ML20078H540

From kanterella
Jump to navigation Jump to search
Forwards three-shift Schedule for Manning Control Room W/Existing Control Room Supervisory Complement & List of Addl Personnel Undergoing Training.Forms for Addl Personnel Will Be Forwarded During Wk of 831003
ML20078H540
Person / Time
Site: Beaver Valley
Issue date: 09/29/1983
From: Carey J
DUQUESNE LIGHT CO.
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8310140208
Download: ML20078H540 (2)


Text

_..

l, Dtemle @ W PrCP"-S**"

Shepr.angport. PA 15077 0004 JOHN J CAREY (412) 643 5255 Vice President Nuclear Dmse September 29, 1983

(

Dr. Thomas E. Murley Regional Administrator - Region I U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406

Reference:

Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66

Dear Mr. Murley:

An emergency staffing plan has been developed for the Beaver Valley Power Station, Unit No. 1.

This plan utilizes fully quali-fied, professional and supervisory personnel to perform all activities necessary for the safe operation of the facility.

The control room will be manned by personnel who possess active NRC licenses.

All licensed personnel actively participate in the licensed operator retraining program, including the required simulator training.

The personnel not presently working full time in the control room are undergoing training on recently completed design changes, normal and emergency operating procedures and control room admin-istrative procedures, including watchstanding responsibilities and shift turnover procedures.

Prior to assigning these individuals to control room duties, they will stand a watch under the obser-vation of one of the Senior Reactor Operators who is permanently assigned to control room duties.

This observer will provide a written verification of successful performance of the operating duties by the assigned watchstander.

Enclosed is a three shift schedule for manning the control room with the existing control room supervisory complement and a list of additional personnel undergoing training.

The 398 forms for these additional personnel will be forwarded during the week of October 3, 1983.

If you have any questions on this matter, please contact my office.

Very truly yours, YA 8310140208 030929 PDR ADOCK 05000334 F

PDR J. J. Carey Attachments W t i

\\

-o RTTACHMENT

Reference:

Beaver Valley Power Station September 29, 1983 Unit No. 1 Docket No. 50-334, License #DPR-66 Emergency manning with existing control room complement with SRO licenses:

12-8 8-4 4-12 NSS Turner Schuster Noonan NSOF Hummel Daugherty McGhee NCO Summers Hartner Matsko NCO Nelson Cunning Brosi Venson Additional personnel with SRO licenses are presently in familiarization training to assume shift duties:

Kuhar Instructor Brooks Instructor Superintendent, Licensing Grada Chief-Engineer Druga Schad Operations Supervisor Additionally, H.

Cox, who holds an RO license, will be trained on the control board as soon as possible after the emergency manning plan is implemented.

Prior to this train-ing he will perform attendant duties.

Training of all individuals will be completed prior to submittal of 398 forms.

w