ML20078G537
| ML20078G537 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 09/28/1983 |
| From: | Foster D GEORGIA POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| GN-262, NUDOCS 8310120296 | |
| Download: ML20078G537 (1) | |
Text
F-1 Georg a Pozar Compry o
? 33 P-edmo':t Avenue At anta Gectg a 00303 i
Te'ecrone O! L26 7726 Ufp r Msg Aadiess.
/g 7 g Pos! O'!;ce Bcx 4545
- b' A':rra Georg'a 30332
%p Pm 33 gg7 3 p
0 D. O. Foster u,* va*:ven e nJr:c w vm V ce Prevdert and Gewal Mcay r Vcg'ie Prorct September 28, 1983 United States Nuclear Regulatory Commission Office of Inspection and Enforcement File:
X7BG03-M44 Region II - Suite 3100 Log:
GN-262 101 Marietta Street Atlanta, Georgia 30303
Reference:
Vogtl ylectric Generating Plant - Unit 1 50-4 4 /50-425; Brown Boveri Reactor Coolant Pump
{Switcgear-GN-247datedAugust2, 1983 Attention:
Mr. James P. O'Reilly Gentlemen:
In our letter GN-247 dated August 2, 1983, Georgia Power Company forecast a completion date of September 23, 1983 to resolve the above reported concern.
At this time, Georgia Power Company is advising the completion date for this report will be rescheduled to October 14, 1983.
The date is being rescheduled because the engineer-ing evaluation is taking longer to complete than was originally forecast.
This letter does not contain any proprietary information and may be placed in the NRC Public Document Room upon receipt.
Yo 1I
//
D. O.
Foster DOF/REF/cc enclosure xc:
U.
S. Nuclear Regulatory Commission Document Control Desk Washington, D.
C.
20555 xc:
R. J. Kelly R.
H.
Pinson E.
D. Groover R. E. Conwa*/
B. M. Guthrie L.
T.
Gucwa G.
F. Head R. A. Thomas M. Malcom J.
T.
Beckham Jr.
J. A.
Bailey G.
Bockhold D.
N. MacLemore O.
Batum P. D.
Rice D.
E.
Dutton H.
H.
Gregory III J.
L. Vota W.
F. Sanders R.
E.
Folker
'OFFICIA1. COPY /
8310120296 830928 o
PDR ADOCK 05000424 S
/
)[