GENERAL OFFICE H_ Nebraska Public Power D. tn. t P.O. Box 499, cOLW60S, NEBRASKA 68601-0499 is c
TEtEeso~E <402> se4-essi LQA8300229 October 6,1983 50-M T Director of Nuclear Reactor Regulation Attention:
Mr. Domenic B. Vassallo, Chief Operating Reactorn Branch No. 2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Mr. Vassallo:
Reference:
- 1) Telecon, J. Weaver (NPPD) to B. Siegal (NRC),
July 28, 1983, " Containment Penetration Splices Final Report"
Subject:
Containment Penetration Splice Repair Cooper Nuclear Station In accordance with the commitment made in Reference 1, this letter is written to inform you that splice repairs have been completed on all essential systems in Cooper Nuclear Station's drywell penetrations. The old tape and splices were removed and new splices, covered with environmentally-qualified heat shrink-able tubing, were installed to ensure system operability during normal, abnormal, and post-accident environments.
Quality Control and Quality Assurance measures were taken to ensure all work was performed properly and within applicable guidelines.
Upon completion, all effected circuits were tested and verified for proper system operation.
If you have any further questions, please feel free to contact my office.
Sincerely, W.
J. M. Pilant Technical Staff Manager JMP/kew:rs6/2 gRADOCK10140190 831006 05000298 h