

- IS 31 16 612 M UCEONS On this form:t. list the sversge daily umt power levelin MWe-Net for esch d:y in the reporting month.Campute to

, the neare:t whole mepwatt.

(9(77)

_ __:_.._ _ 2 _ - _ - _ - _ . _ _ - - - - - - . . . . _

~ ~

DOCKET NO. 50-364 .

UNIT Silll1 DOWNS AND POWER REDtEllONS J.M. Farley-Unit 2 UNIT NAhlE i I)AIE Y4 /$6_3 ,

COMPLETEI) IlY W.G.Hairston,III REPORT MON iil _ September, 1983 TEl.EP110NE D S)899-5156 I.

- E E jg };; E - Licensee -

, ,E r, " e.

g Cause & Corrective No. Date H

g 3g }3 gg

.g s ca}c Event Repost

  • g-mO glo Action to p,,,en, geco,,coc, fE & e -

o o

l  ! '

6 j .

1, j 001 830916 s 337.0 C 1 N/A N/A N/A , Unit was taken off line for the Cycle J 11 - III refueling cutage.

)

i, i .

i i

1 i

I i

I .

I 2 3 4

}

, l': 17orted Reason: hiettu>d: Exhibit G . Instructin"

S
St heiluted A Equipment Failure (Explain) 1 -klanual for Picparation of Data j li Maintenance of Test 2 Manual Scram. Entry Sheets for I.iten -

C Refocling 3 Autoniatic Scram. Event Report (l.ER)14 iNilRfG-D Hegulatosy Resteiction 4 Odies (limplain) 0161) l~ Opciator Tealning A license Examination F Aihninistsative 5 G Opciational I.isor (limplain) thinbit 1 Same Soue.

l'8/17) 11 Othes (E xpl.iin)

. _ Mdhg hMmp Alabama Power Company 600 North 18th Street Post Offica Box 2641 Birmingham Alabama 35291_

Telephone 205 783-6081 F. L Clayton, Jr.

%%;';0;Tf,*"' A!abamaPbwer the southern electnc system October 12, 1983 Docket No. 50-364 Director, Office.of Management Information and Program Control U. S.: Nuclear Regulatory-Commission

. Washington, D.C. 20555

Dear Sir:

RE: Joseph M. Farley Nucicar Plant Unit 2 Monthly Operating Data Report l,

Attached are two (2) copies of the September, 1983 Monthly Operating Report for Joseph M. Farl ey Nucl ear Pl ant, Unit 2, required by Section 6.9.1.10 of the Unit 2 Technical Specifications. As requested by letter from Mr. John F.

Stol z to Mr. Alan R. Barton, dated Octaber 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report.

If you have any questions, please advise.

Yours very truly, b6CId"(

'F. . Clayton J r.'

FL CJ r/KWM : n ac Enclosures xc: Mr. Ted Cintula (1 copy)

Director, IE (10 copies)

Director, RII (1 copy) t t

.- ..-. . .