ML20078J621

From kanterella
Jump to navigation Jump to search
Deficiency & Part 21 Repts Re GE SFF-30 Relays.Evaluation Concluded Deficiency & Substantial Safety Hazards Do Not Exist
ML20078J621
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 10/06/1983
From: Foster D
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8310170566
Download: ML20078J621 (1)


Text

.

Geog aFc erCompanf 333 P edmort Asence At!sta. Gecrg a 30303 Teh? chore 404 520 772G M H ng Address Post Cif ce Box 4545 A:!rta Gecrg a 30302 L

Georgia Power D. O. Foster t+ e. Wm en to s,mm V:ce Pres cort and Goreral Mra-pr Vogue Prc;t.ct October 6, 1983 United States Nuclear Regulatory Commission Office of Inspection and Enforcement Region II - Suite 3100 101 Marietta Street Atlanta, Georgia 30303

Reference:

Vog Q Electric Generating Plant - Units 1 and 2, 50- 244 50-425; General Electric SFF-30 Relays Attention:

Mr. James P. O'Reilly Gentlemen:

Georgia Power Company has conducted an evaluation to determine the reportability of the above referenced concern under Part 10 CFR 50.55 (e) and Part 10 CFR 21.

Our evaluation has concluded that a significant deficiency and a substantial safety hazard do not exist since there was no affect upon the safety of operations of the nuclear power plant.

This letter contains no proprietary information and may be placed in the NRC Public Document Room upon rece,ip 1

/

Yours/'t fy',', _ /

D',1' O., ost/r[

/

DOF/CWH/cc xc:

U.

S. Nuclear Regulatory Commission Document Control Desk Washington, D.

C.

20555 xc:

R. J.

Kelly R.

H.

Pinson E.

D.

Groover R.

E. Conway B.

M. Guthrie L.

T.

Gucwa G.

F.

Head R.

A. Thomas M.

Malcom J.

T. Beckham Jr.

J.

A.

Bailey G.

Bockhold D.

N. MacLemore O.

Batum P.

D.

Rice D.

E.

Dutton H.

H.

Gregory III J.

L. Vota W.

F.

Sanders R.

E.

Folker 8310170566 831006 PDR ADOCK 05000424 h

0